公开(公告)号:US20150232363A1
公开(公告)日:2015-08-20
申请号:US14434572
申请日:2013-10-11
CPC分类号: C03B5/28 , C03B3/00 , C03B5/12 , C03B5/235 , C03B5/2353 , C03B5/2356 , C03B2211/23 , F23C3/004 , F23C3/006
摘要: A melt for use in the production of man-made vitreous fibres may be formed in a circulating combustion chamber (20) by melting particulate material. The material is collected in a base region of the combustion chamber (26), where it can be heated using submerged combustion apparatus (40). The submerged combustion process is controlled to ensure that the proportion of Fe(2+) based on total Fe within the melt extracted from an outlet of the chamber is greater than 80%.
摘要翻译: 用于生产人造玻璃纤维的熔体可以通过熔化颗粒材料在循环燃烧室(20)中形成。 所述材料被收集在所述燃烧室(26)的基部区域中,其中可以使用浸没式燃烧装置(40)进行加热。 控制浸没燃烧过程以确保从室的出口提取的熔体内的基于总Fe的Fe(2+)的比例大于80%。
-
公开(公告)号:US20170321885A1
公开(公告)日:2017-11-09
申请号:US15533941
申请日:2015-12-11
CPC分类号: F23C3/008 , C03B3/026 , C03B5/12 , C03B5/2353 , F23C6/047 , F23C2201/101 , F23L7/007 , F23L2900/07007 , F27B1/20 , F27B15/003 , Y02E20/344 , Y02P40/55
摘要: The invention relates to a method of making a mineral melt, the method comprising providing a circulating combustion chamber which comprises an upper zone, a lower zone and a base zone, injecting primary particulate fuel and particulate mineral material and primary combustion gas into the upper zone of the circulating combustion chamber, thereby at least partially combusting the primary particulate fuel and thereby melting the particulate mineral material to form a mineral melt and generating exhaust gases, injecting into the lower zone of the circulating combustion chamber, through at least one first burner, secondary combustion gas and gaseous fuel and secondary particulate fuel, wherein the secondary combustion gas and gaseous fuel and secondary particulate fuel are injected via a single first burner, wherein the amount of secondary combustion gas injected via each first burner is insufficient for stoichiometric combustion of the total amount of gaseous fuel and secondary particulate fuel injected via that first burner, and injecting tertiary combustion gas into the lower zone of the circulating combustion chamber, through at least one tertiary combustion gas injector, whereby the tertiary combustion gas enables completion of the combustion of the gaseous fuel and the secondary particulate fuel, separating the mineral melt from the hot exhaust gases so that the hot exhaust gases pass through an outlet in the circulating combustion chamber and the mineral melt collects in the base zone. The invention also relates to apparatus suitable for use in the method.
-
公开(公告)号:US09359241B2
公开(公告)日:2016-06-07
申请号:US14362260
申请日:2012-11-29
摘要: The present invention concerns a method of making a mineral melt by burning combustible material in the presence of inorganic particulate material and thereby forming a melt, comprising injecting fuel, particulate mineral material and combustion gas into a circulating combustion chamber (1) through an inlet conduit (4) and combusting the fuel in the circulating combustion chamber (1) thereby melting the mineral material to form a mineral melt and generating exhaust gases; separating the exhaust gases from the mineral melt, collecting the mineral melt (9) and passing the exhaust gases upwards through an exhaust pipe (10) to a conduit (11) of a heat exchange system; and supplying particulate mineral material and a first portion of waste mineral wool into the conduit (11) and pre-heating the supplied material in the heat exchange system, and supplying a second portion of waste mineral wool with a water content between 5 and 25% by weight directly to the inlet conduit (4).
摘要翻译: 本发明涉及通过在无机颗粒材料的存在下燃烧可燃材料从而形成熔体来制造矿物熔体的方法,包括将燃料,颗粒状矿物材料和燃烧气体通过入口导管(1)注入循环燃烧室(1) (4)并且在循环燃烧室(1)中燃烧燃料,从而熔化矿物材料以形成矿物熔体并产生废气; 将废气与矿物熔体分离,收集矿物熔体(9)并使废气向上通过排气管(10)传递到热交换系统的导管(11); 并将微粒矿物材料和废矿棉的第一部分供应到所述导管(11)中并预热所述热交换系统中的所提供的材料,以及将含水量为5%至25%的第二部分废矿棉, 直接连接到入口导管(4)。
-
公开(公告)号:US20150274578A1
公开(公告)日:2015-10-01
申请号:US14434549
申请日:2013-10-11
CPC分类号: C03B37/041 , C03B3/026 , C03B5/0275 , C03B5/12 , C03B5/185 , C03B5/2353 , C03B5/2356 , C03B5/265 , C03B5/28 , C03B37/05 , C03B37/055 , C03B2211/22 , C03B2211/23 , C03B2211/25 , C03B2211/40 , Y02P40/55
摘要: A melt for use in the production of man-made vitreous fibres may be formed in a circulating combustion chamber (20) by melting particulate material. The material is collected in a base region (26) of the combustion chamber, where it can be heated using submerged heating means (40). The submerged heating increases the homogeneity of the melt within the melt pool (30), the increase in homogeneity being encouraged by a relatively long average residence time for mineral material in the chamber (20) of at least 15 minutes.
摘要翻译: 用于生产人造玻璃纤维的熔体可以通过熔化颗粒材料在循环燃烧室(20)中形成。 该材料被收集在燃烧室的基部区域(26)中,其中可以使用浸没式加热装置(40)进行加热。 浸没加热增加了熔池(30)内的熔体的均匀性,同时促进均匀性的增加,使得室(20)中的矿物材料的平均停留时间相对长达至少15分钟。
-
公开(公告)号:US20180073913A1
公开(公告)日:2018-03-15
申请号:US15563152
申请日:2016-03-31
摘要: The present invention concerns a method and an apparatus for gravimetric metering of a powdery bulk material, said system comprising a storage container accommodating the bulk material, a feeding pipe for feeding bulk material from the storage container to a dosing container, a dosing discharge device for continuously discharging bulk material from the dosing container to a discharge pipe and on to a discharge line, wherein said dosing container is mounted on at least one weighing cell, and wherein the feeding pipe is provided with a first flexible tube member and the discharge pipe is provided with a second flexible tube member, and wherein the first flexible tube member comprises a first compensator and a second compensator with a tubular member there between.
-
6.
公开(公告)号:US20210403360A1
公开(公告)日:2021-12-30
申请号:US17368330
申请日:2021-07-06
摘要: A method for supplying pre-heated particulate mineral material from a separating cyclone to a cyclone furnace inlet includes receiving the mineral material in a material receiving conduit from a bottom outlet of the separating cyclone. There is a first pressure in the receiving conduit. The mineral material is fluidised in the receiving conduit and flows upwards in an inclined elongated gas-lock valve from a lowermost section of the receiving conduit to an uppermost section of an outlet conduit. The mineral material is supplied from the outlet conduit to the inlet of the cyclone furnace, wherein there is a second pressure that is higher than the first pressure. A fluidisation unit in the gas-lock valve maintains the particulate mineral material in a fluidised state, such that the fluidised particulate mineral material flows due to gravity from the material receiving conduit, upwards through the gas-lock valve and to the outlet conduit.
-
公开(公告)号:US11034606B2
公开(公告)日:2021-06-15
申请号:US15213639
申请日:2016-07-19
摘要: An apparatus for the production of a mineral melt burns combustible material in the presence of inorganic material to form a melt. The apparatus includes a circulating combustion chamber which receives a fuel, pre-heated mineral material and a combustion gas so as to melt the mineral material and generate exhaust gases which are separated from the melt. The gases pass through an exhaust pipe to a conduit of a heat exchange system. The apparatus includes a quenching hood for quenching the exhaust gases by drafting a cooling fluid, such as ambient air, into the flow of exhaust gases around the exhaust pipe, and wherein the exhaust gases exit the exhaust pipe inside the hood.
-
8.
公开(公告)号:US11878930B2
公开(公告)日:2024-01-23
申请号:US17368330
申请日:2021-07-06
CPC分类号: C03B3/005 , C03B3/023 , C03B5/12 , F27B3/18 , F27D3/0033
摘要: A method and an apparatus for making a mineral melt having a cyclone furnace and a separating cyclone, the apparatus having a device for supplying pre-heated particulate mineral material from a bottom of the separating cyclone to an inlet of the cyclone furnace. A material receiving conduit adapted for receiving the pre-heated particulate mineral material from the bottom outlet of the separating cyclone, in which the material receiving conduit has a first pressure. An outlet conduit supplying the particulate mineral material to the inlet of the cyclone furnace having a second pressure, wherein the second pressure is higher than the first pressure, and the particulate mineral material is fluidised and flows from the material receiving conduit to the outlet conduit. A gas-lock valve is provided between the material receiving conduit and the outlet conduit.
-
公开(公告)号:US10473513B2
公开(公告)日:2019-11-12
申请号:US15563152
申请日:2016-03-31
摘要: The present invention concerns a method and an apparatus for gravimetric metering of a powdery bulk material, said system comprising a storage container accommodating the bulk material, a feeding pipe for feeding bulk material from the storage container to a dosing container, a dosing discharge device for continuously discharging bulk material from the dosing container to a discharge pipe and on to a discharge line, wherein said dosing container is mounted on at least one weighing cell, and wherein the feeding pipe is provided with a first flexible tube member and the discharge pipe is provided with a second flexible tube member, and wherein the first flexible tube member comprises a first compensator and a second compensator with a tubular member there between.
-
10.
公开(公告)号:US20180354836A1
公开(公告)日:2018-12-13
申请号:US15780717
申请日:2016-12-01
CPC分类号: C03B3/005 , C03B3/023 , C03B5/12 , F27B3/18 , F27D3/0033
摘要: A method and an apparatus for making a mineral melt having a cyclone furnace and a separating cyclone, said apparatus further having a device for supplying pre-heated particulate mineral material from a bottom of the separating cyclone to an inlet of the cyclone furnace. A material receiving conduit adapted for receiving the pre-heated particulate mineral material from the bottom outlet of the separating cyclone, in which the material receiving conduit has a first pressure. An outlet conduit supplying the particulate mineral material to the inlet of the cyclone furnace having a second pressure, wherein said second pressure is higher than said first pressure, and the particulate mineral material is fluidised and flows from the material receiving conduit to the outlet conduit. A gas-lock valve is provided between said material receiving conduit and said outlet conduit.
-
-
-
-
-
-
-
-
-