公开(公告)号:US10118369B2
公开(公告)日:2018-11-06
申请号:US14434602
申请日:2013-10-10
摘要: A laminated glazing unit including a first and a second glass sheet, the first glass sheet being equipped with a first through-hole, a spacer film of thermoplastic polymer disposed between the first and second glass sheets, at least one conducting wire buried within the spacer film or disposed between the spacer film and the first glass sheet or disposed between the spacer film and the second glass sheet, one end of each conducting wire exiting from the laminated glazing unit via the first through-hole in the first glass sheet. The conducting wires are fed through a laminated glazing unit, with a guaranteed quality of positioning of the conducting wires, an improved field of view and with no induced noise.
-
公开(公告)号:US20150236491A1
公开(公告)日:2015-08-20
申请号:US14434602
申请日:2013-10-10
CPC分类号: B32B17/10376 , B32B3/266 , B32B17/10036 , B32B17/10293 , B32B17/10761 , B32B37/1018 , B32B37/1207 , B32B37/16 , B32B2307/202 , B32B2307/412 , B32B2398/20 , B32B2605/006 , B60J1/00
摘要: A laminated glazing unit including a first and a second glass sheet, the first glass sheet being equipped with a first through-hole, a spacer film of thermoplastic polymer disposed between the first and second glass sheets, at least one conducting wire buried within the spacer film or disposed between the spacer film and the first glass sheet or disposed between the spacer film and the second glass sheet, one end of each conducting wire exiting from the laminated glazing unit via the first through-hole in the first glass sheet. The conducting wires are fed through a laminated glazing unit, with a guaranteed quality of positioning of the conducting wires, an improved field of view and with no induced noise.
摘要翻译: 一种包括第一和第二玻璃板的层压玻璃单元,所述第一玻璃板配备有第一通孔,设置在所述第一和第二玻璃板之间的热塑性聚合物的间隔膜,至少一个埋入所述间隔件内的导线 薄膜或者设置在间隔膜和第一玻璃板之间或者设置在间隔膜和第二玻璃板之间,每个导线的一端经由第一玻璃板中的第一通孔从层压玻璃单元中退出。 导线通过层压玻璃单元进给,具有保证导线定位的质量,改进的视场和无感应噪声。
-
公开(公告)号:US11376820B2
公开(公告)日:2022-07-05
申请号:US16156537
申请日:2018-10-10
摘要: A method of fabrication of a laminated glazing unit, includes cutting out a first through-hole in a first glass sheet; positioning a conducting wire and a film of thermoplastic polymer between the first glass sheet and a second glass sheet so that a first extremity and a second extremity of the conducting wire extend outside the laminated glazing unit to be formed, and feeding out the first extremity of the conducting wire via the first through-hole so that the first extremity exits the laminated glazing unit to be formed via the first through-hole, the conducting wire extending continuously from the first extremity to the second extremity, and after the positioning and feeding out, assembling the conducting wire, the film of thermoplastic polymer, the first glass sheet and the second glass sheet all together to form the laminated glazing.
-
-