-
1.
公开(公告)号:US20240344451A1
公开(公告)日:2024-10-17
申请号:US18630011
申请日:2024-04-09
Applicant: Schlumberger Technology Corporation
Inventor: William Bailey , Peter Tilke
IPC: E21B47/117
CPC classification number: E21B47/117 , E21B2200/20
Abstract: Systems and methods are described herein for approximating spatial and temporal saturation and pressure of a carbon dioxide injection into an aquifer. In an example, the well is divided into segments for modeling purposes. A user provides initial input parameters for the bottom of a first segment, including an initial temperature and pressure. The initial parameters are used as input in an algorithm corresponding to the leak type. The algorithm outputs new property parameters corresponding to the top of the first segment. The new parameters are used as inputs in the algorithm in the next highest segment. This continues until all segments have been calculated. The outputs are aggregated and presented in a graphical template that includes edges representative of the output properties that connect nodes representing the well and surrounding wells and features.
-
公开(公告)号:US11795793B2
公开(公告)日:2023-10-24
申请号:US16310444
申请日:2016-06-24
Applicant: SCHLUMBERGER TECHNOLOGY CORPORATION
Inventor: William Bailey , Dzevat Omeragic
IPC: E21B43/12 , G06F17/40 , G05B17/02 , G06F17/18 , E21B47/003
CPC classification number: E21B43/12 , E21B47/003 , G05B17/02 , G06F17/18 , G06F17/40
Abstract: Systems, computer-readable media, and methods for valuating measurement data, of which the method includes obtaining a first model of a subsurface volume, determining a baseline control parameter based on the first model, receiving new measurement data measured using a data collection device, the new measurement data representing one or more characteristics of the subsurface volume, and obtaining a second model of the subsurface volume based in part on the new measurement data. The first model is not based on the new measurement data. Further, the method includes determining an enhanced control parameter based on the second model, determining an enhanced value corresponding to the second model using the enhanced control parameter, determining a realized value corresponding to the second model using the baseline control parameter, and calculating a value of the new measurement data by comparing the enhanced value and the realized value.
-
公开(公告)号:US20240411951A1
公开(公告)日:2024-12-12
申请号:US18333313
申请日:2023-06-12
Applicant: Schlumberger Technology Corporation
Inventor: Kashif Rashid , William Bailey , Bertrand Theuveny
IPC: G06F30/20
Abstract: Embodiments presented provide for a clean-up apparatus and method for wellbore environments. In embodiments, a design for wellbore clean-up is chosen and then the design is modeled to perform operations on the wellbore and produce results related to an efficiency of clean-up and time to achieve this clean-up. The design may be optimized during the analysis.
-
公开(公告)号:US20190330963A1
公开(公告)日:2019-10-31
申请号:US16310444
申请日:2016-06-24
Applicant: SCHLUMBERGER TECHNOLOGY CORPORATION
Inventor: William Bailey , Dzevat Omeragic
Abstract: Systems, computer-readable media, and methods for valuating measurement data, of which the method includes obtaining a first model of a subsurface volume, determining a baseline control parameter based on the first model, receiving new measurement data measured using a data collection device, the new measurement data representing one or more characteristics of the subsurface volume, and obtaining a second model of the subsurface volume based in part on the new measurement data. The first model is not based on the new measurement data. Further, the method includes determining an enhanced control parameter based on the second model, determining an enhanced value corresponding to the second model using the enhanced control parameter, determining a realized value corresponding to the second model using the baseline control parameter, and calculating a value of the new measurement data by comparing the enhanced value and the realized value.
-
公开(公告)号:US10013512B2
公开(公告)日:2018-07-03
申请号:US14473633
申请日:2014-08-29
Applicant: SCHLUMBERGER TECHNOLOGY CORPORATION
Inventor: William Bailey , Mack Shippen
CPC classification number: G06F17/5009 , E21B49/087 , G06F17/10 , G06Q10/06 , G06Q50/02
Abstract: A method can include receiving information that includes data that correspond to a range of a fluid production network variable; based at least in part on a portion of the data, determining optimal parameter values of a multi-parameter proxy model for at least a portion of the range of the fluid production network variable; based at least in part on a portion of the optimal parameter values, deriving functions for the parameters of the multi-parameter proxy model; and based at least in part on the functions, determining a value of the fluid production network variable for a fluid production network.
-
公开(公告)号:US20160063146A1
公开(公告)日:2016-03-03
申请号:US14473633
申请日:2014-08-29
Applicant: SCHLUMBERGER TECHNOLOGY CORPORATION
Inventor: William Bailey , Mack Shippen
CPC classification number: G06F17/5009 , E21B49/087 , G06F17/10 , G06Q10/06 , G06Q50/02
Abstract: A method can include receiving information that includes data that correspond to a range of a fluid production network variable; based at least in part on a portion of the data, determining optimal parameter values of a multi-parameter proxy model for at least a portion of the range of the fluid production network variable; based at least in part on a portion of the optimal parameter values, deriving functions for the parameters of the multi-parameter proxy model; and based at least in part on the functions, determining a value of the fluid production network variable for a fluid production network.
Abstract translation: 一种方法可以包括接收包括对应于流体生产网络变量的范围的数据的信息; 至少部分地基于所述数据的一部分,为所述流体生产网络变量的所述范围的至少一部分确定多参数代理模型的最佳参数值; 至少部分地基于最佳参数值的一部分,导出多参数代理模型的参数的函数; 并且至少部分地基于功能来确定用于流体生产网络的流体生产网络变量的值。
-
7.
公开(公告)号:US20240410239A1
公开(公告)日:2024-12-12
申请号:US18333342
申请日:2023-06-12
Applicant: Schlumberger Technology Corporation
Inventor: Kashif Rashid , William Bailey , Glen Andrew Hay , Bertrand Theuveny , Morten Kristensen
IPC: E21B21/08
Abstract: Embodiments presented provide for a method for calculation of an optimal scheme for wellbore cleanup. In embodiments, an emissions measure is used to minimize environmental impact from wellbore cleanup activities while establishing the most efficient steps and techniques to be performed during the cleanup activities.
-
-
-
-
-
-