摘要:
The invention relates to a method for operating a wind energy installation (10), in which the wind energy installation (10) has a rotor (12, 13, 22), at least one rotor blade (14) with an adjustable angle, a mechanical brake device (19) for braking the rotor (14), an operational control device (15, 15′) and a safety system (16, 20). The invention also relates to a corresponding wind energy installation (10). The method according to the invention is defined by the following method steps: braking of the rotor (12, 13, 22) by means of an angular adjustment (28) with an average angular adjustment rate of less than 8.5°/s of the at least one rotor blade (14) after a fault signal (30) occurs, braking of the rotor (12, 13, 22) by means of the mechanical brake device (19) as soon as the rotational speed of the rotor (12, 13, 22) exceeds a predefinable first rotational speed limit, and triggering of the safety system (16, 20) as soon as the rotational speed of the rotor (12, 13, 22) exceeds a predefinable second rotational speed limit.
摘要翻译:本发明涉及一种用于操作风能设备(10)的方法,其中风力设备(10)具有转子(12,13,22),至少一个具有可调角度的转子叶片(14) 用于制动转子(14)的机械制动装置(19),操作控制装置(15,15')和安全系统(16,20)。 本发明还涉及相应的风能装置(10)。 根据本发明的方法通过以下方法步骤来限定:通过角度调节(28)制动转子(12,13,22),平均角度调整率小于每秒的8.5°/ s 在发生故障信号(30)之后的至少一个转子叶片(14),一旦转子(12,13)的旋转速度一直通过机械制动装置(19)制动转子(12,13,22) ,22)超过预定义的第一转速限制,并且一旦所述转子(12,13,22)的转速超过预定义的第二转速限制,则触发所述安全系统(16,20)。
摘要:
The invention relates to a method for operating a wind energy installation (10), in which the wind energy installation (10) has a rotor (12, 13, 22), at least one rotor blade (14) with an adjustable angle, a mechanical brake device (19) for braking the rotor (14), an operational control device (15, 15′) and a safety system (16, 20). The invention also relates to a corresponding wind energy installation (10). The method according to the invention is defined by the following method steps: braking of the rotor (12, 13, 22) by means of an angular adjustment (28) with an average angular adjustment rate of less than 8.5°/s of the at least one rotor blade (14) after a fault signal (30) occurs, braking of the rotor (12, 13, 22) by means of the mechanical brake device (19) as soon as the rotational speed of the rotor (12, 13, 22) exceeds a predefinable first rotational speed limit, and triggering of the safety system (16, 20) as soon as the rotational speed of the rotor (12, 13, 22) exceeds a predefinable second rotational speed limit.
摘要翻译:本发明涉及一种用于操作风能设备(10)的方法,其中风力设备(10)具有转子(12,13,22),至少一个具有可调角度的转子叶片(14) 用于制动转子(14)的机械制动装置(19),操作控制装置(15,15')和安全系统(16,20)。 本发明还涉及相应的风能装置(10)。 根据本发明的方法通过以下方法步骤来限定:通过角度调节(28)制动转子(12,13,22),平均角度调整率小于每秒的8.5°/ s 在发生故障信号(30)之后的至少一个转子叶片(14),一旦转子(12,13)的旋转速度一直通过机械制动装置(19)制动转子(12,13,22) ,22)超过预定义的第一转速限制,并且一旦所述转子(12,13,22)的转速超过预定义的第二转速限制,则触发所述安全系统(16,20)。
摘要:
A method for operating a wind energy installation (10) with a rotor (12) and at least one rotor blade (14), which can be adjusted in terms of its angle of attack. The rotor blade (14) is accelerated by virtue of at least five repeated adjustment operations of the angle of attack about its longitudinal axis (15), wherein a rotor blade bending vibration with a vibration amplitude and a vibration frequency is excited.
摘要:
The device for adjusting a rotor blade of a wind energy turbine is provided with a driving device (12) for driving an adjusting e ement (24) for selectably rotating the rotor blade (26) in both directions about its longitudinal axis (28), an energy storage unit (30) and a free-running means (32) adapted to be selectively activated, said free-running means (32), in its activated state, allowing rotation of the rotor blade (26) by means of energy stored in the energy storage unit (30) only in one of the two directions up to a desired rotational position.
摘要:
A method for operating a wind power plant (WEA) before or during the performance of maintenance work on the wind power plant (WEA). At least one physical condition of the surroundings outside the wind power plant (WEA) induced by wind movement outside the wind power plant (WEA) is detected as an external physical condition. At least one physical condition of a component of the wind power plant (WEA) influenced by wind movement outside the wind power plant (WEA) is detected as an internal physical condition. The at least one external physical condition and/or at least one internal physical condition are evaluated. The at least one external physical condition is compared with a predetermined reference value for the external physical condition. The at least one internal physical condition is compared with a predetermined reference value for the internal physical condition. Depending on the comparison, at least one warning message is generated.
摘要:
The invention relates to a method for operating a wind power plant with a rotor and with at least two rotor blades rotatable about a common rotor axis in a rotor blade plane, whereof each can be swivelled about a swivel axis which is roughly parallel to its longitudinal axis approximately perpendicular to the rotor axis, in which the setting or pitch angels of the rotor blades are set with respect to the rotor blade plane as a function of the operating and in particular wind conditions, in which the pitch angels of at least two rotor blades in a parking position of the rotor, in which rotor rotation about the rotor axis is decelerated, are set to different values.
摘要:
The modular kit for a tower has a height ranging between a minimum height and a maximum height, in particular for a wind energy turbine, comprises a first conical tower segment (10) comprising a steel tube having a predetermined length (11), a second conical tower segment (12) comprising a steel tube having a predetermined length (12), and a first cylindrical tower segment (14) comprising a steel tube having a length between a predetermined minimum length and a predetermined maximum length. The length of the first cylindrical tower segment (14) can be adapted to the necessary height of the tower between its minimum height and its maximum height. The minimum height is the sum of the predetermined lengths (11,12) of the first and second conical tower segments (10,12) and the minimum length of the first cylindrical tower segment (14). The maximum height is the sum of the predetermined lengths (11,12) of the first and second conical tower segments (10,12) and the maximum length of the first cylindrical tower segment (14).
摘要:
The invention concerns a method for operating a wind power plant (WEA), preferably before or during the performance of maintenance work on the wind power plant (WEA), wherein —at least one physical condition of the surroundings outside the wind power plant (WEA) induced by wind movement outside the wind power plant (WEA) is detected as an external physical condition, and/or at least one physical condition of a component of the wind power plant (WEA) influenced by wind movement outside the wind power plant (WEA) is detected as an internal physical condition; —the at least one external physical condition and/or at least one internal physical condition are evaluated; —the at least one external physical condition is compared with a predetermined reference value for the external physical condition, and/or the at least one internal physical condition is compared with a predetermined reference value for the internal physical condition; —depending on the comparison at least one warning message is generated, in particular a maintenance warning message.
摘要:
A method for the operation of a wind power plant (10) with a rotor (12), which has at least one angle-adjustable rotor blade (14), wherein the wind power plant (10) is operated in a first operating mode (71) and/or a second operating mode (75). In the first operating mode (71) a braking process of the rotor (12) is initiated when a rotational speed of the rotor (12) is exceeded, which lies above a first rotational speed threshold value. Also, a method for the operation of a wind power plant (10) with a rotor (12), which has at least one angle-adjustable rotor blade (14), wherein an operating parameter is monitored and a braking process of the rotor (12) is initiated when an operating parameter threshold value is reached.
摘要:
A method for the operation of a wind power plant 10) with a rotor (12), which has at least one angle-adjustable rotor blade (14), wherein the wind power plant (10) is operated in a first operating mode (71) and/or a second operating mode (75). In the first operating mode (71) a braking process of the rotor (12) is initiated when a rotational speed of the rotor (12) is exceeded, which lies above a first rotational speed threshold value. Also, a method for the operation of a wind power plant (10) with a rotor (12), which has at least one angle-adjustable rotor blade (14), wherein an operating parameter is monitored and a braking process of the rotor (12) is initiated when an operating parameter threshold value is reached.