System and method for initiating a completed lading request

    公开(公告)号:US12229646B2

    公开(公告)日:2025-02-18

    申请号:US17749773

    申请日:2022-05-20

    Abstract: A system for initiating a completed lading request includes a computing device configured to obtain a lading request from a client device, wherein the lading request comprises a communication detail datum, determine an logical route, wherein determining the logical route further comprises receiving a conveyor indicator, identifying a spot signature as a function of the conveyor indicator, training a route machine-learning mode using a route training data correlating the spot signature to the lading request, and determining the logical route as a function of the spot signature and the lading request using the trained route machine-learning model, and initiate the completed lading request, wherein initiating the lading request further comprises receiving an acknowledgment element, and initiating the completed lading request as a function of the acknowledgment element, and initiating the completed lading request as a function of the acknowledgment element.

    SYSTEMS AND METHODS FOR REAL-TIME SUBSTITUTION

    公开(公告)号:US20250045813A1

    公开(公告)日:2025-02-06

    申请号:US18476164

    申请日:2023-09-27

    Abstract: Systems and methods for distributed order fulfillment are disclosed. Real-time fulfillment data indicating unavailability of a first item identified in an order is received from a first computing device. The real-time fulfillment data is generated in response to an input received by the first computing device. Order update data indicating unavailability of the first item and one or more substitute items is transmitted to a second computing device. The order update data causes the second computing device to generate an interface including the substitute items and a portion of the order update data. A substitute response from the second computing device. In response to receiving the substitute response, The selected substitute item is substituted in place of the first item during fulfillment when the substitute response indicates acceptance the substitute item and the first item is removed from the order when the substitute response indicates rejection of the substitute items.

    PRODUCT DESIGN AND MANUFACTURE MANAGEMENT SYSTEM AND METHOD

    公开(公告)号:US20250037077A1

    公开(公告)日:2025-01-30

    申请号:US18786544

    申请日:2024-07-28

    Abstract: Techniques of item assembly testing that include: obtaining assembly information; generating, based on the assembly information, a bill of materials (BOM) including a listing of parts corresponding to a configuration of parts defined by the assembly information; generating, based on the listing of parts, a set of reference designators; obtaining an item label set; generating, based on the item label set and the set of reference designators, an assembly bill of materials (ABOM) that includes the labels associated with the parts reference designators; generating, for a test of the item assembly, a record of the ABOM; obtaining test data for parts of the item assembly (the item assembly tested having a configuration specified the ABOM); and generating a test results ABOM including test data for the parts associated with the labels for the reference designators associated with the parts.

    Bill of material conversion method, electronic apparatus and non-transitory computer-readable storage medium

    公开(公告)号:US12198099B2

    公开(公告)日:2025-01-14

    申请号:US17036152

    申请日:2020-09-29

    Abstract: The present disclosure provides a bill of material conversion method, an electronic apparatus and a non-transitory computer-readable storage medium. A bill of material conversion method, including steps S1 to S4: Step S1: obtaining an unprocessed first node in a first bill of material; Step S2: according to a preset correspondence, creating a second node corresponding to a second bill of material according to the obtained first node, and storing the created second node into a list; Step S3: determining whether the first node currently obtained is a last first node of the first bill of material; in response to the first node currently obtained not the last first node of the first bill of material, repeatedly performing steps S1 through S3; in response to the first node currently obtained being the last first node, performing step S4: converting respective second nodes in the list into the second bill of material.

    PICKING GUIDANCE SYSTEM AND PICKING GUIDANCE METHOD

    公开(公告)号:US20250005471A1

    公开(公告)日:2025-01-02

    申请号:US18708621

    申请日:2021-12-17

    Abstract: A picking guidance system for guiding a worker in picking of a member includes an information acquisition section configured to acquire information of a member allocated to a production job in a production area and location information related to a location of the member, and a guidance output section configured to generate and output picking guidance for causing the worker to pick up the member allocated to the production job as a picking target from a storage area of the member. When the picking guidance is generated, in a case where the member that is the picking target includes a member whose location information indicates an area different from the storage area, the guidance output section shows information indicating that picking of the member has been completed and includes the member in the picking guidance.

    SYSTEM AND METHODS FOR PERFORMING ORDER CART AUDITS

    公开(公告)号:US20240428191A1

    公开(公告)日:2024-12-26

    申请号:US18702631

    申请日:2023-03-08

    Abstract: Techniques are described for automating and computerizing order cart audits to reduce the overall costs associated with shipping incorrect items, missing items, and/or additional items. In some cases, the system may be configured to perform an audit of a completed or filled order cart. The facility operator may pass the order cart through an audit area prior to loading the items on a vehicle for transport. During the audit, the system may capture sensor data associated with the order cart and identify each item present. The system may determine whether or not each item is part of the order and notify an operator accordingly.

    Methods for designing, manufacturing, installing, and/or maintenance of roofing accessories and systems of use thereof

    公开(公告)号:US12175165B2

    公开(公告)日:2024-12-24

    申请号:US18538742

    申请日:2023-12-13

    Applicant: BMIC LLC

    Abstract: Systems and methods of the present disclosure enable automated roof planning using a processor. The processor receives a digital image of a roof of a structure and models each roof plane of the roof to generate a roof model. The processor determines dimensions of each roof plane based on the roof model. The processor retrieves roofing accessory data from a database, the roofing accessory data solar roofing accessory part identifiers and solar roofing accessory part performance characteristics for solar roofing accessories. The processor simulates multiple candidate roof layouts based on the dimensions of each roof plan and the solar roofing accessory parts and determines a utilization prediction for each candidate layout. Based on each utilization prediction, the processor determines a particular roof layout having selected solar roofing accessory parts, and generates a solar roof design, including a list of materials, for the particular roof layout.

    INTERACTIVE INVENTORY STORAGE DEVICE, SYSTEM, AND METHOD

    公开(公告)号:US20240420081A1

    公开(公告)日:2024-12-19

    申请号:US18821931

    申请日:2024-08-30

    Abstract: Systems and methods for providing automated inventory management of medicine and healthcare items stored within bins in care facilities are disclosed. A method includes providing an interactive storage device for attaching to a bin, and outputting, via an audiovisual element, a visual representation of a local inventory of the bin, receiving a user input, determining a change to the local inventory according to the user input, updating the local inventory in a non-volatile data store according to the change, synchronizing the local inventory with one or more nodes via a communication interface, and receiving, from the one or more nodes via the communication interface, periodic updates for a local cache comprising locations and inventories of one or more remote bins.

    Part supply system and method for operating part supply system

    公开(公告)号:US12165087B2

    公开(公告)日:2024-12-10

    申请号:US17871564

    申请日:2022-07-22

    Abstract: An embodiment method for using a part supply system to load and supply parts required for processes in producing a mobility includes creating, by a processor, a part supply schedule in which the parts required for the processes in producing the mobility for each of a plurality of time zones are scheduled, creating, by the processor, a part loading schedule in which the parts to be loaded on each work bench to which the pails are supplied according to the part supply schedule for each time zone are scheduled, verifying, by the processor, whether the part loading schedule satisfies the part supply schedule through a digital twin, and confirming or modifying, by the processor, the part loading schedule based on the verification through the digital twin.

Patent Agency Ranking