Support mechanism and electronic device using the same
    122.
    发明授权
    Support mechanism and electronic device using the same 失效
    支持机构和电子设备使用相同

    公开(公告)号:US08514557B2

    公开(公告)日:2013-08-20

    申请号:US13156508

    申请日:2011-06-09

    IPC分类号: G06F1/16

    摘要: A support mechanism includes a support frame, a first hinge assembly, and a second hinge assembly. The support frame includes a first pivoting portion and a second pivoting portion aligned with the first pivoting portion. The first hinge assembly is mounted to the first pivoting portion, and the second hinge assembly is mounted to the second pivoting portion and aligns with the first hinge assembly. The support mechanism is durable. The present disclosure further provides an electronic device using the support mechanism. As the first pivot portion and the first hinge assembly is arranged in a line coaxial with the second pivoting portion and the second hinge assembly, an amount of force applied for supporting the main body of the electronic device is dispersed in a line, rather than being focused on one point, such that, an adjustable viewing angle to the main body is also provided.

    摘要翻译: 支撑机构包括支撑框架,第一铰链组件和第二铰链组件。 支撑框架包括第一枢转部分和与第一枢转部分对准的第二枢转部分。 第一铰链组件安装到第一枢转部分,并且第二铰链组件安装到第二枢转部分并与第一铰链组件对准。 支撑机构耐用。 本公开还提供了一种使用该支撑机构的电子设备。 当第一枢转部分和第一铰链组件布置成与第二枢转部分和第二铰链组件同轴的直线时,用于支撑电子设备的主体的力的量被分散在一条直线上,而不是 专注于一点,使得还提供与主体的可调节的视角。

    FLUSHING MECHANISM
    123.
    发明申请
    FLUSHING MECHANISM 有权
    冲洗机制

    公开(公告)号:US20130205486A1

    公开(公告)日:2013-08-15

    申请号:US13814835

    申请日:2011-08-10

    IPC分类号: E03D1/34

    摘要: A flushing mechanism includes a housing with an outfall made at the housing bottom surrounding an axis; a guide rod with axial restraint relative to the housing along the axis; a first piston that hermetically slips on the cylindrical inner surface and guide rod at the same time along the axis direction; a spring loading the first piston installed in the upper cavity surrounding the guide rod; the second piston that hermetically slips on the guide rod along the axis direction and locates between the first piston and the housing bottom; a spring loading the second piston installed surrounding the guide rod; control valve; lower part of the first piston is provided with ring protuberance. The large seal ring of seal assembly of the second piston is sealed over the small seal ring of seal assembly of the second piston.

    摘要翻译: 冲洗机构包括具有围绕轴线的壳体底部处形成的排水口的壳体; 相对于壳体沿轴线具有轴向约束的导杆; 第一活塞,沿着轴向同时气密地滑动在圆筒形内表面和导杆上; 弹簧装载安装在围绕引导杆的上腔中的第一活塞; 所述第二活塞沿着所述轴线方向气密地滑动在所述导杆上并且位于所述第一活塞和所述壳体底部之间; 弹簧装载围绕导杆安装的第二活塞; 控制阀; 第一活塞的下部设置有环形突起。 第二活塞的密封组件的大密封环密封在第二活塞的密封组件的小密封环上。

    Method, system, and apparatus for network device to access packet switched network
    126.
    发明授权
    Method, system, and apparatus for network device to access packet switched network 有权
    用于网络设备接入分组交换网络的方法,系统和装置

    公开(公告)号:US08437248B2

    公开(公告)日:2013-05-07

    申请号:US13208175

    申请日:2011-08-11

    摘要: A method for a network device to access a packet switched network is applied to a system in which the network device accesses the packet switched network by connecting to PEs in an active-standby mode. The method includes: an active PE and a standby PE each sends a fault detection message to the network device through an interface connected to the network device; the active PE sets the state of the interface to “up” and advertises a route to a remote PE if a fault detection response returned by the network device is received through the interface within a preset period; otherwise, the active PE sets the state of the interface to “down” , and withdraws the advertised route; and the standby PE sets the state of the interface to “up” and advertises another route to the remote PE after receiving a fault detection response through the interface connected to the network device.

    摘要翻译: 网络设备访问分组交换网络的方法被应用于网络设备通过以主动待机模式连接到PE来访问分组交换网络的系统。 该方法包括:主动PE和备用PE通过连接到网络设备的接口向网络设备发送故障检测消息; 主动PE将接口的状态设置为“up”,如果通过接口在预设时间段内接收到网络设备返回的故障检测响应,则将路由通告给远程PE; 否则,主动PE将接口的状态设置为“down”,撤销通告的路由; 并且备用PE将接口的状态设置为“up”,并通过连接到网络设备的接口收到故障检测响应后,向远程PE发布另一条路由。

    INDOOR UNIT OF AIR CONDITIONER
    127.
    发明申请
    INDOOR UNIT OF AIR CONDITIONER 审中-公开
    空调室内单位

    公开(公告)号:US20130102238A1

    公开(公告)日:2013-04-25

    申请号:US13807209

    申请日:2011-04-01

    IPC分类号: F24F7/00

    摘要: An indoor unit of an air conditioner comprises a panel body (2) encasing side portions and a top portion of the air conditioner, a back housing (1) encasing a rear portion of the air conditioner, and a front panel (3) located in front of the panel body and closely connected to the panel body (2). The back housing (1), the panel body (2) and the front panel (3) define an inner cavity of the air conditioner, in which a heat exchanger, a control element and a ventilation component are arranged. An air outlet (4) is provided at a lower portion of the front panel (3), and an air deflector (5) is provided on the front panel (3) or on the panel body (2) and is configured to open and close the air outlet (4). An air baffle rib (8) is provided at a top portion of the air outlet (4) and extends towards the air outlet (4).

    摘要翻译: 一种空调机的室内机,其特征在于,具备包围所述空调装置的侧部的面板主体(2)和所述空调装置的后部的后壳体(1)和位于所述空调机的后部的前面板(3) 面板主体的前部并紧密连接到面板主体(2)。 后壳体(1),面板体(2)和前面板(3)限定空调器的内腔,其中设置有热交换器,控制元件和通风部件。 空气出口(4)设置在前面板(3)的下部,并且在前面板(3)或面板主体(2)上设置有空气导流板(5) 关闭出风口(4)。 空气挡板肋(8)设置在空气出口(4)的顶部并朝向空气出口(4)延伸。

    Memory cell constructions
    128.
    发明授权
    Memory cell constructions 有权
    记忆体结构

    公开(公告)号:US08395137B2

    公开(公告)日:2013-03-12

    申请号:US13043071

    申请日:2011-03-08

    申请人: Jun Liu Jian Li

    发明人: Jun Liu Jian Li

    IPC分类号: H01L29/02 H01L21/02

    摘要: Some embodiments include methods for fabricating memory cell constructions. A memory cell may be formed to have a programmable material directly against a material having a different coefficient of expansion than the programmable material. A retaining shell may be formed adjacent the programmable material. The memory cell may be thermally processed to increase a temperature of the memory cell to at least about 300° C., causing thermally-induced stress within the memory cell. The retaining shell may provide a stress which substantially balances the thermally-induced stress. Some embodiments include memory cell constructions. The constructions may include programmable material directly against silicon nitride that has an internal stress of less than or equal to about 200 megapascals. The constructions may also include a retaining shell silicon nitride that has an internal stress of at least about 500 megapascals.

    摘要翻译: 一些实施例包括用于制造存储器单元结构的方法。 存储单元可以形成为具有可编程材料,以直接抵抗具有与可编程材料不同的膨胀系数的材料。 可以在可编程材料附近形成保持壳。 可以对存储单元进行热处理以将存储单元的温度升高至至少约300℃,从而在存储单元内引起热诱导的应力。 保持壳可以提供基本上平衡热诱导应力的应力。 一些实施例包括存储器单元结构。 这些结构可以包括直接针对氮化硅的可编程材料,其具有小于或等于约200兆帕的内部应力。 该结构还可以包括具有至少约500兆帕的内应力的保持壳氮化硅。

    Device and Process for Continuously Cleaning Surface of Molybdenum Wire at High Temperature
    129.
    发明申请
    Device and Process for Continuously Cleaning Surface of Molybdenum Wire at High Temperature 有权
    在高温下连续清洗钼丝表面的装置和工艺

    公开(公告)号:US20120291807A1

    公开(公告)日:2012-11-22

    申请号:US13521347

    申请日:2011-08-10

    IPC分类号: B08B7/04 B08B5/00

    CPC分类号: C23G5/00 C22C27/04 C22F1/18

    摘要: A device for cleaning the surface of a molybdenum wire at high temperature, comprises a wire pay-off mechanism, a first wire guiding wheel, a cleaning mechanism, a second wire guiding wheel, and a wire take-up mechanism; wherein the two ends of a furnace body of the cleaning mechanism are provided with an inlet hole and an outlet hole for the molybdenum wire. Electrodes connected to a power supply are provided at the inlet hole and in a central part inside the furnace body. An upper part of the furnace body is provided with a gas outlet and a lower part thereof is provided with a wet hydrogen inlet; a heating section is formed between the electrode located at the inlet hole and the electrode located in the central part, and a cooling section is formed between the electrode located in the central part and the outlet hole.

    摘要翻译: 一种用于在高温下清洁钼丝表面的装置,包括线放线机构,第一线引导轮,清洁机构,第二线引导轮和引线机构; 其中清洁机构的炉体的两端设有用于钼丝的入口孔和出口孔。 连接到电源的电极设置在炉体的入口孔和中心部分。 炉体的上部设有气体出口,其下部设有湿氢入口; 在位于入口孔的电极和位于中心部分的电极之间形成加热部分,并且在位于中心部分的电极和出口孔之间形成冷却部分。

    SCHEDULING SYSTEM AND METHOD FOR A TRANSPORTATION NETWORK
    130.
    发明申请
    SCHEDULING SYSTEM AND METHOD FOR A TRANSPORTATION NETWORK 有权
    运输网络的调度系统和方法

    公开(公告)号:US20120290185A1

    公开(公告)日:2012-11-15

    申请号:US13307582

    申请日:2011-11-30

    IPC分类号: G06F17/00

    CPC分类号: B61L27/0027 B61L15/0027

    摘要: A system is provided that includes a control unit configured to be disposed on-board at least one of a first vehicle or a second vehicle. The control unit also is configured to receive an updated time of an event involving the first vehicle and the second vehicle traveling in a transportation network. The control unit also is configured to change a speed of said at least one of the first vehicle or the second vehicle in response to the updated time to arrive at the event. A method is provided that includes, at one of a first vehicle or a second vehicle, receiving an updated time of an event involving the first vehicle and the second vehicle in a transportation network. The method also includes changing a speed of said one of the first vehicle or the second vehicle in response to the updated tune to arrive at the event.

    摘要翻译: 提供了一种系统,其包括被配置为布置在第一车辆或第二车辆中的至少一个车辆上的控制单元。 控制单元还被配置为接收涉及在运输网络中行驶的第一车辆和第二车辆的事件的更新时间。 控制单元还被配置为响应于更新的时间来改变所述第一车辆或第二车辆中的至少一个的速度以达到事件。 提供了一种方法,其包括在第一车辆或第二车辆中的一个处,在运输网络中接收涉及第一车辆和第二车辆的事件的更新时间。 该方法还包括响应于更新的曲调来改变第一车辆或第二车辆中的所述一个的速度以得到该事件。