ZERO-GANGUE-DISCHARGE SHORT-WALL FACE PILLAR-FREE MINING METHOD

    公开(公告)号:US20210310356A1

    公开(公告)日:2021-10-07

    申请号:US16319033

    申请日:2018-05-23

    Abstract: The present invention discloses a zero-gangue-discharge short-wall face pillar-free mining method, which is applicable to zero-gangue-discharge disposal in the mining operation in a mine shaft. A short-wall face is arranged in a selected area near a mine shaft according to the actual conditions of the mine shaft, the short-wall face is mined in a fully mining and fully back-filling mode, the gangues produced at other mining faces of the mine shaft are filled into the short-wall face, the short-wall face is supported with anchor rods along the edge of the filling face and the solid coal side to form an entry, and the entry is utilized to mine an adjacent working face. The method in the present invention mainly displaces the coal mass with gangues and thereby maximizes the utilization of the resources; in addition, the method can fully control the roof and realize mining without damage to the rock formation. Therefore, the method is of great value for wide application.

    INTERFERENCE PROTECTION DEVICE AND METHOD FOR HYDRAULIC SUPPORT AND CUTTING PART OF SHEARER

    公开(公告)号:US20210262345A1

    公开(公告)日:2021-08-26

    申请号:US16762946

    申请日:2019-06-18

    Abstract: Disclosed is an interference protection device and method for a hydraulic support and a cutting part of a shearer. The device includes: a plurality of dust-proof cases evenly and fixedly provided on a surface of one side of a hauling part of the shearer that faces away from a coal wall, and a dust-proof housing fixed on the hydraulic support. A first ultrasonic transducer and a flash lamp are fixedly provided in each dust-proof case, and a second ultrasonic transducer, a receiver, and a data processing module are fixedly provided in the dust-proof housing. The data processing module is electrically connected to the second ultrasonic transducer and the receiver separately, the first ultrasonic transducers and the flash lamps are all electrically connected to an external single-chip microcomputer, and the data processing module is electrically connected to a hydraulic support control computer. The present invention obtains a distance from the shearer to the hydraulic support by calculation from a difference between time points at which the second ultrasonic transducer and the receiver on the hydraulic support respectively receive an ultrasonic signal and an optical signal, and thus timely controls a guard plate to retract, thereby achieving the advantages of low cost, high applicability and high reliability.

    Coal mine advanced detection method for heading machine

    公开(公告)号:US11099146B1

    公开(公告)日:2021-08-24

    申请号:US17264412

    申请日:2020-03-13

    Abstract: When the heading machine tunnels, a current generated by a current excitation source enters a coal seam through a movable cutting pick to form a stray current. The stray current collected by a backflow net returns to a negative electrode of a power supply through a transition resistor. When information such as the water content of the coal seam changes, the stray current and a potential difference across the transition resistor also accordingly change, and the coal seam water content information is converted into an electric signal. When the potential difference across the transition resistor is applied to two ends of a piezoelectric ceramic, the piezoelectric ceramic extends or compresses, and the electric signal is converted into a strain signal. A sensing optical fiber converts the strain signal into an optical signal detectable by a photoelectric detector. The optical signal is analyzed to obtain the coal seam water content information.

    Method for controlling subsidence area caused by underground mining in adjoining open-pit mine

    公开(公告)号:US11085296B2

    公开(公告)日:2021-08-10

    申请号:US16605122

    申请日:2017-06-06

    Abstract: A method for controlling a subsidence area caused by underground mining in an adjoining open-pit mine, applied in an open-pit and underground coordinated mining process. In the method, a ground subsidence area caused by underground mining and production is directly filled and covered with overburden materials such as soil and rock discharged from an adjoining open-pit mine; small and medium fracture zones and large fracture zones caused by mining are timely backfilled, tamped, and levelled according to areas before the ground subsidence area appears, the thickness of the levelled soil layer is kept above 1 m, and the area slope is controlled within 7°. By fully using overburden materials from an adjoining open-pit mine, the method controls a subsidence area caused by underground mining and greatly shortens the discharge distance of the overburden materials from the adjoining open-pit mine, also solves the safety problems such as air leakage and spontaneous combustion of coal caused by fractures in mine subsidence, and brings significant economic and social benefits.

    HARD ROCK ROADWAY AND TUNNEL BORING MACHINE WITH ACTIVELY ROTATING HOBS

    公开(公告)号:US20210231013A1

    公开(公告)日:2021-07-29

    申请号:US16764405

    申请日:2019-09-12

    Abstract: The present invention discloses a hard rock roadway and tunnel boring machine with actively rotating hobs, including a rack provided with a crawler track unit. The rack is provided with a hydraulic power unit and a high-pressure abrasive jet generation system connected therewith. A transmission box is fixedly arranged at one of ends of the rack. The transmission box is provided with two input shafts and one output shaft. The input shafts are connected with planetary reduction mechanisms. Input ends of the planetary reduction mechanisms are connected with cantilever disc driving motors. A cantilever disc is fixed to the output shaft. Four cantilevers are hinged to the cantilever disc. Cantilever driving motors are further arranged on the cantilever disc. Actively rotating hob devices are arranged at ends of the cantilevers away from the cantilever disc. The transmission box is further provided with rotary sealing devices.

    CLEAN AND EFFICIENT COAL MINING METHOD

    公开(公告)号:US20210189876A1

    公开(公告)日:2021-06-24

    申请号:US16080250

    申请日:2018-03-13

    Abstract: The present invention relates to a clean and efficient coal mining method, which is applicable to the field of solid waste treatment in mines. The method is characterized in: the width of short-segment working faces is designed according to the discharge volume of solid wastes produced in a mine, including downhole gangue and surface coal ash; first, two adjacent short-segment working faces are mined and backfilled, and the edges of the filling face and the solid coal side are supported with anchor rods while roadways are retained; the roadways retained at the two short-segment working faces and the coal mass in the middle constitute a long-segment working face mining system; the long-segment working face is mined, the short-segment backfilled working faces at the two sides are mined and backfilled at the same time, and the gangue produced at the long-segment working face is transported to the short-segment working faces to fill, so that a continuous mining system that consists of backfill mining at short-segment working faces and efficient stopping at long-segment working faces is realized. The method provided in the present invention can deal with all surface and downhole solid wastes in a mine, reduces the cost of gangue treatment, and mitigates damages to the ecological environment; besides, the method utilizes solid wastes to fill the gobs to form roadways, eliminates coal pillars and improve resource recovery rate.

    UNDERGROUND COAL SEPARATION PROCESS
    170.
    发明申请

    公开(公告)号:US20210162427A1

    公开(公告)日:2021-06-03

    申请号:US17059476

    申请日:2019-04-22

    Abstract: Disclosed is an underground coal preparation process adopting a water medium, comprising: feeding exploited raw coal into a Φ25 mm raw coal classifying screen for screening; performing dry coal preparation on a classifying screen oversize product with a particle size greater than 25 mm and feeding a classifying screen undersize product with a particle size less than 25 mm into a special underground compact jigging machine for sorting to obtain jigging machine overflow clean coal, jigging middling coal and jigging gangue; screening and dewatering the jigging machine overflow clean coal to obtain a clean coal product, and screening and dewatering the jigging middling coal to obtain a middling coal product, sorting slime water to be sorted and generated during sorting to obtain coarse clean coal slime and coarse middling coal slime, and performing circulating water treatment on a final liquid.