Steam drum level control system, computer program product and related methods

    公开(公告)号:US10323547B2

    公开(公告)日:2019-06-18

    申请号:US15051046

    申请日:2016-02-23

    Abstract: Various embodiments include a system having: at least one computing device configured to perform actions including: measuring at least one of the following parameters: a steam pressure within a steam drum, a load on a GT, a position of a bypass valve bypassing an HRSG, and a steam flow rate through the steam drum; defining a threshold range for each of: a steam pressure within the steam drum, a load on the GT, a position of the bypass valve bypassing the HRSG and a steam flow rate through the steam drum based upon the measured data and a target steam level; and adjusting the steam flow rate through the steam drum in response to at least one of the measured parameters deviating from the corresponding threshold range.

    Evaluating Performance of a Fluid Transport System Using Limited Sensor Data

    公开(公告)号:US20170299531A1

    公开(公告)日:2017-10-19

    申请号:US15132734

    申请日:2016-04-19

    CPC classification number: G01K17/10 G01K13/02

    Abstract: Embodiments of the disclosure relate to systems and methods to evaluate performance of a fluid transport system. Towards this end, a performance report of the fluid transport system can be generated by estimating various performance parameters at an outlet of a heat exchanger in lieu of using sensor data obtained directly from the outlet of the heat exchanger. Specifically, in one exemplary implementation, sensor data is obtained from an inlet of the heat exchanger and an outlet of a downstream element that is coupled to the heat exchanger, for estimating the various performance parameters at the outlet of the heat exchanger. The estimated performance parameters can then be combined with empirical data and predictive data for generating the performance report of the fluid transport system.

    COMBINED CYCLE POWER PLANT SYSTEM AND RELATED CONTROL SYSTEMS AND PROGRAM PRODUCTS
    15.
    发明申请
    COMBINED CYCLE POWER PLANT SYSTEM AND RELATED CONTROL SYSTEMS AND PROGRAM PRODUCTS 有权
    组合循环发电厂系统及相关控制系统和程序产品

    公开(公告)号:US20150330263A1

    公开(公告)日:2015-11-19

    申请号:US14281335

    申请日:2014-05-19

    Abstract: Various embodiments include a system having: at least one computing device configured to monitor a combined-cycle (CC) power plant during a transient event by performing actions including: determining whether a change in an operating condition of a component of the CC power plant is unintentional, the determining including comparing control system instructions for the component of the CC power plant with a reference look-up table, the reference look-up table including correlation data for the control system instructions for the component and historical data about the operating condition of the component; and providing instructions to a control system of the CC power plant to modify the operating condition in the CC power plant in response to determining that the change in operating condition of the component is unintentional.

    Abstract translation: 各种实施例包括具有:至少一个计算设备,被配置为通过执行动作在瞬态事件期间监视组合循环(CC)发电厂,包括:确定CC发电厂的部件的运行状态是否为 无意识地,确定包括将CC发电厂的部件的控制系统指令与参考查找表进行比较,所述参考查找表包括用于组件的控制系统指令的相关数据和关于运行条件的历史数据 组件; 以及向所述CC发电厂的控制系统提供指令以响应于确定所述部件的操作状况的变化是无意的而修改所述CC发电厂中的工作状态。

    SYSTEMS AND METHODS FOR PROVIDING AN INTEGRATED POWER PLANT ADVISOR

    公开(公告)号:US20170371305A1

    公开(公告)日:2017-12-28

    申请号:US15194866

    申请日:2016-06-28

    Abstract: Embodiments of the disclosure can relate to providing an integrated power plant advisor. In one embodiment, a method for providing an integrated power plant advisor can include receiving a signal associated with a failure of a power plant or a power plant component. The method can further include determining one or more root causes associated with the failure of the power plant or the power plant component. Based at least in part on operational data and training data from one or more power plants, a ranking of the one or more root causes associated with the failure of the power plant or the power plant component can be determined. The method can further include outputting the ranking via a client device. Based at least in part on the ranking, a repair or replacement strategy for the power plant or the power plant component can be identified.