TOWER ERECTING SYSTEMS AND METHODS
    13.
    发明申请

    公开(公告)号:US20180112431A1

    公开(公告)日:2018-04-26

    申请号:US15850714

    申请日:2017-12-21

    Abstract: Tower erecting systems and methods are disclosed. An example method for erecting a tower includes: nesting frusto-conical tower sections within one another and within a frusto-conical tower base; securing the frusto-conical tower base to a tower foundation; lifting each frusto-conical tower section from within the frusto-conical tower base with a lifting apparatus; and securing each frusto-conical tower section to the frusto-conical tower base or to a previously lifted frusto-conical tower section.

    TOWER ERECTING SYSTEM
    15.
    发明申请
    TOWER ERECTING SYSTEM 有权
    塔式检测系统

    公开(公告)号:US20130186013A1

    公开(公告)日:2013-07-25

    申请号:US13720535

    申请日:2012-12-19

    Abstract: In certain embodiments, a tower lifting system comprises a primary lifting system and a secondary lifting system. The primary lifting system includes a lift cap configured to support a tower section to be lifted, the lift cap having a first plurality of hoists, and a lift pole coupled to the lift cap, the lift pole having a lifting mechanism configured to lift the lift cap, the lift pole, and the tower section to be lifted from within a previously lifted tower section. The secondary lifting system comprises a second plurality of hoists configured to raise the tower section to be lifted to the lift cap from a tower foundation.

    Abstract translation: 在某些实施例中,塔架提升系统包括主提升系统和次升降系统。 主提升系统包括提升盖,其构造成支撑要被提升的塔架部分,提升盖具有第一多个起重机,以及联接到提升盖的提升杆,提升杆具有升降机构,其构造成提升升降机 盖子,电梯杆和塔架部分从先前提升的塔部分提升。 第二提升系统包括第二多个提升机,其构造成将塔架部分从塔架基座升高到提升盖。

    Large Scale Metal Forming
    17.
    发明申请

    公开(公告)号:US20190208585A1

    公开(公告)日:2019-07-04

    申请号:US16299831

    申请日:2019-03-12

    Abstract: In certain embodiments described herein, a heated line forming system includes a heating coil system configured to produce a heated line on a surface of a metal part. The heated line forming system also includes an air knife cooling system configured to maintain a dry area for the heated line, and to direct a coolant (e.g., cooling water, liquified gases such as liquid argon, solidified gases such as carbon dioxide snow, and so forth) around the heated line via a spray mechanism such that the coolant does not flow or splash into the heated line on the metal part. In certain embodiments, the heated line forming system includes multiple induction coils arranged along a line and spaced a short distance apart, but which, when operated simultaneously together, form a heated line on a surface of a metal part.

    REDUCED-DISTORTION HYBRID INDUCTION HEATING/WELDING ASSEMBLY
    18.
    发明申请
    REDUCED-DISTORTION HYBRID INDUCTION HEATING/WELDING ASSEMBLY 审中-公开
    减少混合感应加热/焊接总成

    公开(公告)号:US20160105933A1

    公开(公告)日:2016-04-14

    申请号:US14879716

    申请日:2015-10-09

    Abstract: In certain embodiments, inductive heating is added to a metal working process, such as a welding process, by an induction heating head. The induction heating head may be adapted specifically for this purpose, and may include one or more coils to direct and place the inductive energy, protective structures, and so forth. Productivity of a welding process may be improved by the application of heat from the induction heating head. The heating is in addition to heat from a welding arc, and may facilitate application of welding wire electrode materials into narrow grooves and gaps, as well as make the processes more amenable to the use of certain compositions of welding wire, shielding gasses, flux materials, and so forth. In addition, distortion and stresses are reduced by the application of the induction heating energy in addition to the welding arc source.

    Abstract translation: 在某些实施例中,通过感应加热头将感应加热加入到金属加工工艺,例如焊接工艺中。 感应加热头可以专门用于此目的,并且可以包括用于引导和放置感应能量,保护结构等的一个或多个线圈。 可以通过施加来自感应加热头的热来提高焊接工艺的生产率。 加热是来自焊接电弧的热量,并且可以有助于将焊丝电极材料施加到窄的沟槽和间隙中,并且使得这些工艺更适合于使用某些组成的焊丝,屏蔽气体,焊剂材料 ,等等。 此外,除了焊接电弧源之外,通过施加感应加热能量来减小变形和应力。

    Tower erecting system
    20.
    发明授权
    Tower erecting system 有权
    塔架设系统

    公开(公告)号:US09140029B2

    公开(公告)日:2015-09-22

    申请号:US13720535

    申请日:2012-12-19

    Abstract: In certain embodiments, a tower lifting system comprises a primary lifting system and a secondary lifting system. The primary lifting system includes a lift cap configured to support a tower section to be lifted, the lift cap having a first plurality of hoists, and a lift pole coupled to the lift cap, the lift pole having a lifting mechanism configured to lift the lift cap, the lift pole, and the tower section to be lifted from within a previously lifted tower section. The secondary lifting system comprises a second plurality of hoists configured to raise the tower section to be lifted to the lift cap from a tower foundation.

    Abstract translation: 在某些实施例中,塔架提升系统包括主提升系统和次升降系统。 主提升系统包括提升盖,其构造成支撑要被提升的塔架部分,提升盖具有第一多个起重机,以及联接到提升盖的提升杆,提升杆具有升降机构, 盖子,电梯杆和塔架部分从先前提升的塔部分提升。 第二提升系统包括第二多个提升机,其构造成将塔架部分从塔架基座升高到提升盖。

Patent Agency Ranking