公开(公告)号:US12204304B2
公开(公告)日:2025-01-21
申请号:US17724473
申请日:2022-04-19
Applicant: Tsinghua University
Inventor: Wenchuan Wu , Boming Zhang , Zihao Li , Hongbin Sun , Bin Wang , Qinglai Guo
IPC: G05B19/042
Abstract: A planning method for a power distribution automation system based on a reliability constraint is provided. The method includes: defining installation states of components and principles of a fault isolation, a load transfer and a fault recovery after a branch fault occurs; establishing a reliability evaluation optimization model for a power distribution network based on a mixed integer linear programming, the reliability evaluation optimization model comprising a target function and constraint conditions; solving the reliability evaluation optimization model to obtain an optimum planning scheme; and planning the power distribution automation system based on the optimum planning scheme.
-
公开(公告)号:US11972182B2
公开(公告)日:2024-04-30
申请号:US17322912
申请日:2021-05-18
Applicant: TSINGHUA UNIVERSITY
Inventor: Hongbin Sun , Qinglai Guo , Bin Wang , Guanxiong Yin , Zhaoguang Pan , Binbin Chen
IPC: G06F30/28 , G06F17/16 , G06F111/10
CPC classification number: G06F30/28 , G06F17/16 , G06F2111/10
Abstract: Provided is a method for a dynamic state estimation of a natural gas network considering dynamic characteristics of natural gas pipelines. The method can obtain a result of the dynamic state estimation of the natural gas network by establishing an objective function of the dynamic state estimation of the natural gas network, a state quantity constraint of a compressor, a state quantity constraint of the natural gas pipeline and a topological constraint of the natural gas network, and using a Lagrange method or an interior point method to solve a state estimation model of the natural gas network. The method takes the topological constraint of the natural gas network into consideration, and employs a pipeline pressure constraint in a frequency domain to implement linearization of the pipeline pressure constraint, thereby obtain a real-time, reliable, consistent and complete dynamic operating state of the natural gas network.
-
公开(公告)号:US20220398505A1
公开(公告)日:2022-12-15
申请号:US17778822
申请日:2019-12-03
Applicant: TSINGHUA UNIVERSITY
IPC: G06N20/20
Abstract: Disclosed is an ensemble coupled assimilation system for numerical prediction and the method thereof. The ensemble coupled assimilation system includes a module for integrating coupled models and managing collaborative ensemble operation, an assimilation algorithms integration module, a module for configuring ensemble coupled assimilation experiment, and an online interaction module for ensemble coupled assimilation.
-
公开(公告)号:US11342753B2
公开(公告)日:2022-05-24
申请号:US17029888
申请日:2020-09-23
Applicant: TSINGHUA UNIVERSITY , STATE GRID JIBEI ELECTRIC POWER COMPANY , STATE GRID CORPORATION OF CHINA
Inventor: Bin Wang , Yanling Du , Wenchuan Wu , Haitao Liu , Hongbin Sun , Weimin Sun , Zongda Mu , Chenhui Lin , Qinglai Guo
IPC: G05B19/042 , H02J3/36 , H02J3/46 , H02J3/28
Abstract: The present disclosure provides a scheduling method for a power system based on flexible HVDC (high-voltage direct current) and a pumped storage power station, which belongs to a field of power system control technologies. The method is applicable in a power system having a flexible HVDC system and a pumped storage power station. By establishing a scheduling model for the power system, which contains an objective function and multiple constraints, and solving the scheduling model, a capability of the pumped storage power station is used to adjust the unstable output of the renewable energy power generator and stabilize fluctuant of the renewable energy power generation, such that a power incoming into a load center presents a stable ladder pattern and an optimal scheduling scheme can be obtained.
-
公开(公告)号:US10277033B2
公开(公告)日:2019-04-30
申请号:US15446097
申请日:2017-03-01
Applicant: Tsinghua University
Inventor: Wenchuan Wu , Boming Zhang , Xin Chen , Hongbin Sun , Qinglai Guo , Bin Wang
Abstract: The present disclosure provides a method and a device for controlling a distributed generator in a distribution system. The method includes: extracting a first statistic feature of a load at each bus; extracting a second statistic feature of a distributed generator at each bus; establishing a probability distribution set of each first and second statistic feature; determining security constraints of the distribution system; obtaining a bilinear matrix inequality constraint by using a C-VaR approximation algorithm and a duality algorithm based on the probability distribution set and on the security constraints; determining an objective function to maximize a total installed capacity of the distributed generators; solving the objective function according to the bilinear matrix inequality constraint to obtain an installed capacity of each distributed generator; and controlling an access of each distributed generator according to the installed capacity. The method may take full use of statistic features and has higher practicability.
-
公开(公告)号:US10241532B2
公开(公告)日:2019-03-26
申请号:US14850657
申请日:2015-09-10
Applicant: Tsinghua University
Inventor: Hongbin Sun , Qinglai Guo , Bin Wang , Boming Zhang , Wenchuan Wu , Huaichang Ge
Abstract: The present disclosure relates to a partition method and a partition device for a power system and belongs to a field of an evaluation and control of a power system. The method includes steps of: obtaining a quasi-steady sensitivity matrix according to generators participating in automatic voltage control and load buses in the power system; obtaining a power system model according to the quasi-steady sensitivity matrix and the load buses; determining principal component vectors and principal component singular values according to the power system model; determining a principal component vector dominated by each generator according to the principal component vectors and the principal component singular values; and partitioning the generators dominating a same principal component vector to a partition, and partitioning the load buses according to a partition result for the generators.
-
公开(公告)号:US10146193B2
公开(公告)日:2018-12-04
申请号:US15609510
申请日:2017-05-31
Applicant: Tsinghua University
Inventor: Wenchuan Wu , Boming Zhang , Zihao Li , Hongbin Sun , Bin Wang , Qinglai Guo
IPC: F24F11/00 , G05B13/04 , G05D23/19 , G05F1/66 , F24F11/30 , F24F11/62 , F24F11/54 , H02J3/14 , F24F110/00 , F24F140/50
Abstract: The present disclosure relates to a method for primary frequency regulation of an electric network based on large building air conditioning loads cluster. The method includes the use of a two layer control structure with a central coordinating layer and a local control layer. Each local controller performs a thermal model parameter identification and a local air conditioning autonomous control, and uploads local information to the central controller at the end of each communication interval tgap, the central controller broadcasts coordinating information to each local controller. Based on the coordinating information sent from the central controller, each local controller determines whether a power deviation is beyond an action dead zone at the beginning of each action period tact, if beyond, then perform a frequency regulation control action, else, perform no action and estimate operation states of all the air conditionings at the beginning of the next action period.
-
18.
公开(公告)号:US10079490B2
公开(公告)日:2018-09-18
申请号:US14835144
申请日:2015-08-25
Applicant: Tsinghua University
Inventor: Qinglai Guo , Hongbin Sun , Bin Wang , Boming Zhang , Wenchuan Wu , Tao Niu
CPC classification number: H02J3/12 , H02J3/18 , H02J3/386 , Y02E10/763 , Y02E40/30
Abstract: Disclosed are a method and a device for determining safe threshold for power grid voltage of a wind farm converging area, The method includes: obtaining ground state voltage; obtaining upper and lower limit voltage of the output bus, first lower and upper limit of reactive powers of fans and compensation devices, and lower and upper limit of active power fluctuations; obtaining second lower and upper limit of reactive powers of fans and compensation devices; determining whether voltage error is greater than a predetermined threshold; replacing the first lower and upper limit of the reactive powers of fans and the reactive powers of compensation devices with the second lower and upper limit of reactive powers of fans and compensation devices respectively, and repeating above steps if the voltage error is greater than the predetermined threshold, else defining the upper and lower limit voltage of the output bus as a safe threshold.
-
19.
公开(公告)号:US20140046493A1
公开(公告)日:2014-02-13
申请号:US13914270
申请日:2013-06-10
Applicant: Tsinghua University
Inventor: Hongbin Sun , Qinglai Guo , Boming Zhang , Wenchuan Wu , Bin Wang , Mingye Zhang
IPC: G05B15/02
CPC classification number: G05B15/02 , G06F2217/78 , H02J3/005 , H02J3/06 , H02J3/12 , H02J2003/001 , H02J2003/007 , Y02E40/76 , Y02E60/76 , Y04S10/525 , Y04S10/545 , Y04S40/22
Abstract: A static security constrained automatic voltage control method is provided, which includes: performing a single automatic voltage control calculation for a control snapshot of a power system in each control cycle. The single automatic voltage control calculation comprises: obtaining a single-time severe contingency sequencing table and a periodical severe contingency sequencing table from a historical severe contingency information database, and selecting severe contingencies; performing a contingency assessment for the active contingency set, and iterating between a result of the contingency assessment for the active contingency set and a solution of the optimal power flow model to obtain a single automatic voltage control instruction; and performing a contingency assessment for a contingency set, and updating the single-time severe contingency sequencing table and the periodical severe contingency sequencing table according to a comprehensive result of the contingency assessment.
Abstract translation: 提供了一种静态安全约束的自动电压控制方法,其中包括:在每个控制周期内对电力系统的控制快照进行单次自动电压控制计算。 单次自动电压控制计算包括:从历史严重应急信息数据库获取单次严重应急排序表和周期性严重应急排序表,选择严重意外事件; 对主动应急集合进行应急评估,并对活动应急集合的应急评估结果与最优潮流模型求解获得单个自动电压控制指令之间的迭代; 并对应急组合进行应急评估,根据应急评估的综合结果更新单次严重应急排序表和周期性严重应急排序表。
-
公开(公告)号:US12254385B2
公开(公告)日:2025-03-18
申请号:US17389558
申请日:2021-07-30
Applicant: Tsinghua University
Inventor: Wenchuan Wu , Haotian Liu , Hongbin Sun , Bin Wang , Qinglai Guo
IPC: G06N20/00
Abstract: A method for multi-time scale reactive voltage control based on reinforcement learning in a power distribution network is provided, which relates to the field of power system operation and control. The method includes: constituting an optimization model for multi-time scale reactive voltage control in a power distribution network based on a reactive voltage control object of a slow discrete device and a reactive voltage control object of a fast continuous device in the power distribution network; constructing a hierarchical interaction training framework based on a two-layer Markov decision process based on the model; setting a slow agent for the slow discrete device and setting a fast agent for the fast continuous device; and deciding action values of the controlled devices by each agent based on measurement information inputted, so as to realize the multi-time scale reactive voltage control while the slow agent and the fast agent perform continuous online learning.
-
-
-
-
-
-
-
-
-