公开(公告)号:US20110101116A1
公开(公告)日:2011-05-05
申请号:US13000322
申请日:2008-06-30
IPC分类号: G05D23/00
CPC分类号: F24F11/0001 , F24F11/30 , F24F2110/00 , H05K7/20745 , H05K7/20836
摘要: In a method for determining a substantially optimized fluid flow distribution in a structure configured to be cooled by a fluid moving device, an indication to activate the fluid moving device according to a reference temperature setpoint of a plurality of sensors is outputted. In addition, conditions detected in multiple areas of the structure with the plurality of sensors are received, a master sensor among the plurality of sensors based upon the detected conditions is identified; and a master reference temperature setpoint for the master sensor that substantially optimizes fluid flow distribution in the structure based upon conditions detected by the plurality of sensors in response to changes in a characteristic of fluid flow supplied to the plurality of sensors is determined.
摘要翻译: 在用于确定构造成由流体移动装置冷却的结构中的基本上优化的流体流动分布的方法中,输出根据多个传感器的参考温度设定点激活流体移动装置的指示。 此外,接收到具有多个传感器的结构的多个区域中检测到的条件,基于检测到的条件识别出多个传感器中的主传感器; 并且确定主传感器的主参考温度设定点,其基于响应于提供给多个传感器的流体流的特性的变化,基于由多个传感器检测到的条件来实质上优化结构中的流体流动分布。
-
公开(公告)号:US20100305923A1
公开(公告)日:2010-12-02
申请号:US12744898
申请日:2007-11-27
申请人: Amip Shah , Ratnesh Kumar Sharma , Chih C. Shih , Cullen E. Bash , Chandrakant Patel , Abdlmonem Beitelal
发明人: Amip Shah , Ratnesh Kumar Sharma , Chih C. Shih , Cullen E. Bash , Chandrakant Patel , Abdlmonem Beitelal
IPC分类号: G06G7/48
CPC分类号: G06F1/20 , H05K7/20836
摘要: In a method of synthesizing components to design a system meeting an exergy loss target value, one or more candidate sets of components are synthesized and an exergy loss value for each of the one or more candidate sets of components are calculated. A determination as to whether at least one of the candidate set of components meets the exergy loss target value is made and at least one candidate set of components determined to meet the exergy loss target value is identified as the set of components for use in the design of the system.
摘要翻译: 在合成组件以设计满足有效能损失目标值的系统的方法中,合成一个或多个候选组分,并且计算所述一个或多个候选组分组中的每一个的有效能损失值。 确定候选组件中的至少一个是否符合有效能损失目标值,并且确定满足有效能损失目标值的至少一个被确定的组件的候选组被确定为用于设计中的组件集合 的系统。
-
公开(公告)号:US20140278692A1
公开(公告)日:2014-09-18
申请号:US14353607
申请日:2011-12-23
申请人: Manish Marwah , Alan A. McReynolds , Amip J. Shah , Zhikui Wang , Chandrakant Patel , Daniel Juergen Gmach , Chris D. Hyser , Niru Kumari , Zhenhua Liu , Cullen E. Bash , Martin Arlitt , Sergey Blagodurov , Yuan Chen , Thomas W. Christian
发明人: Manish Marwah , Alan A. McReynolds , Amip J. Shah , Zhikui Wang , Chandrakant Patel , Daniel Juergen Gmach , Chris D. Hyser , Niru Kumari , Zhenhua Liu , Cullen E. Bash , Martin Arlitt , Sergey Blagodurov , Yuan Chen , Thomas W. Christian
IPC分类号: G06Q10/06
CPC分类号: G06Q10/06312
摘要: In a method for managing a facility that is to receive resources from a first resource supply, a supply of resources available from the first resource supply is predicted for a predetermined period of time. In addition, a demand for resources in the facility during the predetermined period of time is predicted. A capacity schedule for the facility is planned to meet a predefined operational goal, in which the plan of the capacity schedule uses as inputs, the predicted supply of resources available from the first resource supply and the predicted demand for resources in the facility during the predetermined period of time. Moreover, a determination as to whether the planned capacity schedule meets the predefined operational goal is made.
摘要翻译: 在用于管理从第一资源供应接收资源的设施的方法中,预定从第一资源供应可用的资源的供应达预定的时间段。 此外,预测在预定时段期间对设施中的资源的需求。 该设施的容量计划计划满足预定义的操作目标,其中容量计划的计划用作输入,可预测的从第一资源供应获得的资源的供应以及在预定期间对设施中的资源的预测需求 一段的时间。 此外,确定计划容量计划是否符合预定义的操作目标。
-
公开(公告)号:US20120297385A1
公开(公告)日:2012-11-22
申请号:US13110539
申请日:2011-05-18
申请人: Martin Arlitt , Manish Marwah , Cullen E. Bash , Daniel Jurgen Gmach , Amip J. Shah , Thomas W. Christian , Yuan Chen , Chandrakant Patel
发明人: Martin Arlitt , Manish Marwah , Cullen E. Bash , Daniel Jurgen Gmach , Amip J. Shah , Thomas W. Christian , Yuan Chen , Chandrakant Patel
IPC分类号: G06F9/46
CPC分类号: G06F11/3433 , G06F11/3419 , G06F11/3442 , G06F11/3495 , G06F2201/81 , G06F2201/875
摘要: In one implementation, an interactive service management system includes a performance profile module and a performance evaluation module. The performance profile modules defines a performance measure of an interactive service based on a quality assessment associated with the interactive service. The performance evaluation module compares the performance measure with performance target associated with the interactive service, and modifies the performance target associated with the interactive service based on the comparison of the performance measure and the performance target.
摘要翻译: 在一个实现中,交互式服务管理系统包括性能简档模块和性能评估模块。 性能简档模块基于与交互式服务相关联的质量评估来定义交互式服务的性能测量。 性能评估模块将性能测量与与交互式服务相关联的性能目标进行比较,并且基于性能测量与性能目标的比较来修改与交互式服务相关联的性能目标。
-
公开(公告)号:US08914155B1
公开(公告)日:2014-12-16
申请号:US12914600
申请日:2010-10-28
申请人: Amip J. Shah , Cullen E. Bash , Zhikui Wang
发明人: Amip J. Shah , Cullen E. Bash , Zhikui Wang
IPC分类号: H05K7/20
CPC分类号: H05K7/20745 , H05K7/20836
摘要: Methods, apparatus, systems and articles of manufacture to control fluid flow in a data center are disclosed herein. An example method disclosed herein comprises sensing a condition of a fluid in a first contained aisle on a first side of data center equipment, the fluid in the first contained aisle substantially isolated from a second contained aisle on a second side of the data center equipment, and controlling a vent to alter the fluid flow between the first contained aisle and the second contained aisle based on the sensed condition.
摘要翻译: 本文公开了用于控制数据中心中的流体流动的方法,装置,系统和制品。 本文公开的示例性方法包括:在数据中心设备的第一侧上感测第一容纳通道中的流体的状态,第一容纳通道中的流体与数据中心设备的第二侧上的第二容纳通道基本隔离, 以及基于感测到的状况来控制排气口改变第一容纳通道和第二容纳通道之间的流体流动。
-
公开(公告)号:US20130116803A1
公开(公告)日:2013-05-09
申请号:US13288669
申请日:2011-11-03
IPC分类号: G05B13/02
CPC分类号: G05B19/042
摘要: Carbon footprint management for structures is disclosed. In an example, a method includes determining a value of a first carbon footprint of the structure when operated at an existing demand for a first time period, and comparing the value of the first carbon footprint to a value of a prorated carbon cap of the structure for the first time period. If the first carbon footprint is less than or equal to the prorated carbon cap, the structure is operated for a second time period according to the existing demand or other demand that keeps a second carbon footprint of the structure below a prorated carbon cap for the second time period. Otherwise, the demand is adjusted to bring the second carbon footprint to approximate the prorated carbon cap for the second time period, and the structure is operated according to the adjusted demand for the second time period.
摘要翻译: 披露了结构的碳足迹管理。 在一个示例中,一种方法包括当在第一时间段的现有需求下操作时确定结构的第一碳足迹的值,以及将第一碳足迹的值与该结构的分配碳帽的值进行比较 第一次。 如果第一个碳足迹小于或等于按比例分配的碳盖,则结构根据现有需求或其他需求运行第二个时间段,这将使结构的第二个碳足迹保持在比例分配的碳帽下面 时间段。 否则,调整需求,使第二次碳足迹在第二时间段内达到按比例分配的碳上限,结构按照第二次调整后的需求进行运行。
-
公开(公告)号:US20130110306A1
公开(公告)日:2013-05-02
申请号:US13282390
申请日:2011-10-26
申请人: Zhikui Wang , Cullen E. Bash , Niru Kumari , Amip J. Shah , Tahir Cader
发明人: Zhikui Wang , Cullen E. Bash , Niru Kumari , Amip J. Shah , Tahir Cader
IPC分类号: G05D23/00
CPC分类号: G05D23/1924 , H05K7/1498 , H05K7/20836
摘要: Systems and methods of managing multiple cooling systems in a facility are disclosed. An example method may include evaluating efficiency of multiple cooling systems for a runtime operating condition. The method may also include selecting an efficient operating configuration of the multiple cooling systems for the runtime operating condition.
摘要翻译: 公开了在设施中管理多个冷却系统的系统和方法。 示例性方法可以包括评估用于运行时间运行条件的多个冷却系统的效率。 该方法还可以包括为运行时间操作条件选择多个冷却系统的有效操作配置。
-
公开(公告)号:US08321183B2
公开(公告)日:2012-11-27
申请号:US12353104
申请日:2009-01-13
申请人: Amip J. Shah , Cullen E. Bash
发明人: Amip J. Shah , Cullen E. Bash
CPC分类号: G06F17/50 , G06F2217/08 , G06F2217/10 , G06Q10/06
摘要: In a computer-implemented method of designing at least one system to achieve a target goal, an inventory of a plurality of variables that affect the design of the at least one system is created, where the inventory includes a feasibility range for each of the plurality of variables contained in the inventory is created. In addition, initial values are assigned for the plurality of variables in the inventory and a model of input to output correlations of the plurality of variables is created by commissioning the plurality of variables from the initial values. Moreover, a design of the at least one system to achieve the target goal is optimized by manipulating one or more of the plurality of variables through application of the model.
摘要翻译: 在设计至少一个系统以实现目标目标的计算机实现的方法中,创建影响至少一个系统的设计的多个变量的库存,其中库存包括多个的每个的可行性范围 创建了库存中包含的变量。 此外,为库存中的多个变量分配初始值,并且通过从初始值调试多个变量来创建多个变量的输出到输出相关性的模型。 此外,通过应用模型来操纵多个变量中的一个或多个来优化实现目标目标的至少一个系统的设计。
-
公开(公告)号:US09176544B2
公开(公告)日:2015-11-03
申请号:US13704147
申请日:2010-06-16
申请人: Justin James Meza , Jichuan Chang , Parthasarathy Ranganathan , Amip J. Shah , Cullen E. Bash , Chih C. Shih
发明人: Justin James Meza , Jichuan Chang , Parthasarathy Ranganathan , Amip J. Shah , Cullen E. Bash , Chih C. Shih
CPC分类号: G06F1/181 , G06F1/184 , G06F1/20 , G06F2200/201 , H05K7/1489
摘要: Example computer racks to improve environmental sustainability in data centers are disclosed. An example computer rack includes a spine (125); a first set of support structures (500) and a second set of support structures (500) extending from the spine (125). Each of the support structures (500) is positioned to receive a respective blade. A first communication port is carried by the spine (125) and associated with the first set of support structures (500). A second communication port is carried by the spine (125) and associated with the second set of support structures (500).
摘要翻译: 披露了用于改善数据中心环境可持续性的示例性计算机机架。 示例性计算机机架包括脊柱(125); 第一组支撑结构(500)和从脊柱(125)延伸的第二组支撑结构(500)。 每个支撑结构(500)被定位成接收相应的叶片。 第一通信端口由脊(125)承载并与第一组支撑结构(500)相关联。 第二通信端口由脊(125)承载并与第二组支撑结构(500)相关联。
-
公开(公告)号:US08688288B2
公开(公告)日:2014-04-01
申请号:US13022260
申请日:2011-02-07
申请人: Amip J. Shah , Cullen E. Bash , Chih C. Shih , Jichuan Chang , Parthasarathy Ranganathan , Justin James Meza
发明人: Amip J. Shah , Cullen E. Bash , Chih C. Shih , Jichuan Chang , Parthasarathy Ranganathan , Justin James Meza
IPC分类号: G06F19/00
CPC分类号: H05K7/20836
摘要: In a method for managing an infrastructure housing a plurality of disaggregated heat sources, in which a first disaggregated heat source has different heat dissipation characteristics as compared with a second disaggregated heat source, cooling requirements for the disaggregated heat sources are determined, in which the first disaggregated heat source and the second disaggregated heat source are to be positioned in separate homogeneous zones of the infrastructure. In addition, a respective available cooling resource is associated with the disaggregated heat sources based upon the determined cooling requirements of the disaggregated heat sources.
摘要翻译: 在一种用于管理容纳多个分解热源的基础设施的方法中,其中与第二解聚热源相比,第一解聚热源具有不同的散热特性,确定分解热源的冷却要求,其中第一 分解的热源和第二分解的热源将被定位在基础设施的单独的均匀区域中。 另外,相应的可用的冷却资源基于所分解的热源的确定的冷却要求与分解的热源相关联。
-
-
-
-
-
-
-
-
-