摘要:
In a method for managing a facility that is to receive resources from a first resource supply, a supply of resources available from the first resource supply is predicted for a predetermined period of time. In addition, a demand for resources in the facility during the predetermined period of time is predicted. A capacity schedule for the facility is planned to meet a predefined operational goal, in which the plan of the capacity schedule uses as inputs, the predicted supply of resources available from the first resource supply and the predicted demand for resources in the facility during the predetermined period of time. Moreover, a determination as to whether the planned capacity schedule meets the predefined operational goal is made.
摘要:
In a method for distributing cooling resources to a plurality of locations using a plurality of hierarchically identified cooling microgrids, conditions detected at the plurality of locations are received. Each level of the hierarchically identified cooling microgrids is a plurality of resource actuators configured to vary distribution of the cooling resources. Settings for the plurality of resource actuators in each of the levels in the cooling microgrid hierarchy that substantially maintain conditions at the plurality of locations within predetermined ranges are determined using a processor, while substantially optimizing at least one measure of performance associated with supplying the cooling resources to the plurality of locations.
摘要:
In a method for generating a resource management plan for an infrastructure, a resource supply available from a combination of resource sources is determined, an operation of the infrastructure in performing an objective using the determined supply of resources is simulated, in which the simulation is to simulate resource demand of a plurality of infrastructure components in performing the objective, a metric(s) associated with operating the infrastructure based upon the simulation is determined, a determination as to whether the metric(s) satisfies a predetermined goal(s) is made, the resources supplied and/or the simulation of the resource demand of the plurality of infrastructure components is modified in response to the at least one metric failing to satisfy the predetermined goal(s), and a resource management plan for the infrastructure that has been determined to result in the metric(s) satisfying the predetermined goal(s) is generated.
摘要:
Methods, apparatus, systems and articles of manufacture to control fluid flow in a data center are disclosed herein. An example method disclosed herein comprises sensing a condition of a fluid in a first contained aisle on a first side of data center equipment, the fluid in the first contained aisle substantially isolated from a second contained aisle on a second side of the data center equipment, and controlling a vent to alter the fluid flow between the first contained aisle and the second contained aisle based on the sensed condition.
摘要:
Systems and methods of managing multiple cooling systems in a facility are disclosed. An example method may include evaluating efficiency of multiple cooling systems for a runtime operating condition. The method may also include selecting an efficient operating configuration of the multiple cooling systems for the runtime operating condition.
摘要:
In a method for distributing cooling resources to a plurality of locations using a plurality of hierarchically identified cooling microgrids, conditions detected at the plurality of locations are received. Each level of the hierarchically identified cooling microgrids is a plurality of resource actuators configured to vary distribution of the cooling resources. Settings for the plurality of resource actuators in each of the levels in the cooling microgrid hierarchy that substantially maintain conditions at the plurality of locations within predetermined ranges are determined using a processor, while substantially optimizing at least one measure of performance associated with supplying the cooling resources to the plurality of locations.
摘要:
In a method of determining cooling resource capacity allocations for resource units in a shared environment for optimized operations, cost parameters associated with operating the resource units in at least one of delivering and receiving cooling resources are identified, one or more constraints associated with operating the resource units are identified, in which at least one of the one or more constraints comprises meeting at least a total cooling demand of components in the shared environment, a cost function that correlates the plurality of identified cost parameters is developed, a minimized cost function is solved for through application of a Lagrange multiplier subject to the identified one or more constraints, and cooling resource capacity allocations for the resource units that result in optimized operations in the shared environment based upon the minimized cost function solution are determined.
摘要:
In a method of evaluating an infrastructure having a plurality of components based upon exergy loss values, exergy loss values of the components are aggregated. In addition, at least one of the components in the infrastructure is controlled based upon the aggregated exergy loss values.
摘要:
A system for controlling moisture content in ambient airflow in a substantially enclosed structure having components. The system includes at least one humidity control apparatus and a plurality of sensors for detecting moisture content in airflow in a plurality of locations of the substantially enclosed structure. The plurality of sensors are located remotely from the at least one humidity control apparatus and are situated in relatively close proximity to the components that the at least one humidity control apparatus is configured to affect. The system also includes a controller configured to receive moisture content levels detected by one or more of the plurality of sensors and to control the at least one humidity control apparatus based upon the detected moisture content levels to vary the moisture content in the ambient airflow around the plurality of locations.
摘要:
In a computer-implemented method of designing at least one system to achieve a target goal, an inventory of a plurality of variables that affect the design of the at least one system is created, where the inventory includes a feasibility range for each of the plurality of variables contained in the inventory is created. In addition, initial values are assigned for the plurality of variables in the inventory and a model of input to output correlations of the plurality of variables is created by commissioning the plurality of variables from the initial values. Moreover, a design of the at least one system to achieve the target goal is optimized by manipulating one or more of the plurality of variables through application of the model.