摘要:
In a method for managing a facility that is to receive resources from a first resource supply, a supply of resources available from the first resource supply is predicted for a predetermined period of time. In addition, a demand for resources in the facility during the predetermined period of time is predicted. A capacity schedule for the facility is planned to meet a predefined operational goal, in which the plan of the capacity schedule uses as inputs, the predicted supply of resources available from the first resource supply and the predicted demand for resources in the facility during the predetermined period of time. Moreover, a determination as to whether the planned capacity schedule meets the predefined operational goal is made.
摘要:
In a method for distributing cooling resources to a plurality of locations using a plurality of hierarchically identified cooling microgrids, conditions detected at the plurality of locations are received. Each level of the hierarchically identified cooling microgrids is a plurality of resource actuators configured to vary distribution of the cooling resources. Settings for the plurality of resource actuators in each of the levels in the cooling microgrid hierarchy that substantially maintain conditions at the plurality of locations within predetermined ranges are determined using a processor, while substantially optimizing at least one measure of performance associated with supplying the cooling resources to the plurality of locations.
摘要:
In a method for generating a resource management plan for an infrastructure, a resource supply available from a combination of resource sources is determined, an operation of the infrastructure in performing an objective using the determined supply of resources is simulated, in which the simulation is to simulate resource demand of a plurality of infrastructure components in performing the objective, a metric(s) associated with operating the infrastructure based upon the simulation is determined, a determination as to whether the metric(s) satisfies a predetermined goal(s) is made, the resources supplied and/or the simulation of the resource demand of the plurality of infrastructure components is modified in response to the at least one metric failing to satisfy the predetermined goal(s), and a resource management plan for the infrastructure that has been determined to result in the metric(s) satisfying the predetermined goal(s) is generated.
摘要:
Methods, apparatus, systems and articles of manufacture to control fluid flow in a data center are disclosed herein. An example method disclosed herein comprises sensing a condition of a fluid in a first contained aisle on a first side of data center equipment, the fluid in the first contained aisle substantially isolated from a second contained aisle on a second side of the data center equipment, and controlling a vent to alter the fluid flow between the first contained aisle and the second contained aisle based on the sensed condition.
摘要:
Systems and methods of managing multiple cooling systems in a facility are disclosed. An example method may include evaluating efficiency of multiple cooling systems for a runtime operating condition. The method may also include selecting an efficient operating configuration of the multiple cooling systems for the runtime operating condition.
摘要:
In a method for distributing cooling resources to a plurality of locations using a plurality of hierarchically identified cooling microgrids, conditions detected at the plurality of locations are received. Each level of the hierarchically identified cooling microgrids is a plurality of resource actuators configured to vary distribution of the cooling resources. Settings for the plurality of resource actuators in each of the levels in the cooling microgrid hierarchy that substantially maintain conditions at the plurality of locations within predetermined ranges are determined using a processor, while substantially optimizing at least one measure of performance associated with supplying the cooling resources to the plurality of locations.
摘要:
In a method for supplying a resource to an entity from a resource actuator, a plurality of physics-based models pertaining to the resource actuator and the entity are developed, a condition detected at the entity is received, feedback control on a resource demand of the entity employed based upon the detected condition, feed forward control on the resource demand of the entity is employed based upon the detected condition and the plurality of physics-based models, a constraint optimization problem having an objective function and at least one constraint using the plurality of physics-based models is formulated, a solution to the constraint optimization problem is determined, in which the solution provides the actuator setting, and the resource actuator is set to the actuator setting to supply the entity with the resource from the resource actuator.
摘要:
In a method for manipulating environmental conditions in an infrastructure containing one or more adaptive vent tiles, correlations between opening levels of the one or more adaptive vent tiles and an environmental condition at one or more heat dissipating devices are identified. In addition, one or more environmental conditions at locations proximate to or within the one or more heat dissipating devices are received and errors between the received one or more environmental conditions and one or more reference environmental conditions are identified. Moreover, opening levels for the one or more adaptive vent tiles are determined based upon the identified correlations and errors.
摘要:
A data center workload distribution management system includes a cooling cost engine to determine a cooling cost or cooling capacity for each of a plurality of zones of a data center and a workload distribution engine. The workload distribution engine is to identify the zone that has a lowest cooling cost and sufficient cooling capacity and also has sufficient processing capacity for a workload, determine a local cooling efficiency index for at least one location within the identified zone, and distribute the workload to the location having a local cooling efficiency index that indicates the highest cooling efficiency.
摘要:
A power model that relates the settings of resource actuators to power consumption levels of the resource actuators and a condition model that relates the settings of the resource actuators to an environmental condition at the location of the at least one entity and a power consumption level of the at least one entity are developed. A constraint optimization problem having an objective function and at least one constraint is formulated, where the objective function computes at least a proportional quantity of a total power consumption level of the resource actuators and the at least one constraint comprises a setpoint environmental condition at a location of the at least entity. A solution to the constraint optimization problem is determined, where the solution provides optimal values for the resource actuator settings.