-
51.
公开(公告)号:US20210334724A1
公开(公告)日:2021-10-28
申请号:US16860781
申请日:2020-04-28
Applicant: Johnson Controls Technology Company
Inventor: Andrew J. Przybylski , Michael J. Wenzel , John H. Burroughs
Abstract: A method for controlling an energy production and distribution system includes identifying sources that supply input resources, subplants that produce output resources using the input resources, and sinks that consume the output resources. The method includes obtaining a cost function including a cost of producing the output resources and generating a transit time constraint that requires the input resources be sent from the sources to the subplants at a first departure time that occurs before a first arrival time at which the input resources are predicted to be used by the subplants. The method includes solving an optimization problem to determine an amount of the output resources to produce at each of multiple time steps within a time period. Solving the optimization problem includes performing an optimization of the cost function subject to the transit time constraint.
-
公开(公告)号:US11137162B2
公开(公告)日:2021-10-05
申请号:US16442103
申请日:2019-06-14
Applicant: Johnson Controls Technology Company
Inventor: John H. Burroughs , Andrew J. Przybylski , Matthew J. Ellis , Mohammad N. EIBsat , Michael J. Wenzel
IPC: G05B19/042 , F24F11/63 , F24F140/60 , F24F140/00
Abstract: A controller for a building control system includes processors and memory storing instructions that, when executed by the processors, cause the processors to perform operations including identifying zones within a building, analyzing data associated with the zones, and generating zone groupings based on the data associated with the zones. Each of the zone groupings define zone groups and specify which of the zones are grouped together to form each of the zone groups. The operations also include identifying a particular zone grouping from zone groupings based on the data associated with zones and using the particular zone grouping to generate control signals to operate equipment of the building control system to provide heating or cooling to the zones.
-
53.
公开(公告)号:US11061424B2
公开(公告)日:2021-07-13
申请号:US16457302
申请日:2019-06-28
Applicant: Johnson Controls Technology Company
Inventor: Mohammad N. Elbsat , Michael J. Wenzel
IPC: G05F1/66 , G05B15/02 , H02J3/32 , G05B13/02 , H02J13/00 , G06Q10/04 , H02J7/00 , G06Q50/06 , H02J3/00
Abstract: A central plant includes storage devices configured to store resources purchased from a utility or generated by the central plant and to discharge the one or more resources. The central plant includes a controller configured to obtain a cost function comprising a peak load contribution (PLC) term representing a cost based on an amount of the one or more resources purchased during coincidental peak (CP) subperiods. The controller is configured to modify the cost function by applying a peak subperiods mask to the PLC term, wherein, for each subperiod, the peak subperiods mask modifies a portion of the PLC term corresponding to the subperiod based on a probability that the subperiod will be one of the CP subperiods. The controller is also configured to perform an optimization of the modified cost function.
-
公开(公告)号:US20210208547A1
公开(公告)日:2021-07-08
申请号:US17205215
申请日:2021-03-18
Applicant: Johnson Controls Technology Company
Inventor: John H. Burroughs , Andrew J. Przybylski , Michael J. Wenzel , Matthew J. Ellis
IPC: G05B13/04
Abstract: A method for controlling equipment includes grouping a plurality of granular assets to form one or more general assets and generating models of the general assets based on the granular assets that form the general assets. Each model corresponds to a general asset and defines a relationship between resources produced by the general asset and resources consumed by the general asset. The method includes performing a first control process using the models of the general assets to determine a first allocation of resources among the general assets. The first allocation defines amounts of the resources to be consumed, produced, or stored by each of the general assets. The method includes operating the equipment to consume, produce, or store the resources in accordance with the first allocation.
-
公开(公告)号:US11022947B2
公开(公告)日:2021-06-01
申请号:US15974443
申请日:2018-05-08
Applicant: Johnson Controls Technology Company
Inventor: Mohammad N. ElBsat , Michael J. Wenzel , Nicole A. Madison , Tricia J. Valentine , Collin W. Eggert , Matthew J. Asmus , James P. Kummer , Carol T. Tumey , Peter A. Craig
IPC: G05D3/12 , G05D5/00 , G05D9/00 , G05D11/00 , G05D17/00 , G05B19/042 , G06Q30/02 , G06Q50/06 , G05B15/02 , H02J3/38 , H02J3/32 , H02J3/00
Abstract: An energy optimization system for a building includes a processing circuit configured to generate a user interface including an indication of one or more economic load demand response (ELDR) operation parameters, one or more first participation hours, and a first load reduction amount for each of the one or more first participation hours. The processing circuit is configured to receive one or more overrides of the one or more first participation hours from the user interface, generate one or more second participation hours, a second load reduction amount for each of the one or more second participation hours, and one or more second equipment loads for the one or more pieces of building equipment based on the received one or more overrides, and operate the one or more pieces of building equipment to affect an environmental condition of the building based on the one or more second equipment loads.
-
公开(公告)号:US20210148592A1
公开(公告)日:2021-05-20
申请号:US16687122
申请日:2019-11-18
Applicant: Johnson Controls Technology Company
Inventor: Robert D. Turney , Liming Yang , Michael J. Wenzel
Abstract: A building cooling system includes one or more cooling devices operable to affect an indoor air temperature of a building and a system management circuit. The system management circuit is configured to obtain an objective function that includes a power consumption term and a comfort term, perform an optimization of the objective function over a time horizon to determine values of the cooling capacity of the cooling devices where each value of the cooling capacity corresponds to a time step of the time horizon, and control the cooling devices based on the values of the cooling capacity of the cooling devices. The comfort term of the objective function a difference between a prediction of the indoor air temperature of the building and a temperature setpoint for the building, while the power consumption term is a function of the power consumption of the one or more cooling devices.
-
57.
公开(公告)号:US10767886B2
公开(公告)日:2020-09-08
申请号:US15900459
申请日:2018-02-20
Applicant: Johnson Controls Technology Company
Inventor: Anas W. I. Alanqar , Matthew J. Ellis , Michael J. Wenzel
Abstract: A building management system includes building equipment, a sensor, and a saturation detector. The building equipment is configured to operate at an operating capacity to drive a variable state or condition of a building zone toward a setpoint. The operating capacity and the setpoint vary over time. The sensor is in the building zone and is configured to provide a zone measurement of the variable state or condition of the building zone. The saturation detector is configured to determine whether the operating capacity is in a non-transient region for a threshold amount of a time period upon determining that an error for the building zone exists for the time period, and, in response to a determination that the operating capacity is in the non-transient region for at least the threshold amount of the time period, indicate the time period as a saturation period.
-
公开(公告)号:US10739741B2
公开(公告)日:2020-08-11
申请号:US16352536
申请日:2019-03-13
Applicant: Johnson Controls Technology Company
Inventor: Michael J. Wenzel , Mohammad N. EIBsat , Kirk H. Drees
Abstract: A method for operating HVAC equipment includes obtaining building data for each of a plurality of time steps. The building data relates to resource usage of HVAC equipment. The method also includes calculating a recursive residual for each of a plurality of overlapping time periods using the building data. Each overlapping time period includes a subset of the plurality of time steps. The method also includes, for each of the plurality of time steps, calculating a metric based on the recursive residuals for overlapping time periods that end on or before the time step and automatically detecting a change in static factors for one or more buildings served by the HVAC equipment by comparing the metrics for the plurality of time steps based on a statistical property of the metrics.
-
公开(公告)号:US20200218233A1
公开(公告)日:2020-07-09
申请号:US16240466
申请日:2019-01-04
Applicant: Johnson Controls Technology Company
Inventor: Mohammad N. ElBsat , Michael J. Wenzel
IPC: G05B19/418 , G05B13/04 , G05F1/66 , G06Q50/06
Abstract: A building system includes building equipment operable to consume one or more resources and a control system configured to generate, based on a prediction model, predictions of a load on the building equipment or a price of the one or more resources for a plurality of time steps in an optimization period, solve, based on the predictions, an optimization problem to generate control inputs for the equipment that minimize a predicted cost of consuming the resources over the optimization period, control the building equipment to operate in accordance with the control inputs, monitor an error metric that characterizes an error between the predictions and actual values of the at least one of the load on the building equipment or the price of the one or more resources during the optimization period, detect an occurrence of a trigger condition, and in response to detecting the trigger condition, update the prediction model.
-
公开(公告)号:US10580097B2
公开(公告)日:2020-03-03
申请号:US15808388
申请日:2017-11-09
Applicant: Johnson Controls Technology Company
Inventor: Robert D. Turney , Michael J. Wenzel
Abstract: A cascaded model predictive control system includes an inner controller and an outer controller. The outer controller determines an amount of power to defer from a predicted power usage to optimize a total cost of power usage. A power setpoint is calculated based on a difference between the predicted power usage and the amount of power to defer. The inner controller determines an operating setpoint for building equipment in order to achieve the power setpoint.
-
-
-
-
-
-
-
-
-