BUILDING ENERGY MANAGEMENT SYSTEM WITH ENERGY ANALYTICS

    公开(公告)号:US20220299230A1

    公开(公告)日:2022-09-22

    申请号:US17688054

    申请日:2022-03-07

    Abstract: A building energy management system includes building equipment, a data collector, an analytics service, a timeseries database, and an energy management application. The building equipment monitor and control one or more variables in the building energy management system and provide data samples of the one or more variables. The data collector collects the data samples from the building equipment and generates a data timeseries including a plurality of the data samples. The analytics service performs one or more analytics using the data timeseries and generates a results timeseries including a plurality of result samples indicating results of the analytics. The timeseries database stores the data timeseries and the results timeseries. The energy management application retrieves the data timeseries and the results timeseries from the timeseries database in response to a request for timeseries data associated with the one or more variables.

    Building energy management system with ad hoc dashboard

    公开(公告)号:US10775988B2

    公开(公告)日:2020-09-15

    申请号:US16104653

    申请日:2018-08-17

    Abstract: A building energy management includes building equipment, one or more data platform services, a timeseries database, and an energy management application. The building equipment operate to monitor and control a variable and provide raw data samples of a data point associated with the variable. The timeseries database stores a plurality of timeseries associated with the data point. The plurality of timeseries include a timeseries of the raw data samples and the one or more optimized data timeseries generated by the data platform services based on the raw data timeseries. The energy management application generates an ad hoc dashboard including a widget and associates the widget with the data point. The widget displays a graphical visualization of the plurality of timeseries associated with the data point and includes interactive user interface options for switching between the plurality of timeseries associated with the data point.

    BUILDING ENERGY MANAGEMENT SYSTEM WITH AD HOC DASHBOARD

    公开(公告)号:US20180356969A1

    公开(公告)日:2018-12-13

    申请号:US16104653

    申请日:2018-08-17

    Abstract: A building energy management includes building equipment, one or more data platform services, a timeseries database, and an energy management application. The building equipment operate to monitor and control a variable and provide raw data samples of a data point associated with the variable. The timeseries database stores a plurality of timeseries associated with the data point. The plurality of timeseries include a timeseries of the raw data samples and the one or more optimized data timeseries generated by the data platform services based on the raw data timeseries. The energy management application generates an ad hoc dashboard including a widget and associates the widget with the data point. The widget displays a graphical visualization of the plurality of timeseries associated with the data point and includes interactive user interface options for switching between the plurality of timeseries associated with the data point.

    BUILDING ENERGY OPTIMIZATION SYSTEM WITH AUTOMATED AND DYNAMIC ECONOMIC LOAD DEMAND RESPONSE (ELDR) OPTIMIZATION

    公开(公告)号:US20180356770A1

    公开(公告)日:2018-12-13

    申请号:US15974411

    申请日:2018-05-08

    Abstract: An energy optimization system for a building includes a processing circuit configured to provide a first bid including one or more first participation hours and a first load reduction amount for each of the one or more first participation hours to a computing system. The processing circuit is configured to operate one or more pieces of building equipment based on one or more first equipment loads and receive one or more awarded or rejected participation hours from the computing system responsive to the first bid. The processing circuit is configured to generate one or more second participation hours, a second load reduction amount for each of the one or more second participation hours, and one or more second equipment loads based on the one or more awarded or rejected participation hours and operate the one or more pieces of building equipment based on the one or more second equipment loads.

Patent Agency Ranking