Abstract:
The present invention provides a solar photovoltaic rotation device installed the top of a pole so as to rotate a solar panel array, the device comprising: a first tubular body; a second tubular body; a gear unit; and a driving motor, wherein the gear unit is formed as a planet gear set comprising: a sun gear connected to a rotational shaft of the driving motor; multiple PL gears disposed around the sun gear to be engaged with the sun gear; and a ring gear disposed outside of the multiple PL gears to be engaged with the PL gears, the ring gear being fixed to the first tubular body, and at least one among the sun gear, the PL gears, and the ring gear has inclined teeth formed on the circumferential surface thereof, and thus has a tapered structure.
Abstract:
The present invention discloses a portable emergency escape device comprising a casing, a drum rotatably installed inside the casing and around which a wire is wound, a reduction gear connected to the drum, a DC motor having a rotation shaft connected to the reduction gear, a safety belt worn by a user, a braking resistor for determining a descent speed, and a constant speed control unit connected to the braking resistor. The braking resistor is connected between both ends of a power input terminal of the DC motor, and the braking resistor can control a resistance value. And, the constant speed control unit changes the resistance value of the braking resistor in response to the user's weight to maintain the descent speed constant regardless of the user's weight.
Abstract:
The present invention provides a solar photovoltaic rotation device installed the top of a pole so as to rotate a solar panel array, the solar photovoltaic rotation device comprising: a first tubular body connected to the solar panel array; a second tubular body coupled to the lower portion of the first tubular body and fixed to the top of the pole; a gear unit for transferring a rotation force to the first tubular body; and a driving motor fixed in the second tubular body so as to provide a rotation force to the gear unit, wherein the gear unit is formed as a planet gear set comprising: a sun gear connected to a rotating shaft of the driving motor; multiple PL gears disposed at predetermined intervals around the sun gear so as to be able to mesh with the sun gear; and a ring gear disposed outside the multiple PL gears so as to be able to mesh with the PL gears, the ring gear being fixed to the first tubular body, and at least one among the sun gear, the PL gears, and the ring gear has inclined teeth formed on the circumferential surface thereof, and thus has a tapered structure.
Abstract:
Disclosed is a delivered article loading apparatus, which is mounted to a lifting wire installed at the drone to be capable of lifting. The delivered article loading apparatus includes a lifting body installed at a lower end of the lifting wire; and a disposable hanging body coupled to be selectively connected to or separated from the lifting body and having a hooking unit at a lower portion thereof, wherein the lifting body and the disposable hanging body are automatically separated by a mechanical or electromagnetic interaction therebetween.
Abstract:
A monitoring system using a real-time simulator, providing a simulation environment of a real electric power system that enables testing of a new electric power system control facility. The operation of the new electric power system control facility and effects thereof on a real electric power system can be evaluated before actual installation. The monitoring system includes a test piece installed in an electric power system; a simulator connected to the test piece, and deriving electric power system simulation data by simulating the electric power system with respect to the test piece; a multimedia interface (MMI) platform interworking with the simulator, providing the simulator with electric power system status data for simulating the electric power system, and receiving the electric power system simulation data from the simulator; and an MMI client interworking with the MMI platform to display the electric power system simulation data from the MMI platform.
Abstract:
A monitoring system using a real-time simulator, providing a simulation environment of a real electric power system that enables testing of a new electric power system control facility. The operation of the new electric power system control facility and effects thereof on a real electric power system can be evaluated before actual installation. The monitoring system includes a test piece installed in an electric power system; a simulator connected to the test piece, and deriving electric power system simulation data by simulating the electric power system with respect to the test piece; a multimedia interface (MMI) platform interworking with the simulator, providing the simulator with electric power system status data for simulating the electric power system, and receiving the electric power system simulation data from the simulator; and an MMI client interworking with the MMI platform to display the electric power system simulation data from the MMI platform.
Abstract:
The present invention disclosed a elevating cable reel of single-layer winding type comprising; a main body installed on a ceiling or wall or a support of a predetermined shape and having a storage space therein; a drum rotatably accommodated inside the main body, and having a hollow therein, and a power cable being wound around a circumferential surface thereof; a driving motor disposed in the hollow to provide forward/reverse rotational force to the drum; a slip ring installed on a part of the drum to receive commercial power in a contact manner; and an elevating body suspended from the lower end of the power cable and installed to be elevated up and down. And, the power cable is wound in a single layer on the circumferential surface of the drum to prevent heat generation due to eddy current.
Abstract:
Disclosed is a delivered article loading apparatus, which is mounted to a lifting wire installed at the drone to be capable of lifting. The delivered article loading apparatus includes a lifting body installed at a lower end of the lifting wire; and a disposable hanging body coupled to be selectively connected to or separated from the lifting body and having a hooking unit at a lower portion thereof, wherein the lifting body and the disposable hanging body are automatically separated by a mechanical or electromagnetic interaction therebetween.
Abstract:
Provided is an optimized system voltage control method through coordinated control of reactive power source, which analyzes the location for reactive power compensation and the effect of applying compensation equipment by calculating the reactive power and voltage sensitivity of a power system, thus improving the voltage quality of the power system.The optimized system voltage control method includes verifying a voltage violation substation having a voltage exceeding a predetermined voltage reference value among buses of a test system on a computer program, configuring a local system with eight to ten substations with respect to the verified voltage violation substation, generating a reduced local system using a reduced local algorithm with respect to the buses within the configured local system, calculating a power flow by determining a voltage control amount for restoring the voltage of the voltage violation substation to a normal value with respect to the reduced local system, and calculating an optimization objective function value based on the voltage control amount and control operation.
Abstract:
Provided is an optimized system voltage control method through coordinated control of reactive power source, which analyzes the location for reactive power compensation and the effect of applying compensation equipment by calculating the reactive power and voltage sensitivity of a power system, thus improving the voltage quality of the power system. The optimized system voltage control method includes verifying a voltage violation substation having a voltage exceeding a predetermined voltage reference value among buses of a test system on a computer program, configuring a local system with eight to ten substations with respect to the verified voltage violation substation, generating a reduced local system using a reduced local algorithm with respect to the buses within the configured local system, calculating a power flow by determining a voltage control amount for restoring the voltage of the voltage violation substation to a normal value with respect to the reduced local system, and calculating an optimization objective function value based on the voltage control amount and control operation.