Activity Based Users' Interests Modeling for Determining Content Relevance
    1.
    发明申请
    Activity Based Users' Interests Modeling for Determining Content Relevance 有权
    基于活动的用户兴趣建模确定内容相关性

    公开(公告)号:US20110016121A1

    公开(公告)日:2011-01-20

    申请号:US12504527

    申请日:2009-07-16

    CPC classification number: G06F17/30702 G06F17/30867 G06Q30/02

    Abstract: A method and apparatus for activity-based users' interests modeling for determining relevance of the content distributed to the users is provided. Modeling of the user's interests starts by collecting information about the actions that the user performed and about the contents that were associated with the actions. That information may be used to determine how much interest the user has had in the individual subjects up to date, and to determine which subjects became more or less important to the user over time. Further processing of the information about the interests of each of the individual users in a group of users may produce characteristics indicating the interests of the group as a whole. Additional processing may generate the information reflecting relative importance of the interests of an individual user in the group to the interests of other users in the same group.

    Abstract translation: 提供了一种用于基于活动的用户兴趣建模的方法和装置,用于确定分发给用户的内容的相关性。 对用户兴趣的建模首先是收集有关用户执行的操作的信息以及与操作相关联的内容。 该信息可以用于确定用户在最新的个体主题中具有多少兴趣,并且确定哪些对象随着时间对用户变得越来越重要。 关于用户组中每个用户的兴趣的信息的进一步处理可以产生表示整个组的兴趣的特征。 附加处理可以产生反映组中个别用户的兴趣的相对重要性的信息,以使同一组中的其他用户的兴趣。

    System for and method of managing schedule compliance and bidirectionally communicating in real time between a user and a manager
    2.
    发明申请
    System for and method of managing schedule compliance and bidirectionally communicating in real time between a user and a manager 审中-公开
    在用户和管理者之间实时管理时间表合规性和双向通信的系统和方法

    公开(公告)号:US20060294108A1

    公开(公告)日:2006-12-28

    申请号:US11403792

    申请日:2006-04-13

    CPC classification number: G06Q10/06 A61B5/4833 G06F19/3456

    Abstract: A compliance/adherence management and automated data collection system uses a plurality of communications modalities implemented over wireless or wired communications systems for redundantly and persistently transmitting messages to and/or receiving messages from an end user for managing compliance/adherence of the end user concerning schedules and medication and treatment protocols. The system also uses wireless or wired communications modalities for automating real time collection of information from the end user concerning, for example, compliance with the schedule and/or protocol. The collected data can be remotely accessed, in real time, to monitor compliance/adherence and an end user's experiences resulting from compliance/adherence. Further, the management messages are so designed as to be highly personalized in order to achieve a more favorable response from the end user.

    Abstract translation: 合规/遵守管理和自动数据收集系统使用通过无线或有线通信系统实现的多个通信模式,用于从最终用户冗余地且持续地向终端用户发送消息和/或从终端用户接收消息,以管理最终用户关于时间表的遵从/遵守 以及药物治疗方案。 该系统还使用无线或有线通信模式来自动地从最终用户实时收集关于例如遵守时间表和/或协议的信息。 收集的数据可以实时远程访问,以监控合规性/遵守情况以及由遵守/遵守导致的最终用户体验。 此外,管理消息被设计为高度个性化以便从最终用户获得更有利的响应。

    Facilitation of multi-project management using task hierarchy
    4.
    发明申请
    Facilitation of multi-project management using task hierarchy 有权
    使用任务层次结构促进多项目管理

    公开(公告)号:US20050229151A1

    公开(公告)日:2005-10-13

    申请号:US11147479

    申请日:2005-06-08

    CPC classification number: G06Q10/06 G06F8/10 G06F8/20 G06F8/71

    Abstract: A method on a computer for providing critical chain-based project management is disclosed. The method includes receiving at least one project plan for a project comprising a plurality of tasks and calculating a task priority for each of the plurality of tasks based on the at least one project plan. The method further includes receiving at least one sub-task for a first task of the plurality of tasks and assigning the at least one sub-task a task priority identical to the task priority of the first task. In one alternative, the method further includes receiving a new task priority for the first task, assigning the new task priority to the first task and assigning the new task priority to the at least one sub-task of the first task. The method may also include an interface to allow starting of sub-tasks only when the parent task is started.

    Abstract translation: 公开了一种计算机上提供关键链式项目管理的方法。 所述方法包括:接收至少一个项目计划,用于包括多个任务的项目,并且基于所述至少一个项目计划来计算所述多个任务中的每一个的任务优先级。 所述方法还包括:为所述多个任务的第一任务接收至少一个子任务,并且将所述至少一个子任务分配给与所述第一任务的任务优先级相同的任务优先级。 在一个替代方案中,该方法还包括接收第一任务的新任务优先级,将新任务优先级分配给第一任​​务,并将新任务优先级分配给第一任​​务的至少一个子任务。 该方法还可以包括仅在父任务开始时允许启动子任务的接口。

    Manipulation of HSP70 and IRE1Alpha Protein Interactions
    5.
    发明申请
    Manipulation of HSP70 and IRE1Alpha Protein Interactions 审中-公开
    操纵HSP70和IRE1Alpha蛋白质相互作用

    公开(公告)号:US20130280269A1

    公开(公告)日:2013-10-24

    申请号:US13702649

    申请日:2011-06-08

    Abstract: The present invention relates to methods that manipulate the level of interaction between the proteins Hsp70 and IRE1α. In particular, the invention relates to methods of manipulating this interaction in order to increase protein yield, and to methods of manipulating this interaction in order to treat diseases associated with abnormal apoptotic activity, including cancer and autoimmune diseases.

    Abstract translation: 本发明涉及操纵蛋白质Hsp70和IRE1α之间的相互作用水平的方法。 特别地,本发明涉及操纵该相互作用以增加蛋白质产量的方法,以及操纵该相互作用的方法以便治疗与异常凋亡活性相关的疾病,包括癌症和自身免疫性疾病。

    Coated capsules and methods of making and using the same
    6.
    发明申请
    Coated capsules and methods of making and using the same 审中-公开
    涂层胶囊及其制造和使用方法

    公开(公告)号:US20070014847A1

    公开(公告)日:2007-01-18

    申请号:US11480574

    申请日:2006-07-05

    CPC classification number: A61K9/4816 A61K9/4891

    Abstract: The present invention relates to coated capsules with increased capsule shell pliability and resilience and methods of making the coated capsules. The present invention relates to methods of making coated capsules, the methods comprising applying a coating solution comprising sodium carboxymethylcellulose or sodium alginate to the exterior of a capsule to form a coating and drying the coating to produce a coated capsule.

    Abstract translation: 本发明涉及具有增加的胶囊壳柔韧性和弹性的涂覆胶囊以及制备涂覆胶囊的方法。 本发明涉及制备涂覆胶囊的方法,所述方法包括将包含羧甲基纤维素钠或藻酸钠的包衣溶液施用于胶囊的外部以形成包衣并干燥该包衣以产生涂覆的胶囊。

    Facilitation of multi-project management using threoughput measurement
    7.
    发明申请
    Facilitation of multi-project management using threoughput measurement 有权
    使用全面测量促进多项目管理

    公开(公告)号:US20060010418A1

    公开(公告)日:2006-01-12

    申请号:US11221447

    申请日:2005-09-07

    CPC classification number: G06Q10/06 G06Q10/0631

    Abstract: A method on a computer for providing critical chain-based project management is disclosed. The method includes generating a list of sequential time periods for a project comprising a plurality of tasks and calculating a number of tasks for each time period. The method further includes generating a graphic that visually indicates the number of tasks for each time period and a priority of each task and providing the graphic to a user.

    Abstract translation: 公开了一种计算机上提供关键链式项目管理的方法。 该方法包括生成包括多个任务并且计算每个时间段的任务数量的项目的连续时间段的列表。 该方法还包括生成图形,其可视地指示每个时间段的任务数量以及每个任务的优先级并将图形提供给用户。

    Activity based users' interests modeling for determining content relevance
    8.
    发明授权
    Activity based users' interests modeling for determining content relevance 有权
    基于活动的用户兴趣建模确定内容相关性

    公开(公告)号:US08612435B2

    公开(公告)日:2013-12-17

    申请号:US12504527

    申请日:2009-07-16

    CPC classification number: G06F17/30702 G06F17/30867 G06Q30/02

    Abstract: A method and apparatus for activity-based users' interests modeling for determining relevance of the content distributed to the users is provided. Modeling of the user's interests starts by collecting information about the actions that the user performed and about the contents that were associated with the actions. That information may be used to determine how much interest the user has had in the individual subjects up to date, and to determine which subjects became more or less important to the user over time. Further processing of the information about the interests of each of the individual users in a group of users may produce characteristics indicating the interests of the group as a whole. Additional processing may generate the information reflecting relative importance of the interests of an individual user in the group to the interests of other users in the same group.

    Abstract translation: 提供了一种用于基于活动的用户兴趣建模的方法和装置,用于确定分发给用户的内容的相关性。 对用户兴趣的建模首先是收集有关用户执行的操作的信息以及与操作相关联的内容。 该信息可以用于确定用户在最新的个体主题中具有多少兴趣,并且确定哪些对象随着时间对用户变得越来越重要。 关于用户组中每个用户的兴趣的信息的进一步处理可以产生表示整个组的兴趣的特征。 附加处理可以产生反映组中个别用户的兴趣的相对重要性的信息,以使同一组中的其他用户的兴趣。

    Facilitation of Multi-Project Management Using Critical Chain Methodology
    9.
    发明申请
    Facilitation of Multi-Project Management Using Critical Chain Methodology 审中-公开
    使用关键链方法促进多项目管理

    公开(公告)号:US20130096971A1

    公开(公告)日:2013-04-18

    申请号:US12710335

    申请日:2010-02-22

    CPC classification number: G06Q10/063114 G06Q10/06

    Abstract: A method on a computer for providing critical chain-based project management across a plurality of projects is disclosed. The method includes generating a plurality of plans, each of the plurality of plans corresponding to one of the plurality of projects, wherein a project comprises at least one task. The method further includes generating buffers for each of the plurality of projects and reconciling project resources among the plurality of projects. The method further includes executing the plurality of project plans, including allowing a user to manage the buffers across the plurality of projects. The user is further provided with information associated with buffers for the plurality of projects, so as to evaluate the status of the plurality of projects. Additionally, the user is provided with task prioritization for any task of the plurality of projects, wherein task prioritization is calculated across the plurality of projects.

    Abstract translation: 公开了一种用于在多个项目中提供关键的基于链的项目管理的计算机上的方法。 所述方法包括生成多个计划,所述多个计划中的每一个对应于所述多个项目之一,其中项目包括至少一个任务。 所述方法还包括为所述多个项目中的每一个生成缓冲器,并且在所述多个项目中调节项目资源。 该方法还包括执行多个项目计划,包括允许用户管理多个项目中的缓冲区。 还向用户提供与多个项目的缓冲器相关联的信息,以便评估多个项目的状态。 此外,向用户提供用于多个项目中的任何任务的任务优先级,其中在多个项目之间计算任务优先级。

    Facilitation of multi-project management using critical chain methodology
    10.
    发明授权
    Facilitation of multi-project management using critical chain methodology 有权
    使用关键链方法促进多项目管理

    公开(公告)号:US07669179B2

    公开(公告)日:2010-02-23

    申请号:US10700431

    申请日:2003-11-04

    CPC classification number: G06Q10/063114 G06Q10/06

    Abstract: A method on a computer for providing critical chain-based project management across a plurality of projects is disclosed. The method includes generating a plurality of plans, each of the plurality of plans corresponding to one of the plurality of projects, wherein a project comprises at least one task. The method further includes generating buffers for each of the plurality of projects and reconciling project resources among the plurality of projects. The method further includes executing the plurality of project plans, including allowing a user to manage the buffers across the plurality of projects. The user is further provided with information associated with buffers for the plurality of projects, so as to evaluate the status of the plurality of projects. Additionally, the user is provided with task prioritization for any task of the plurality of projects, wherein task prioritization is calculated across the plurality of projects.

    Abstract translation: 公开了一种用于在多个项目中提供关键的基于链的项目管理的计算机上的方法。 所述方法包括生成多个计划,所述多个计划中的每一个对应于所述多个项目之一,其中项目包括至少一个任务。 所述方法还包括为所述多个项目中的每一个生成缓冲器,并且在所述多个项目中调节项目资源。 该方法还包括执行多个项目计划,包括允许用户管理多个项目中的缓冲区。 还向用户提供与多个项目的缓冲器相关联的信息,以便评估多个项目的状态。 此外,向用户提供用于多个项目中的任何任务的任务优先级,其中在多个项目之间计算任务优先级。

Patent Agency Ranking