摘要:
A communications network gateway receives a stream of information formatted to be compatible with a first sub-network and it receives a stream of information formatted to be compatible with a second sub-network. The frames in the second stream are extracted and modified to be compatible with the transmission format of the first sub-network. The two streams of information are then aggregated for transmission over a logical network link in a manner that optimizes the bandwidth utilization of the overall communications network.
摘要:
A communications network gateway receives a stream of information formatted to be compatible with a first sub-network and it receives a stream of information formatted to be compatible with a second sub-network. The frames in the second stream are extracted and modified to be compatible with the transmission format of the first sub-network. The two streams of information are then aggregated for transmission over a logical network link in a manner that optimizes the bandwidth utilization of the overall communications network.
摘要:
Osteotomy tools and procedures are provided that include a sets of guides in which pins are placed through conduits in the guides with a close tolerance and into the bone at predetermined angles. One pin is placed at a correction angle subtending from one of a pair of parallel pins placed across an osteotomy site. After the osteotomy is completed, a bone correction is achieved by rotating the pin at the correction angle to be parallel to the one of the parallel pins located across the osteotomy site. A parallel pin guide is placed over these two pins to maintain the bone correction and stabilize the osteotomy, allowing fixation of the corrected bone segments.
摘要:
A mechanically stabilized earth (MSE) system includes a vertically oriented wall offset from an earthen feature, backfill disposed between the wall and the earthen feature, and a plurality of anchor elements attached at one end to the wall and extending from the wall toward the earthen feature. The plurality of anchor elements are embedded within the backfill and include an elongated strap having an attachment end configured for attachment to the MSE wall and opposite surfaces along the length thereof. The anchor element further includes a plurality of punched openings along the length of the strap, each opening including a punched tab projecting outward from one of the opposite surfaces.
摘要:
A sound barrier panel is providing having a concrete substrate and a noise attenuation layer forming a composite panel, in which the noise attenuation layer is formed of recycled shredded rubber and a binder.
摘要:
A surveillance system includes an event module that receives an event detection signal that indicates an event external to the surveillance system. The system also includes a power control module that selectively operates a data recording device at least partially concurrent with the event based on the event detection signal. The system also includes a selection module that selects a portion of data recorded by the data recording device based on content of the data. A data transmission module transmits the portion over a remote communication link.
摘要:
A method for planning a wellbore, the method including defining drilling data for drilling a segment of a planned wellbore and identifying a risk zone in the segment. Additionally, the method including determining an expected fluid loss for the risk zone and selecting a solution to reduce fluid loss in the risk zone. Furthermore, a method for treating drilling fluid loss at a drilling location, the method including calculating a drilling fluid loss rate at the drilling location, classifying the drilling fluid loss based on the drilling fluid loss rate, and selecting a solution based at least in part on the classifying.
摘要:
An enhanced playback method including receiving real time content from source links connected to a sources, simultaneously storing the real time content as stored content using a fault tolerant and load balancing method, aggregating the real time content and stored content from additional content, delivering content real time or stored in response to a user request from a user on a terminal system using a cut-through forwarding method.A content/service handling and delivery system including source input/output (I/O) links, a content handling subsystem, the content handling subsystem connected to the source input links, a service delivery subsystem connected to the content handling subsystem, an input and interaction subsystem connected to the service delivery subsystem and terminal I/O links, the plurality terminal I/O links connected to the service delivery subsystem.
摘要:
An improved methodology and systems for delivery of breathing gas such as for the treatment of obstructive sleep apnea through application of alternating high and low level positive airway pressure within the airway of the patient with the high and low airway pressure being coordinated with the spontaneous respiration of the patient, and improved methods and apparatus for triggering and for leak management in such systems.
摘要:
A temporary driveway for new home construction includes one or more removable pre-cast planks. The pre-cast planks are constructed of reinforced pre-cast concrete and are sized to accommodate the passage of vehicles over their surface. The reinforcement is in the form of a row of pre-stressed cables adjacent the top surface and the bottom surface of the plank. Four lift inserts are recessed into the top surface of the plank near each of the corners of the plank to balance the load during lifting. The pre-cast planks are lifted with a standard lifting rig such as a boom crane attached to the lift inserts. The pre-cast planks are transported to a construction site, lifted from the transport vehicle by a standard lifting rig, and placed in a desired location at a new home construction site. Several pre-cast planks are placed end-to-end to form the temporary driveway. When the temporary driveway is no longer needed, the pre-cast planks are lifted and transported away from the construction site.