Method Of Fracturing Multiple Zones Within A Well
    2.
    发明申请
    Method Of Fracturing Multiple Zones Within A Well 有权
    在井内压裂多个区域的方法

    公开(公告)号:US20130032350A1

    公开(公告)日:2013-02-07

    申请号:US13204392

    申请日:2011-08-05

    IPC分类号: E21B43/26

    CPC分类号: E21B43/26 E21B43/14

    摘要: A method of fracturing multiple zones within a wellbore formed in a subterranean formation is carried out by forming flow-through passages in two or more zones within the wellbore that are spaced apart from each other along the length of a portion of the wellbore. The flow-through passages within each zone have different characteristics provided by orienting the flow-through passages in directions in each of the two or more zones relative to a selected direction to provide differences in fracture initiation pressures within each of the two or more zones. A fracturing fluid is introduced into the wellbore in a fracturing treatment. The fracturing fluid in the fracturing treatment is provided at a pressure that is above the fracture initiation pressure of one of the two or more zones to facilitate fracturing of said one of two or more zones while remaining below the fracture initiation pressure of any other non-fractured zones of the two or more zones. The process is repeated for at least one or more non-fractured zones of the two or more zones.

    摘要翻译: 通过在井筒内的两个或更多个区域中形成沿着井眼的一部分的长度彼此分开的区域中的流通通道来进行在地下地层中形成的井眼内压裂多个区域的方法。 每个区域内的流通通道具有不同的特性,其特征在于通过在两个或多个区域中的每一个中相对于所选方向的方向定向流通通道,以提供两个或更多个区域的每个区域内的断裂起始压力的差异。 在压裂处理中将压裂液引入井眼。 压裂处理中的压裂液的压力高于两个或更多个区域之一的断裂开始压力,以促进两个或多个区域中的所述一个区域的压裂,同时保持在任何其他非区域的断裂起始压力以下, 两个或多个区域的断裂带。 对于两个或更多个区域的至少一个或多个非断裂区域重复该过程。

    Method of fracturing multiple zones within a well
    3.
    发明授权
    Method of fracturing multiple zones within a well 有权
    破裂井内多个区域的方法

    公开(公告)号:US09121272B2

    公开(公告)日:2015-09-01

    申请号:US13204392

    申请日:2011-08-05

    IPC分类号: E21B43/26 E21B43/14

    CPC分类号: E21B43/26 E21B43/14

    摘要: A method of fracturing multiple zones within a wellbore formed in a subterranean formation is carried out by forming flow-through passages in two or more zones within the wellbore that are spaced apart from each other along the length of a portion of the wellbore. The flow-through passages within each zone have different characteristics provided by orienting the flow-through passages in directions in each of the two or more zones relative to a selected direction to provide differences in fracture initiation pressures within each of the two or more zones. A fracturing fluid is introduced into the wellbore in a fracturing treatment. The fracturing fluid in the fracturing treatment is provided at a pressure that is above the fracture initiation pressure of one of the two or more zones to facilitate fracturing of said one of two or more zones while remaining below the fracture initiation pressure of any other non-fractured zones of the two or more zones. The process is repeated for at least one or more non-fractured zones of the two or more zones.

    摘要翻译: 通过在井筒内的两个或更多个区域中形成沿着井眼的一部分的长度彼此分开的区域中的流通通道来进行在地下地层中形成的井眼内压裂多个区域的方法。 每个区域内的流通通道具有不同的特性,其特征在于通过在两个或多个区域中的每一个中相对于所选方向的方向定向流通通道,以提供两个或更多个区域的每个区域内的断裂起始压力的差异。 在压裂处理中将压裂液引入井眼。 压裂处理中的压裂液的压力高于两个或更多个区域之一的断裂开始压力,以促进两个或多个区域中的所述一个区域的压裂,同时保持在任何其他非区域的断裂起始压力以下, 两个或多个区域的断裂带。 对于两个或更多个区域的至少一个或多个非断裂区域重复该过程。

    Method for single-stage treatment of siliceous subterranean formations
    5.
    发明授权
    Method for single-stage treatment of siliceous subterranean formations 有权
    硅质地层单层处理方法

    公开(公告)号:US08312929B2

    公开(公告)日:2012-11-20

    申请号:US12019394

    申请日:2008-01-24

    IPC分类号: E21B43/28

    CPC分类号: C09K8/74

    摘要: In a method of treating a sandstone-containing formation penetrated by a wellbore, a treatment fluid comprising an aqueous fluid containing a Bronsted acid, a hydrogen fluoride source and an organic acid or salt thereof that is substantially soluble in the aqueous fluid is formed. The treatment fluid contains less than about 2% of fluoride (F−) by weight of the fluid and from 2% or less of sodium (Na+) by weight of the fluid. The treatment fluid is introduced into the formation through the wellbore as a single-stage without introducing an acid-containing fluid preflush into the formation prior to introducing the treatment fluid.

    摘要翻译: 在处理由井眼渗透的含砂岩地层的方法中,形成包含基本上可溶于水性流体的含有布朗斯台德酸,氟化氢源及其有机酸或其盐的含水流体的处理流体。 处理液含有少于约2%的流体重量的氟化物(F-),和流体重量的2%或更少的钠(Na +)。 在引入处理流体之前,将处理流体作为单阶段通过井筒引入地层,而不将酸含量的流体预吹入地层中。

    Method for Single-Stage Treatment of Siliceous Subterranean Formations
    7.
    发明申请
    Method for Single-Stage Treatment of Siliceous Subterranean Formations 有权
    硅酸盐地层单阶段处理方法

    公开(公告)号:US20090192057A1

    公开(公告)日:2009-07-30

    申请号:US12053875

    申请日:2008-03-24

    IPC分类号: C09K8/86

    CPC分类号: C09K8/74

    摘要: In a method of treating a sandstone-containing formation penetrated by a wellbore, a treatment fluid comprising an aqueous fluid containing a Bronsted acid, a hydrogen fluoride source and an organic acid or salt thereof that is substantially soluble in the aqueous fluid is formed. The treatment fluid contains less than about 2% of fluoride (F−) by weight of the fluid and from 2% or less of sodium (Na+) by weight of the fluid. The treatment fluid is introduced into the formation through the wellbore as a single-stage without introducing an acid-containing fluid preflush into the formation prior to introducing the treatment fluid.

    摘要翻译: 在处理由井眼渗透的含砂岩地层的方法中,形成包含基本上可溶于水性流体的含有布朗斯台德酸,氟化氢源及其有机酸或其盐的含水流体的处理流体。 处理液含有少于约2%的流体重量的氟化物(F-),和流体重量的2%或更少的钠(Na +)。 在引入处理流体之前,将处理流体作为单阶段通过井筒引入地层,而不将酸含量的流体预吹入地层中。