PROCESS OPTIMIZATION METHOD AND SYSTEM FOR A POWER PLANT
    3.
    发明申请
    PROCESS OPTIMIZATION METHOD AND SYSTEM FOR A POWER PLANT 审中-公开
    电厂的过程优化方法和系统

    公开(公告)号:US20130006429A1

    公开(公告)日:2013-01-03

    申请号:US13540075

    申请日:2012-07-02

    IPC分类号: G06F1/26

    摘要: A method and system are disclosed for optimizing load scheduling for a power plant having one or more power generator units. An exemplary method and corresponding system can involve detecting an event indicative of a need for adapting one or more constraints for an objective function used in load scheduling. On such detection, the objective function is analysed to determine adaptive constraint values for the one or more constraints for optimally solving the objective function. These adaptive constraint values can be used to solve the objective function and the solution of the objective function with the one or more adapted constraint values can be used to operate the one or more power generation units of the power plant.

    摘要翻译: 公开了一种用于优化具有一个或多个发电机单元的发电厂的负载调度的方法和系统。 示例性方法和对应系统可以涉及检测表示需要适应用于负载调度中的目标函数的一个或多个约束的事件。 在这种检测中,分析目标函数以确定用于最佳地求解目标函数的一个或多个约束的自适应约束值。 这些自适应约束值可以用于解决目标函数,并且可以使用具有一个或多个适应约束值的目标函数的解来操作发电厂的一个或多个发电单元。