摘要:
Systems and methods for data center control are provided. The data center includes a plurality of racks and at least one cooling unit. The racks including at least one server. Information regarding the at least one cooling unit, the at least one server, the plurality of racks, and at least one application is received. A rack based cooling metric threshold is also received. The systems and methods can determine a layout of the data center that minimizes total power consumption of the plurality of racks and the cooling unit while maintaining cooling performance at an acceptable level based on the threshold.
摘要:
A system and method for evaluating equipment in an improper cluster in a data center, the equipment including a plurality of equipment racks, and at least one cooling provider. In one aspect, the method includes receiving data regarding each of the plurality of equipment racks and the at least one cooling provider, the data including a layout of the improper cluster of equipment racks and the at least one cooling provider, storing the received data, identifying at least one gap in the layout, determining cooling performance of at least one of the plurality of equipment racks based, at least in part, on characteristics of the at least one gap, and displaying the layout of the data center, wherein the layout includes an indication of the cooling performance of the at least one of the plurality of equipment racks.
摘要:
According to at least one embodiment, a computer-implemented method for modeling cooling performance is provided. The method includes acts of receiving, by a computer, input data from a storage device, the input data including data related to physical structures within at least one equipment rack, selecting, based on the data related to physical structures, at least one first equation of a plurality of predetermined equations that describe pressure values in a plurality of spaces within the at least one equipment rack, determining pressure values in identified spaces of the plurality of spaces by solving the at least one first equation using the input data, determining airflow values between identified spaces by calculating a difference between the pressure values and storing, on the storage device, the airflow values as equipment rack airflow values within the at least one equipment rack.
摘要:
A system and method is provided for evaluating the transient cooling performance of a data center. In one version, the method includes receiving input data from a storage device, the input data including data center architecture information and operating data, displaying a model of the data center, performing real-time transient cooling performance calculations for the data center using the input data, and displaying results of the real-time transient cooling performance calculations, wherein the results include a maximum predicted temperature of the data center following a power outage of the data center.
摘要:
Systems and methods provide determinations of airflow from a raised floor plenum. In one aspect, a computer-implemented method is provided for predicting airflow from a plurality of openings in a plenum. The method includes (A) receiving input data from a storage device, the input data including data related to the plenum (B) determining an average air pressure in the plenum, (C) determining an airflow value for each of the openings based on the average air pressure, (D) dividing the plenum into a plurality of grid cells, (E) using a first iterative method, determine a value for airflow velocity for each of the grid cells, (F) determining an air pressure value at each of the openings based on the airflow velocity, (G) using a second iterative method, determine a new airflow value for each one of the plurality of openings based on the air pressure value at the one of the openings, (H) determining whether a difference between the new airflow values and previous airflow values is greater than a threshold, and (I) repeating acts (E) through (H) until the difference is not greater than the threshold, and then storing the new airflow value for each one of the plurality of openings as a final airflow value.
摘要:
A system and method for evaluating equipment in a data center, the equipment including a plurality of equipment racks, and at least one cooling provider. In one aspect, a method includes receiving data regarding each of the plurality of equipment racks and the at least one cooling provider, the data including a layout of the equipment racks and the at least one cooling provider, and a power draw value for each of the equipment racks, storing the received data, determining air flow between the at least one cooling provider and each of the equipment racks, determining inlet and exit air temperature for the at least one cooling provider based on the layout, the power draw and the airflow, for each equipment rack, determining inlet and exit air temperature based on the layout, the power draw and the airflow, and displaying an indication of the inlet and exit temperature for each of the plurality of equipment racks and the at least one cooler. In the method, determining the inlet and exit temperature of each of the equipment racks and the at least one cooling provider includes establishing a set of S coupled equations, with S equal to a number of temperature values to be determined, and solving the S coupled equations.
摘要:
A system and method for providing energy assessment and optimization in a data center that includes at least one cooling provider, and at least one cooling consumer, the at least one cooling consumer having cooling requirements. The method according to one aspect includes receiving data regarding cooling availability and power consumption for the at least one cooling consumer, cooling capacity of the at least one cooling provider, and a physical relationship between the at least one cooling consumer and the at least one cooling provider in the data center, storing the received data, determining airflow distribution effectiveness between the at least one cooling consumer and the at least one cooling provider, and displaying at least one value representative of the effectiveness of the distribution of airflow in the data center between the at least one cooling consumer and the at least one cooling provider.
摘要:
A system and method for providing energy assessment and optimization in a data center that includes at least one cooling provider, and at least one cooling consumer, the at least one cooling consumer having cooling requirements. The method according to one aspect includes receiving data regarding cooling availability and power consumption for the at least one cooling consumer, cooling capacity of the at least one cooling provider, and a physical relationship between the at least one cooling consumer and the at least one cooling provider in the data center, storing the received data, determining airflow distribution effectiveness between the at least one cooling consumer and the at least one cooling provider, and displaying at least one value representative of the effectiveness of the distribution of airflow in the data center between the at least one cooling consumer and the at least one cooling provider.
摘要:
A system and method for evaluating equipment in a data center, the equipment including a plurality of equipment racks, and at least one cooling provider. In one aspect, a method includes receiving data regarding each of the plurality of equipment racks and the at least one cooling provider, the data including a layout of the equipment racks and the at least one cooling provider, and a power draw value for each of the equipment racks, storing the received data, determining air flow between the at least one cooling provider and each of the equipment racks, determining inlet and exit air temperature for the at least one cooling provider based on the layout, the power draw and the airflow, and for each equipment rack, determining inlet and exit air temperature based on the layout, the power draw and the airflow.
摘要:
Aspects of the invention are directed to systems and methods for designing and analyzing data centers. One aspect is directed to a method of determining cooling characteristics of a data center. The method includes receiving data related to a configuration of equipment in the data center, identifying rack clusters in the configuration of equipment, and determining a cooling metric for at least one equipment rack of at least one rack cluster.