摘要:
A system, method and computer program product for predicting a failure of equipment from prior maintenance data of the equipment collected during a time duration estimate a number of preceding failures of the equipment prior to the time duration. The system, method and computer program product construct a model, based on the prior maintenance data, of an impact of an external intervention on a failure of the equipment. The system, method and computer program product construct a model, based on the constructed model of the impact of the external intervention and the estimated number of preceding failures, a replacement policy of the equipment and a probability of a subsequent failure of the equipment in a subsequent time period.
摘要:
A system for predicting a failure of equipment from prior maintenance data of the equipment collected during a time duration estimate a number of preceding failures of the equipment prior to the time duration. The system constructs a model, based on the prior maintenance data, of an impact of an external intervention on a failure of the equipment. The system constructs a model, based on the constructed model of the impact of the external intervention and the estimated number of preceding failures, of a replacement policy of the equipment and a probability of a subsequent failure of the equipment in a subsequent time period.
摘要:
A system for predicting a failure of equipment from prior maintenance data of the equipment collected during a time duration estimate a number of preceding failures of the equipment prior to the time duration. The system constructs a model, based on the prior maintenance data, of an impact of an external intervention on a failure of the equipment. The system constructs a model, based on the constructed model of the impact of the external intervention and the estimated number of preceding failures, of a replacement policy of the equipment and a probability of a subsequent failure of the equipment in a subsequent time period.
摘要:
A system, method and computer program product for predicting a failure of equipment from prior maintenance data of the equipment collected during a time duration estimate a number of preceding failures of the equipment prior to the time duration. The system, method and computer program product construct a model, based on the prior maintenance data, of an impact of an external intervention on a failure of the equipment. The system, method and computer program product construct a model, based on the constructed model of the impact of the external intervention and the estimated number of preceding failures, a replacement policy of the equipment and a probability of a subsequent failure of the equipment in a subsequent time period.
摘要:
A system, method and computer program product for maintaining an infrastructure of components. The system receives structured data, unstructured data, and infrastructure data from a database. The system runs at least one statistical and optimization modeler with one or more of: the received structured data, the received unstructured data and the received infrastructure data, in order to calculate a health index of at least one component of the infrastructure. The health index represents a health attribute of the at least one component. The system establishes at least one maintenance plan of the infrastructure, based on the calculated health index. Each established maintenance plan is associated with at least one health index. The system compares health indices of the at least one established maintenance plan. The system selects a plan, among the at least one established maintenance plan, whose health index is a maximum among the compared health indices.
摘要:
A method for run-to-run control and sampling optimization in a semiconductor manufacturing process includes the steps of: determining a process output and corresponding metrology error associated with an actual metrology for a current processing run in the semiconductor manufacturing process; determining a predicted process output and corresponding prediction error associated with a virtual metrology for the current processing run; and controlling at least one parameter corresponding to a subsequent processing run as a function of the metrology error and the prediction error.
摘要:
A method for run-to-run control and sampling optimization in a semiconductor manufacturing process includes the steps of: determining a process output and corresponding metrology error associated with an actual metrology for a current processing run in the semiconductor manufacturing process; determining a predicted process output and corresponding prediction error associated with a virtual metrology for the current processing run; and controlling at least one parameter corresponding to a subsequent processing run as a function of the metrology error and the prediction error.
摘要:
A system, method and computer program product for maintaining an infrastructure of components. The system receives structured data, unstructured data, and infrastructure data from a database. The system runs at least one statistical and optimization modeler with one or more of: the received structured data, the received unstructured data and the received infrastructure data, in order to calculate a health index of at least one component of the infrastructure. The health index represents a health attribute of the at least one component. The system establishes at least one maintenance plan of the infrastructure, based on the calculated health index. Each established maintenance plan is associated with at least one health index. The system compares health indices of the at least one established maintenance plan. The system selects a plan, among the at least one established maintenance plan, whose health index is a maximum among the compared health indices.
摘要:
A system and method of determining performance metrics for inclusion in a Service Level Agreement (SLA) between a customer and a host computing service provider. The method comprises: receiving a provisioning request from a customer including receiving computing performance requirement parameters and environmental parameters for inclusion in the SLA from the customer; deploying discovery tools to identify relevant infrastructure components based on performance metrics. Based on identification of the customer's relevant infrastructure components, probes are deployed and installed. Then, data is obtained from the probes while changing infrastructure components for simulating and assessing impact of one or more different customer scenarios for different performance policies. In one aspect, the obtained data is used to identify and implement an a priori risk sharing agreement between the customer and service provider. In a further aspect, the data obtained for simulating and assessing impact of one or more different customer policies include data for simulating and assessing different environmental policies.
摘要:
A system and method is disclosed for assessing a probability of failure of operation of a semiconductor wafer. The method includes inputting risk factor data into a memory and inputting a plurality of wafers into a semiconductor fabrication manufacturing process. A subset of wafers is selected to obtain a sample population and at least one region of each wafer of the sample population is inspected. Circuit design data associated with each wafer of the sample population is obtained and one or more defects that present an increased risk to the operation of a particular wafer are identified. The identification is a function of the risk factor data, the inspecting step and the circuit design data. A probability of semiconductor wafer failure is calculated.