Method of spot welding aluminum alloys
    1.
    发明授权
    Method of spot welding aluminum alloys 失效
    铝合金点焊方法

    公开(公告)号:US5391854A

    公开(公告)日:1995-02-21

    申请号:US167034

    申请日:1993-12-16

    摘要: A method of spot welding aluminum alloy workpieces having electrical conductivity of 18.about.57% IACS and Vickers hardness of 26.about.200 is disclosed. The aluminum alloy workpieces are spot welded by a pair of welding electrodes having an electrical conductivity of not less than 92% IACS and a Vickers hardness of 50.about.130. The differences of the electrical conductivity and Vickers hardness between the welding electrodes and the aluminum alloy workpieces are in a range of 41.about.87% IACS and not larger than 99, respectively.

    摘要翻译: 公开了一种具有导电率为18分辨率57%IACS和维氏硬度为26DIFFERENCE 200的铝合金工件点焊方法。 铝合金工件通过一对电导率不低于92%IACS和维氏硬度为50差的焊接电极点焊。焊接电极和铝合金之间的导电性和维氏硬度差异 工件分别在41差异87%IACS和不大于99的范围内。

    Process of fixing internally titanium-lined doubled-walled tubing
structure to titanium tube sheet
    5.
    发明授权
    Process of fixing internally titanium-lined doubled-walled tubing structure to titanium tube sheet 失效
    将钛内衬的双层管结构固定在钛管板上的工艺

    公开(公告)号:US4949895A

    公开(公告)日:1990-08-21

    申请号:US695048

    申请日:1985-01-25

    CPC分类号: F16L41/084 F16L9/02

    摘要: A process of fixing a double-walled tubing structure to a titanium tube sheet, the tubing structure comprising a non-titanium outer tube and a titanium inner lining tube, comprising the steps of: pressure-welding a titanium collar to an end face of the outer tube to form an integral titanium end portion at one end of the outer tube; inserting the titanium lining tube in the outer tube and fixing the titanium lining tube to the outer tube in pressed contact with the inner surface of the outer tube to form the titanium-lined double-walled tubing structure; and inserting an end section of the tubing structure in a hole in the tube sheet, and welding the titanium end portion of the outer tube and an end portion of the lining tube to the tube sheet. Instead of the titanium collar being directly welded to the outer tube, an auxiliary collar made of a metal material for sound welding to the outer tube may be pressure-welded at its one end to the titanium collar, and fusion-welded at the other end to the outer tube. In either case, the titanium end portion of the internally titanium-lined double-walled tubing structure is positioned in the hole and welded to the tube sheet.

    摘要翻译: 将双壁管结构固定在钛管片上的方法,所述管结构包括非钛外管和钛内衬管,所述方法包括以下步骤:将钛套环压焊到所述钛管的端面 外管,以在外管的一端形成整体的钛端部; 将钛衬管插入外管,并将钛衬管固定在与外管内表面压接的外管上,形成钛衬双壁管结构; 并且将管结构的端部插入管板的孔中,并且将外管的钛端部和衬管的端部焊接到管板。 代替钛合金轴环直接焊接到外管,由金属材料制成的用于对外管进行声音焊接的辅助轴环可以在其一端被压焊到钛套环上,并在另一端熔焊 到外管。 在任一情况下,内钛基双层管结构的钛端部定位在孔中并焊接到管板。