Covering for waste depositories
    1.
    发明授权
    Covering for waste depositories 失效
    覆盖废物存放处

    公开(公告)号:US4768897A

    公开(公告)日:1988-09-06

    申请号:US805821

    申请日:1985-12-06

    IPC分类号: B09B1/00 E02D31/00

    摘要: A multilayer plate for use in covering waste depositories comprises at least one drainage layer and a filter stabilization layer, the drainage layer serving to facilitate or enable the removal of water seeping downwardly from the surface of the depository covering or gases rising from the depository body. The filter stabilization layer comprises a fabric web, while the drainage layer includes a plastic grid. The plate is prefabricated and is of sufficient flexibility to be wound upon a roll for transport to a depository site. In one form, the prefabricated plate also includes a synthetic resin barrier layer which, upon installation of the plate, blocks the passage of water from above and the passage of gases from below.

    摘要翻译: 用于覆盖废物储存器的多层板包括至少一个排水层和过滤器稳定层,排水层用于促进或使得能够从存放层覆盖物的表面或从储存体上升的气体向下渗出水。 过滤器稳定层包括织物网,而排水层包括塑料网格。 板材是预制的,并且具有足够的柔韧性以卷绕在卷上以运输到托盘位置。 在一种形式中,预制板还包括合成树脂阻挡层,其在板的安装时阻止水从上方通过并从下方通过气体。

    Driving shield
    4.
    发明授权
    Driving shield 失效
    驾驶盾牌

    公开(公告)号:US4368924A

    公开(公告)日:1983-01-18

    申请号:US256813

    申请日:1981-04-23

    IPC分类号: E21D9/06 E21D9/08 E21D9/13

    摘要: A driving shield having a shield shell and a transverse wall for defining a work chamber, and a removal arm pivotally journalled on the transverse wall. The removal arm has a removal tool for mining or removing a face wall which also delimits the work chamber. A pressure medium supply is provided for attaining a support pressure in the work chamber. Material worked away from the face wall is removed by a discharge conduit arranged essentially along the bottom of the shield shell. The work or material-removing arm is journalled on the transverse wall in the pneumatic pressure duct, and the pressure medium supply is embodied as a pneumatic conduit. A sealing medium application device is movably coupled with the work arm, and the delivery nozzle of the device is directed upon the immediate surroundings at the free end of the removal tool.

    摘要翻译: 具有屏蔽壳和用于限定工作室的横向壁的驱动屏蔽件,以及可枢转地支承在横向壁上的移除臂。 移除臂具有用于挖掘或移除也限定工作室的面壁的移除工具。 提供压力介质供应以在工作室中获得支撑压力。 通过基本上沿屏蔽壳的底部布置的排放导管去除远离面壁的材料。 工作或材料去除臂被轴颈安装在气动压力管道的横向壁上,压力介质供应体现为气动导管。 密封介质施加装置可与工作臂可移动地联接,并且装置的输送喷嘴在移除工具的自由端处被引导到紧邻环境。

    Transport installation for a production line having parallel-arranged
processing stations
    6.
    发明授权
    Transport installation for a production line having parallel-arranged processing stations 失效
    具有平行布置加工站的生产线的运输安装

    公开(公告)号:US4718533A

    公开(公告)日:1988-01-12

    申请号:US905233

    申请日:1986-09-09

    摘要: A production line for the manufacture of electric parts includes a conveyor belt and a plurality of parallel-arranged processing stations disposed along the belt. Workpiece carriers are transported by the belt. Each processing station includes a lifting mechanism which lifts at least one carrier from the belt for further handling, while leaving the belt unobstructed so that subsequent carriers can be conveyed beneath the lifted carrier. A gripper inserts workpieces onto the raised carrier and/or removes workpieces from the raised carrier. Movable stops are positioned upstream of the lifting mechanism to stop a subsequent carrier as the lifted carrier is lowered back onto the belt.

    摘要翻译: 用于制造电气部件的生产线包括输送带和沿着带设置的多个平行排列的处理站。 工件托架由皮带运输。 每个处理站包括提升机构,该提升机构从皮带提升至少一个载体以用于进一步处理,同时使带不受阻碍地使得后续载体能够在提升的载体下方传送。 夹具将工件插入凸起的托架上和/或从升高的托架上移除工件。 可移动止动件位于提升机构的上游,以便随着升起的托架降回到皮带上而停止随后的托架。

    Method for fabricating slotted walls with built-in thin-walled sealing
elements
    7.
    发明授权
    Method for fabricating slotted walls with built-in thin-walled sealing elements 失效
    用于制造具有内置薄壁密封元件的开槽壁的方法

    公开(公告)号:US4673316A

    公开(公告)日:1987-06-16

    申请号:US806109

    申请日:1985-12-06

    IPC分类号: E02D19/18 E02D5/20

    CPC分类号: E02D19/18

    摘要: A method for installing thin-walled sealing elements in the fabrication of slotted walls in the soil. The thin-walled sealing elements are plastic foils with vertical connecting elements at the vertical edges. A connecting slot is flushed out between a newly made slotted-wall section and the interior of the adjacent slotted connecting tube of the previously installed sealing element. The slot and the interior of the connecting tube are filled with a support suspension. Then a new sealing element is threaded through the filled connecting slot into the previously installed connecting tube.

    摘要翻译: 一种用于在土壤中开槽壁的制造中安装薄壁密封元件的方法。 薄壁密封元件是在垂直边缘具有垂直连接元件的塑料箔。 连接槽在新制作的开槽壁部分和先前安装的密封元件的相邻开槽连接管的内部之间被冲出。 连接管的槽和内部填充有支撑悬架。 然后,新的密封元件穿过填充的连接槽进入先前安装的连接管。

    Methods and apparatus for the automatic production of stators for
electric motors
    8.
    发明授权
    Methods and apparatus for the automatic production of stators for electric motors 失效
    自动生产电动机定子的方法和装置

    公开(公告)号:US4679312A

    公开(公告)日:1987-07-14

    申请号:US825908

    申请日:1986-02-04

    IPC分类号: H02K15/00 H02K15/06

    摘要: Stators are produced by advancing stator workpieces successively to a plurality of work stations. The stators are mounted in holders which each comprises a pair of downwardly depending legs resting on a pair of horizontally spaced conveyor belts. The belts are continuously driven to advance the holders to the work stations. At each station the holder is restrained from movement (e.g., by being lifted off the belts) while the belts continue to be driven. At a winding station, upper and lower winding forms are advanced toward a stator workpiece, the lower form passing between said belts and legs.

    摘要翻译: 定子是通过将定子工件连续前进到多个工位而产生的。 定子安装在保持器中,每个定位器包括搁置在一对水平间隔的传送带上的一对向下悬置的腿。 皮带被连续地驱动以将保持器推进到工作站。 在每个车站,当皮带继续被驱动时,保持器被限制(例如通过被带离开)。 在卷绕站处,上下绕组形式朝向定子工件前进,下表面通过所述带和腿之间。

    Plug connection for planar barrier webs
    9.
    发明授权
    Plug connection for planar barrier webs 失效
    平面阻挡网的插头连接

    公开(公告)号:US4671705A

    公开(公告)日:1987-06-09

    申请号:US784169

    申请日:1985-10-04

    IPC分类号: E02D19/18 E02D5/20 E02D29/00

    CPC分类号: E02D19/18 E02D19/185

    摘要: A pair of webs each extending over a large area and disposed in a vertical orientation in a suspension are interconnected by a pair of telescoping tubes attached to juxtaposed edges of the respective barrier webs. Material of the suspension is removed from the space within the inner tube to provide a hydraulic trap for liquid entering the connection or coupling between the two tubes. A device is provided for inspecting the level of the liquid collected in the hydraulic trap or for removing the collected liquid. The barrier webs are advantageously made of synthetic resin material such as high-density polyethylene.

    摘要翻译: 一对腹板各自在大面积上延伸并以垂直方向设置在悬架中,通过一对伸缩管相互连接,所述一对伸缩管连接到相应阻挡幅材的并列边缘。 将悬浮液的材料从内管中的空间移除,以提供用于进入两管之间的连接或联接的液体的液压捕集器。 提供了一种用于检查在液压捕集器中收集的液体的液位或用于去除收集的液体的装置。 阻隔纤维网有利地由合成树脂材料如高密度聚乙烯制成。

    Apparatus for the feeding and removal of workpieces to and from work
stations coupled in parallel
    10.
    发明授权
    Apparatus for the feeding and removal of workpieces to and from work stations coupled in parallel 失效
    用于将工件进给和移出工作站并联的装置

    公开(公告)号:US4483433A

    公开(公告)日:1984-11-20

    申请号:US339083

    申请日:1982-01-13

    IPC分类号: B23Q7/14 H02K15/095 B65G47/00

    CPC分类号: B23Q7/1421 H02K15/095

    摘要: Apparatus for feeding and removing work pieces to and from first and second work stations coupled in parallel comprises first and second transporters for transporting work pieces to and from the first and second work stations, respectively; and a transfer system for each of the work stations for transferring work pieces from the first transporter to the corresponding work station and from the corresponding work station to the second transporter. Each of the transfer systems comprises a displaceable work piece receiver disposed in a first position thereof in alignment with the first and second transporter such that work pieces being transported by the transporters can pass through the work piece receiver.

    摘要翻译: 用于向并联并联的第一工作站和第二工作站进给和移除工件的装置包括用于分别将工件运送到第一工作站和从第一工作站和从第一工作站传送工件的第一和第二转运器; 以及用于每个工作站的传送系统,用于将工件从第一运送器传送到相应的工作站,并且从相应的工作站传送到第二运送器。 每个传送系统包括位于其第一位置的可移动工件接收器,其与第一和第二传送器对准,使得由传送器传送的工件可以穿过工件接收器。