公开(公告)号:US20190064784A1
公开(公告)日:2019-02-28
申请号:US16106224
申请日:2018-08-21
Inventor: ISATO IWATA , TAKUYA YAMAZAKI , NAOFUMI IKUTA , HIROKI SAGARA
IPC: G05B19/418
Abstract: A production system includes a production line for producing a product by connecting a plurality of production facilities having working units for doing work on a transported workpiece; a gap time calculator that calculates a plurality of gap times respectively corresponding to the plurality of the production facilities until a next workpiece is transported from an upstream production facility to each of the plurality of the production facilities based on a production status of each of the plurality of the production facilities; and a preparation operation determination unit that determines an automatic preparation operation capable of being executed in each of the plurality of the production facilities based on the plurality of the gap times. Each of the plurality of the production facilities executes the determined automatic preparation operation.
-
公开(公告)号:US20180150065A1
公开(公告)日:2018-05-31
申请号:US15814898
申请日:2017-11-16
Inventor: TAKUYA YAMAZAKI , HIROKAZU TAKEHARA
IPC: G05B19/418 , G06F9/50 , G06Q10/06
Abstract: A component mounting system includes a plurality of component mounting lines, and in the production of predetermined mounting boards, determines an allocation of workers to work which arises in each of the plurality of component mounting lines such that production completion times of the plurality of component mounting lines become sooner.
-
公开(公告)号:US20180089860A1
公开(公告)日:2018-03-29
申请号:US15705788
申请日:2017-09-15
Inventor: NAOFUMI IKUTA , TAKUYA YAMAZAKI , HIROKI SAGARA , ISATO IWATA
CPC classification number: G06T11/00 , G02B27/0172 , G02B2027/0138 , G02B2027/014 , G02B2027/0178 , G06K9/00577 , G06K9/00671 , G06K9/6201 , G06Q10/08 , G06T7/73 , G06T2207/20212 , G06T2207/30164 , H04N5/232
Abstract: There is provided a component management support system which supports put-in and out of a component to and from a component storage place, the system including a imaging unit that images information; a support information display processor that generates a superimposed composite image by superimposing the support information for supporting the put-in and out of the component to and from the component storage place on an image obtained by imaging the component storage place or a field of view of the worker; and a display that displays the superimposed composite image.
-
公开(公告)号:US20180086592A1
公开(公告)日:2018-03-29
申请号:US15705706
申请日:2017-09-15
Inventor: NAOFUMI IKUTA , TAKUYA YAMAZAKI , HIROKI SAGARA , ISATO IWATA
Abstract: A feeder arrangement support system for supporting an arrangement of a feeder on a feeder arrangement unit includes a imaging unit that images information, a processor that superimposes arrangement support information for supporting the feeder arrangement on the feeder arrangement unit on an image obtained by imaging the feeder arrangement unit or a field of view of a worker, to generate a superimposed composite image, and a display that displays the superimposed composite image.
-
公开(公告)号:US20220174851A1
公开(公告)日:2022-06-02
申请号:US17441242
申请日:2020-01-06
Inventor: EIJI SHIGAKI , TAICHI SHIMIZU , TAKAAKI YOKOI , TAKUYA YAMAZAKI
IPC: H05K13/08 , G06F3/0484 , G05B19/418 , H05K13/04
Abstract: A production data creation device includes an input unit and a setting unit. The input unit receives an input of one application from among a plurality of applications displayed on a screen. The setting unit sets one or more operation parameters used by a component mounter to mount a component on a board, on the basis of the input application.
-
公开(公告)号:US20200089201A1
公开(公告)日:2020-03-19
申请号:US16688194
申请日:2019-11-19
Inventor: KAZUYOSHI HARADA , TAKUYA YAMAZAKI , ATSUSHI NAKAZONO , HIROSHI ANDO
IPC: G05B19/418 , G01D7/00 , H05K13/08
Abstract: A component mounting system includes a component mounting line, a storage device, and a display device. The component mounting line is formed by connecting a plurality of mounting board manufacturing machines. The storage device is connected to the component mounting line via a network to acquire information from each of the plurality of mounting board manufacturing machines. The display device is connected to the storage device via the network and displays a progress status of set-up work executed when changing a type of a mounting board manufactured by the component mounting line based on information stored in the storage device.
-
公开(公告)号:US20180364687A1
公开(公告)日:2018-12-20
申请号:US15992259
申请日:2018-05-30
Inventor: INLIN TAN , TAKUYA YAMAZAKI , TAKAAKI YOKOI , NARUMI ATSUTA , ATSUSHI NAKAZONO
IPC: G05B19/418
Abstract: A mounting board manufacturing system includes a component placing device; a library; an operation information counter; and a corrector. The component data includes a control parameter for executing the component placing work by the component placing device, and information regarding the component. The operation information counter counts a score of the component placing work for each component data based on operation information including a result executed by the component placing device. The corrector selects correction component data that is a target to be corrected from a plurality of the component data based on the score and corrects the control parameter of the correction component data.
-
公开(公告)号:US20180077830A1
公开(公告)日:2018-03-15
申请号:US15643723
申请日:2017-07-07
Inventor: KENICHIRO ISHIMOTO , TAKUYA YAMAZAKI , TADASHI ENDO
CPC classification number: H05K13/04 , H05K13/0857
Abstract: A component mounting system includes at least one component mounter that is provided with a first board transport mechanism, a second board transport mechanism, a first mounting mechanism and a second mounting mechanism that mount components on a board, and a plurality of carriages that is respectively installed on the side of the first board transport mechanism and on the side of the second board transport mechanism and holds a plurality of tape feeders (component supply devices). When changing a production board type of a first board transported by the first board transport mechanism, the components are supplied from the component supply device held by a first carriage, a second carriage, and a third carriage, and the components are mounted on a second board that does not change the production board type by the first mounting mechanism and the second mounting mechanism.
-
公开(公告)号:US20180206372A1
公开(公告)日:2018-07-19
申请号:US15866703
申请日:2018-01-10
Inventor: TAKUYA YAMAZAKI , ATSUSHI NAKAZONO , HIROSHI ANDO , KAZUYOSHI HARADA
CPC classification number: H05K13/08 , B23K2101/42 , G06Q50/04 , H05K13/085 , Y02P90/30
Abstract: A group determination method includes an external set-up work time calculation step of calculating an external set-up work time for an external set-up work by which a component supplier used in a group that is a next production target of a group under production in a component mounting line, including a plurality of the component mounters capable of attaching and detaching a component supply carriage which can arrange a plurality of the component suppliers (tape feeders), is removed from the component mounting line and arranged in the component supply carriage; and a production completion time calculation step of calculating a production completion time at which the production of all the mounting boards that are the production targets is completed in consideration of the external set-up work time. A plurality of groups which are common in an arrangement of component suppliers of a plurality of types of the mounting boards that are the production targets are determined so that production completion time is shortened.
-
公开(公告)号:US20180203436A1
公开(公告)日:2018-07-19
申请号:US15865526
申请日:2018-01-09
Inventor: TAKUYA YAMAZAKI , ATSUSHI NAKAZONO , HIROSHI ANDO , KAZUYOSHI HARADA
IPC: G05B19/418
CPC classification number: G05B19/4183 , G05B19/41865 , G05B2219/32361 , Y02P90/02 , Y02P90/04
Abstract: In two component mounting lines or more each including the plurality of the component mounters, a set-up changing work time, necessary for executing set-up changing work in the two component mounting lines or more based on the number of workers assigned for production in the two component mounting lines or more in each time zone, and the number of workers necessary for the set-up changing work necessary when the mounting board is changed in the two component mounting lines or more, is calculated; and a production completion time, which includes a set-up changing work time and at which the production of all the mounting boards that are the production targets is completed, is calculated; and a group is determined so that the production completion time is shortened within a predetermined time period in the two component mounting lines or more.
-
-
-
-
-
-
-
-
-