-
公开(公告)号:US20250084751A1
公开(公告)日:2025-03-13
申请号:US18827082
申请日:2024-09-06
Applicant: Schlumberger Technology Corporation
Inventor: Carlos Urdaneta , Cheolkyun Jeong , Shunfeng Zheng
Abstract: A method for generating synthetic sensor data during a drill operation includes training an artificial intelligence based backup sensor model, deploying the trained backup sensor model at a drilling location, and evaluating sensor data acquired from a plurality of sensors while drilling with the trained backup sensor model to synthesize backup sensor data.
-
公开(公告)号:US20240426183A1
公开(公告)日:2024-12-26
申请号:US18752408
申请日:2024-06-24
Applicant: Schlumberger Technology Corporation
Inventor: Shunfeng Zheng , Jeremy Murphy , Fei Song , Ke Ken Li
Abstract: Systems and methods presented herein facilitate coiled tubing operations, and generally relate to reduction of shock and vibrations to portions of the coiled tubing string. A device includes a first end configured to be disposed downstream of a bottom hole assembly of a coiled tubing drilling string; a second end configured to be disposed downstream of the first end and upstream of a drive of the coiled tubing drilling string; and a moveable valve configured to move from a first position to a second position to divert at least a portion of drilling fluid flow away from the drive when the drilling fluid flow is greater than a preset flow value or a weight on bit is less than a preset weight value and thereby reduce a rotation rate of the drive.
-
公开(公告)号:US20240318525A1
公开(公告)日:2024-09-26
申请号:US18732235
申请日:2024-06-03
Applicant: SCHLUMBERGER TECHNOLOGY CORPORATION
Inventor: Jacques Orban , Shunfeng Zheng , Bartley Patton , Eric Erickson
CPC classification number: E21B33/13 , B28C7/0418 , B28C9/004
Abstract: Embodiments disclosed provide a pump assembly including a first pump for delivering at least one fluid. The first pump may include a first inlet coupled to the first pump for delivering at least one first fluid to the first pump, a second inlet coupled to the first pump for delivering at least one second fluid to the first pump, a first discharge coupled to the first pump for delivering the at least one first fluid at a first pressure, and a second discharge coupled to the first pump for delivering the at least one second fluid at a second pressure. In some embodiments, the first discharge and the second discharge are isolated from each other.
-
公开(公告)号:US20230417133A1
公开(公告)日:2023-12-28
申请号:US18466862
申请日:2023-09-14
Applicant: Schlumberger Technology Corporation
Inventor: Njaal Aarsland , Shunfeng Zheng , Anstein Jorud , Jason Bryant , Loic Hoarau
Abstract: A method and system that include receiving sensor data that is indicative of an operational status of a well construction equipment that is being utilized to construct a planned well that include receiving a well construction plan that includes information that is indicative of the planned well and the well construction equipment. The method and system additionally include accessing a database of operational sequences that are executable to be performed by the well construction equipment to construct a plurality of wells and selecting from the database an operational sequence to construct the planned well. The method and system further include electronically controlling the well construction equipment to autonomously perform the plurality of physical or mechanical operations of the selected operational sequence to drill at least one of: a selected portion of the planned well and a path along the selected portion of the planned well through a subterranean formation.
-
公开(公告)号:US11788399B2
公开(公告)日:2023-10-17
申请号:US17812184
申请日:2022-07-13
Applicant: Schlumberger Technology Corporation
Inventor: Njaal Aarsland , Shunfeng Zheng , Anstein Jorud , Jason Bryant , Loic Hoarau
Abstract: A supervisory control system for a well construction rig operable to perform well construction operations to construct a planned well at a wellsite. The supervisory control system may be installable in association with the well construction rig. The supervisory control system may comprise a supervisory controller communicatively connectable with a central controller of a rig control system of the well construction rig. The rig control system may be communicatively connected with and operable to control well construction equipment of the well construction rig. The supervisory controller may be operable to control the well construction equipment via the rig control system to cause the well construction equipment to perform the well construction operations. The central controller may be operable as an I/O interface for matching inputs and outputs of the supervisory controller with corresponding inputs and outputs of at least one piece of the well construction equipment.
-
公开(公告)号:US11697986B2
公开(公告)日:2023-07-11
申请号:US17012417
申请日:2020-09-04
Applicant: Schlumberger Technology Corporation
Inventor: Shunfeng Zheng
CPC classification number: E21B44/00 , H02J13/00001 , H02J13/00002
Abstract: Apparatus and methods for managing power at a wellsite. An example apparatus may include a well construction equipment operable to construct a well at the wellsite, a power supply system operable to output electrical power to the well construction equipment to facilitate operation of the well construction equipment, and a control system for controlling the well construction system. The control system may be operable to store a digital drilling program and cause the well construction equipment to perform planned well construction operations based on the digital drilling program. The digital drilling program may include an equipment operational plan indicative of the planned well construction operations to be performed by the well construction equipment to construct the well, and an electrical power plan indicative of a planned electrical power demand of the well construction equipment to perform the planned well construction operations.
-
公开(公告)号:US20220074297A1
公开(公告)日:2022-03-10
申请号:US17012417
申请日:2020-09-04
Applicant: Schlumberger Technology Corporation
Inventor: Shunfeng Zheng
Abstract: Apparatus and methods for managing power at a wellsite. An example apparatus may include a well construction equipment operable to construct a well at the wellsite, a power supply system operable to output electrical power to the well construction equipment to facilitate operation of the well construction equipment, and a control system for controlling the well construction system. The control system may be operable to store a digital drilling program and cause the well construction equipment to perform planned well construction operations based on the digital drilling program. The digital drilling program may include an equipment operational plan indicative of the planned well construction operations to be performed by the well construction equipment to construct the well, and an electrical power plan indicative of a planned electrical power demand of the well construction equipment to perform the planned well construction operations.
-
公开(公告)号:US11261724B2
公开(公告)日:2022-03-01
申请号:US14899873
申请日:2015-12-17
Applicant: Schlumberger Technology Corporation
Inventor: Shunfeng Zheng , Benjamin Peter Jeffryes , Jacques Orban , Gokturk Tunc
IPC: E21B47/04 , E21B44/00 , E21B44/02 , E21B19/00 , E21B19/10 , E21B47/00 , E21B47/09 , E21B7/04 , E21B44/04 , E21B7/06 , E21B47/022 , E21B47/007 , G01B11/22
Abstract: Systems and methods for drilling a wellbore. The method includes measuring a first distance that a drilling device is raised while connected to a drill string, determining a weight-on-bit in the drill string, determining a second distance to lower the drilling device such that a drill bit at a lower extremity of the drill string approaches toward a bottom of the wellbore, based on the first distance and the weight-on-bit, and lowering the drilling device by the second distance.
-
公开(公告)号:US10782677B2
公开(公告)日:2020-09-22
申请号:US15714533
申请日:2017-09-25
Applicant: Schlumberger Technology Corporation
Inventor: Shunfeng Zheng , Franck Cedric Yanou Ngongang
IPC: G06Q10/06 , G05B19/418 , G06F21/33 , H04L29/06
Abstract: A method may include establishing a network connection between a sensor device and a drilling management network. The method may further include obtaining, from a control system in the drilling management network, a request for sensor data from a sensor device coupled to the drilling management network. The method may further include transmitting, using a communication protocol and over the drilling management network, the sensor data from the sensor device to the control system.
-
公开(公告)号:US10550642B2
公开(公告)日:2020-02-04
申请号:US14982917
申请日:2015-12-29
Applicant: Schlumberger Technology Corporation
Inventor: Shunfeng Zheng , Vishwanathan Parmeshwar
Abstract: A method for steering a downhole tool in a wellbore includes measuring a tool face when the drill bit is off-bottom, measuring an angular position of a drill string when the drill bit is off-bottom, and measuring a torque on the drill string when the drill bit is off-bottom. Measuring the tool face when the drill bit is on-bottom and measuring the torque on the drill string when the drill bit is on-bottom. Determining a transfer function comprising the angular position of the quill, the difference between the tool face when the drill bit is on-bottom and off-bottom, and the difference between the torque when the drill bit is on-bottom and off-bottom. The angular position of the drill string is varied at the surface, based upon the transfer function, to reduce an angle between the tool face when the drill bit is on-bottom and a target tool face.
-
-
-
-
-
-
-
-
-