公开(公告)号:US12079751B2
公开(公告)日:2024-09-03
申请号:US17208869
申请日:2021-03-22
IPC分类号: G06Q10/00 , G05B13/02 , G06Q10/0631 , G06Q50/06 , H02J3/00 , H02J3/14 , H02J3/28 , H02J3/32 , H02J3/38
CPC分类号: G06Q10/06313 , G05B13/021 , G06Q10/0631 , G06Q50/06 , H02J3/00 , H02J3/008 , H02J3/14 , H02J3/28 , H02J3/32 , H02J3/38 , H02J2203/20 , Y02B70/3225 , Y04S20/222 , Y04S50/10
摘要: A controller for a system of equipment that operate to produce or consume one or more resources includes one or more processing circuits configured to generate a resource balance constraint using a balance between a first amount of each resource and a second amount of each resource. The first amount of each resource includes at least an amount of the resource produced by the equipment. The second amount of each resource includes at least an amount of the resource consumed by the equipment. The one or more processing circuits are configured to perform a control process using the resource balance constraint to determine amounts of each resource to be produced or consumed by the equipment and operate the equipment to produce or consume the amounts of each resource determined by the control process.
-
公开(公告)号:US12130598B2
公开(公告)日:2024-10-29
申请号:US17859836
申请日:2022-07-07
IPC分类号: G05B13/04 , H04L41/0826 , H04L43/0811 , H04L43/10 , H04L49/90 , H04L67/10
CPC分类号: G05B13/041 , G05B13/048 , H04L41/0826 , H04L43/0811 , H04L43/10 , H04L49/90 , H04L67/10
摘要: A controller for operating building equipment of a building including processors and non-transitory computer-readable media storing instructions that, when executed by the processors, cause the processors to perform operations including obtaining a first setpoint trajectory from a cloud computation system. The first setpoint trajectory includes setpoints for the building equipment or for a space of the building. The setpoints correspond to time steps of an optimization period. The operations include determining whether a connection between the controller and the cloud computation system is active or inactive at a time step of the optimization period and determining an active setpoint for the time step of the optimization period using either the first or second setpoint trajectory based on whether the connection between the controller and the cloud computation system is active or inactive at the time step. The operations include operating the building equipment based on the active setpoint.
-
公开(公告)号:US12117816B2
公开(公告)日:2024-10-15
申请号:US17698653
申请日:2022-03-18
发明人: Jared W. Fread , Graeme Willmott , Ryan C. Beaty , Shawn A Schlagenhaft , Matthew J. Ellis , Michael J. Wenzel
IPC分类号: G05B19/418
CPC分类号: G05B19/4188 , G05B2219/31001 , G05B2219/32291
摘要: A controller is provided for building equipment including a plurality of devices that operate in parallel to affect an environmental condition of a building. The controller includes one or more processing circuits including one or more processors and memory. The memory store instructions that, when executed by the one or more processors, cause the one or more processors to perform operations. The operations include lowering an upper bound or raising a lower bound of one or more constraints based on a minimum off schedule or a minimum on schedule for the building equipment, performing an optimization of an objective function subject to the one or more constraints to generate control decisions for the building equipment, and operating the building equipment in accordance with the control decisions to affect the environmental condition of the building.
-
-