摘要:
A system is provided for controlling at least one fuel delivery characteristic during a combustion event within an engine. The system includes an accumulator having a variable volume, where the accumulator is configured to hold fuel at a variable pressure based on the variable volume. The system further includes a combustion chamber coupled to the accumulator. The variable volume is varied during the combustion event such that at least one fuel delivery characteristic of the fuel delivered from the accumulator into the combustion chamber is varied during the combustion event. A method and computer readable media are also provided for controlling at least one fuel delivery characteristic during a combustion event within an engine.
摘要:
A system (400) and method of determining fuel demands of a locomotive engine (10) based upon engine speed and power produced by the engine at a given time, so to optimize the engine's power output for a load while reducing engine emissions. The engine control architecture comprises three interrelated control loops (100–300). A primary feedback control loop (100) employs integral type control with gain scheduling to regulate engine speed to commanded slew rated based upon the locomotive's operator commands. A second control loop (200) provides an active, feed forward or predictive control consisting of a plurality of correction functions each utilizing a Taylor series having coefficients for each term in the series, the coefficients being modified to adapt the system to the engine with which it is used. A control third loop (300) optimizes reference speed slew rates and engine load rates by providing feedback of nominal engine fuel requirements or fuel demand, corrections to fuel demand based upon outputs from the second control loop, speed error values, and ambient conditions.
摘要:
A system (400) and method of determining fuel demands of a locomotive engine (10) based upon engine speed and power produced by the engine at a given time, so to optimize the engine's power output for a load while reducing engine emissions. The engine control architecture comprises three interrelated control loops (100-300). A primary feedback control loop (100) employs integral type control with gain scheduling to regulate engine speed to commanded slew rated based upon the locomotive's operator commands. A second control loop (200) provides an active, feed forward or predictive control consisting of a plurality of correction functions each utilizing a Taylor series having coefficients for each term in the series, the coefficients being modified to adapt the system to the engine with which it is used. A control third loop (300) optimizes reference speed slew rates and engine load rates by providing feedback of nominal engine fuel requirements or fuel demand, corrections to fuel demand based upon outputs from the second control loop, speed error values, and ambient conditions.
摘要:
A mission planner system for a powered system, the mission planner system including a receiving device to collect aspect information as the powered system performs a mission, said aspect information being received from a remote location, a processor to determine a speed limit based at least in part on the aspect information, and a control system connected to the powered system to operate the powered system in response to the speed limit. A method and a computer software code for determining the mission plan with aspect information obtained from a remote location during the mission are also disclosed.
摘要:
A method for communicating on a train that has at least two locomotives, the method including determining when a primary communication path ceases to be available for a specific subsystem of the train, identifying at least one auxiliary communication path to transmit information for the specific subsystem, configuring a message for the specific subsystem which complies with a message format of the at least one auxiliary communication path, and transmitting the message on the at least one auxiliary communication path. A system and a computer software code are further disclosed for providing a communication system for a powered system.
摘要:
A system is provided for managing an amount of stored energy in a powered system. The powered system is configured to complete a mission from an initial stage to a final stage. The system includes a controller including a memory configured to store a plurality of handling stages. The controller is configured to determine the stored energy at the initial stage based upon the initial stage and a handling stage positioned between the initial stage and the final stage, and selected from among the plurality of handling stages stored in memory. The stored energy is necessary to propagate the powered system from the initial stage to the handling stage upon the occurrence of an anomaly in the powered system. Additionally, a method and computer readable media are provided for managing an amount of stored energy in a powered system.
摘要:
A method for operating a powered system, the method including determining whether a mission plan of the powered system is correct to satisfy at least one mission objective of the powered system, if not, updating information used to establish the mission plan, revising the mission plan based on the updated information to satisfy the at least one mission objective, and operating the powered system based on the revised mission plan. A system and a computer software code for operating a powered system are also disclosed.
摘要:
One embodiment of the invention includes a system for operating a railway network comprising a first railway vehicle (400) during a trip along track segments (401/412/420). The system comprises a first element (65) for determining travel parameters of the first railway vehicle (400), a second element (65) for determining travel parameters of a second railway vehicle (418) relative to the track segments to be traversed by the first vehicle during the trip, a processor (62) for receiving information from the first (65) and the second (65) elements and for determining a relationship between occupation of a track segment (401/412/420) by the second vehicle (418) and later occupation of the same track segment by the first vehicle (400) and an algorithm embodied within the processor (62) having access to the information to create a trip plan that determines a speed trajectory for the first vehicle (400), wherein the speed trajectory is responsive to the relationship and further in accordance with one or more operational criteria for the first vehicle (400).
摘要:
A method includes determining an operational parameter of a first vehicle traveling with a plurality of vehicles in a transportation network and/or a route in the transportation network, identifying a failure condition of the first vehicle and/or the route based on the operational parameter, obtaining plural different sets of remedial actions that dictate operations to be taken based on the operational parameter, simulating travel of the plurality of vehicles in the transportation network based on implementation of the different sets of remedial actions, determining potential consequences on travel of the plurality of vehicles in the transportation network when the different sets of remedial actions are implemented in the travel that is simulated, and based on the potential consequences, receiving a selection of at least one of the different sets of remedial actions to be implemented in actual travel of the plurality of vehicles in the transportation network.
摘要:
A method is provided for operating a train or rail vehicle along a railway which is logically divided into segments, and includes at least one control point presenting at least two possible paths that are exclusive of each other, each path including one or more segments. The method includes: (a) controlling the rail vehicle as it travels along the railway by reference to a one-dimensional representation of the segments prior to the control point; (b) determining which segment located immediately past the control point is to be occupied by the rail vehicle; (c) after the rail vehicle has traveled past the at least one control point, verifying which segment was occupied; (d) interlocking the occupied segment; (e) passing segment information to the rail vehicle; and (f) controlling the rail vehicle as it travels along the railway in reference to a one-dimensional representation of the segments past the control point.