CHARGE/DISCHARGE CONTROL APPARATUS
    1.
    发明申请
    CHARGE/DISCHARGE CONTROL APPARATUS 有权
    充电/放电控制装置

    公开(公告)号:US20100076825A1

    公开(公告)日:2010-03-25

    申请号:US12541198

    申请日:2009-08-14

    IPC分类号: G06Q30/00 H02J7/00 G06F7/00

    摘要: A charge/discharge control apparatus includes: a charge/discharge reward information receiving unit for receiving charge/discharge reward information representing a reward given to a charge/discharge action of a customer and a restriction in conducting a charging/discharging from a charge management central server; a computing unit for creating a charge/discharge plan including a total charging quantity in a time zone and an estimated use start time of an electric vehicle such that a reward is maximized, based on the charge/discharge reward information; a charge/discharge instruction transmitting unit for instructing the electric vehicle to start or finish a charging/discharging according to the charge/discharge plan; a charge/discharge quantity monitoring unit for monitoring the charging/discharging; and a charge/discharge results transmitting unit for transmitting results of monitored charging/discharging including contents of the conducted charging/discharging and individual identification information for identifying itself, to a charge management central server.

    摘要翻译: 充电/放电控制装置包括:充/放电奖励信息接收单元,用于接收表示对客户的充电/放电动作给出的奖励的充值/放电奖励信息以及从充电管理中心进行充电/放电的限制 服务器; 计算单元,用于基于所述充电/放电奖赏信息,创建包括在时区中的总计费量和电动车辆的估计使用开始时间的充电/放电计划,使得奖励最大化; 充电/放电指令发送单元,用于根据充电/放电计划指示电动车辆开始或完成充电/放电; 用于监视充电/放电的充电/放电量监视单元; 以及充电/放电结果发送单元,用于将包括所进行的充电/放电的内容和用于识别自身的个人识别信息的监视的充电/放电的结果发送到计费管理中心服务器。

    POWER MONITOR AND CONTROL APPARATUS AND CONTROL APPARATUS OF DISTRIBUTED POWERING SYSTEM
    2.
    发明申请
    POWER MONITOR AND CONTROL APPARATUS AND CONTROL APPARATUS OF DISTRIBUTED POWERING SYSTEM 有权
    分布式供电系统的电力监控与控制装置及控制装置

    公开(公告)号:US20130069447A1

    公开(公告)日:2013-03-21

    申请号:US13617594

    申请日:2012-09-14

    IPC分类号: H01H47/00

    摘要: If a failure has occurred on the backbone-power-transmission-network side, i.e., the electric-power system, and if the power supply to a power-distributing/transforming substation is stopped, a power-distributing feeder is cut off from the electric-power system. Moreover, a monitor/control apparatus transmits a single-operation-permitting permission signal to a distributed power-source system which is connected to the cut-off power-distributing feeder. Here, the distributed power-source system supplies its power to the power-distributing feeder only during a time-interval in which the system is receiving the permission signal. A general load and an important load, which are connected to the power-distributing feeder, find it possible to continue their activities by taking advantage of this power.

    摘要翻译: 如果主干电力 - 输电网络(即电力系统)发生故障,并且如果分配/变电站的电力供应停止,则分配供电器将从 电力系统。 此外,监视/控制装置向连接到截止电力分配馈线的分布式电源系统发送单个操作允许许可信号。 这里,分布式电源系统仅在系统正在接收许可信号的时间间隔内向配电馈线供电。 连接到配电馈线的一般负载和重要负载可以通过利用该功率来继续其活动。

    Power Equipment Control System
    3.
    发明申请
    Power Equipment Control System 有权
    电力设备控制系统

    公开(公告)号:US20120323395A1

    公开(公告)日:2012-12-20

    申请号:US13523381

    申请日:2012-06-14

    IPC分类号: G06F1/26

    摘要: In a power equipment control system connected, via a communication network, to a system operation server of a power system and a single or a plurality of power equipments for performing power consumption or storage with interconnecting to the power system, to regulate power demand and supply balance of the power equipment, a contribution degree is obtained by preparing a demand plan of subsequent power of said power equipment; transmitting, to said power equipment, information relevant to demand regulation request to said power equipment, received from said system operation server, based on said demand plan; receiving demand regulation result of observation information on the demand regulation performed within said power equipment, based on said demand regulation request; and performing said demand regulation by said power equipment from said demand regulation result.

    摘要翻译: 在电力设备控制系统中,通过通信网络连接到电力系统的系统操作服务器和用于与电力系统互连进行功率消耗或存储的单个或多个电力设备,以调节电力需求和供应 电力设备的平衡,通过准备所述电力设备的后续电力的需求计划获得贡献度; 基于所述需求计划向所述电力设备发送从所述系统操作服务器接收到的与所述电力设备的需求调节请求有关的信息; 根据所述需求调节请求,接收在所述电力设备内执行的需求调节的观察信息的需求调节结果; 以及由所述电力设备从所述需求调节结果执行所述需求调节。

    TEST PATTERN GENERATION FOR SEMICONDUCTOR INTEGRATED CIRCUIT
    4.
    发明申请
    TEST PATTERN GENERATION FOR SEMICONDUCTOR INTEGRATED CIRCUIT 有权
    半导体集成电路测试图形生成

    公开(公告)号:US20120283981A1

    公开(公告)日:2012-11-08

    申请号:US13550008

    申请日:2012-07-16

    IPC分类号: G01R31/26

    摘要: A test pattern is sequentially selected from an original test pattern sequence constituted by a plurality of test patterns including a don't care bit. Power consumption in each of regions obtained by substantially equally dividing a layout region of a semiconductor integrated circuit in a case where a don't care value is specified in the selected test pattern and this selected test pattern is applied to the semiconductor integrated circuit is estimated. A searching is conducted for a don't care value of the selected test pattern which minimizes a variation in power consumption among the regions by repeatedly changing the don't care value and repeatedly estimating power consumption in the regions. A new test pattern sequence constituted by a plurality of test patterns including no don't care bit is generated by defining the don't care value obtained by the searching as a don't care value of the selected test pattern.

    摘要翻译: 从由包括无关位的多个测试图案构成的原始测试图案序列中顺序地选择测试图案。 估计在所选择的测试图形中指定了不关心值的情况下基本上等分半导体集成电路的布局区域获得的每个区域中的功耗,并将该选择的测试图案应用于半导体集成电路 。 对所选择的测试图案进行搜索,通过重复地改变不关心值并重复地估计区域中的功耗,从而最小化区域之间的功耗变化。 通过将通过搜索获得的无关心值定义为所选择的测试图案的无关价值,生成由包括不关心位的多个测试图案构成的新测试图案序列。

    Equipment Maintenance Assisting Method and Equipment Maintenance Assisting Server
    5.
    发明申请
    Equipment Maintenance Assisting Method and Equipment Maintenance Assisting Server 审中-公开
    设备维护辅助方法和设备维护服务器

    公开(公告)号:US20070168492A1

    公开(公告)日:2007-07-19

    申请号:US11685113

    申请日:2007-03-12

    IPC分类号: G06F15/173

    摘要: The system includes: an equipment data recording block 313 for recording one or more than one equipment information; a profile recording block 312 for storing a customer profile describing a customer request; an analysis block 311 for analyzing the equipment data recorded in the equipment data recording block 313, according to the customer profile, and creating a maintenance service assisting program and a maintenance enterprise assisting program; and a communication block 314 for transmitting the maintenance service assisting program to the customer, and the maintenance enterprise assisting program to the maintenance enterprise.

    摘要翻译: 该系统包括:用于记录一个或多于一个设备信息的设备数据记录块313; 用于存储描述客户请求的客户简档的简档记录块312; 分析块311,用于根据客户简档分析记录在设备数据记录块313中的设备数据,并创建维护服务辅助程序和维护企业辅助程序; 以及用于将维护服务辅助程序发送给客户的通信块314,以及维护企业向维护企业协助程序。