-
公开(公告)号:US20100064037A1
公开(公告)日:2010-03-11
申请号:US12593635
申请日:2008-04-04
IPC分类号: G06F15/173
CPC分类号: G06Q10/06
摘要: A first management apparatus that is connected to a first equipment device group including a plurality of first equipment devices centrally manages the first equipment devices. A second management apparatus connected to a second equipment device group including a plurality of second equipment devices separate from the plurality of first equipment devices centrally manages the second equipment devices. A group management apparatus connected to the first and second management apparatus centrally manages the first and second equipment device groups. The first and second management apparatus include first and second management programs to centrally manage the first and second equipment devices. The group management apparatus includes a group management program for centrally managing the first and second equipment device groups.
摘要翻译: 连接到包括多个第一设备设备的第一设备设备组的第一管理设备集中管理第一设备设备。 连接到包括与多个第一设备设备分离的多个第二设备设备的第二设备设备组的第二管理设备集中管理第二设备设备。 连接到第一和第二管理装置的组管理装置集中管理第一和第二设备装置组。 第一和第二管理装置包括用于集中管理第一和第二设备装置的第一和第二管理程序。 组管理装置包括用于集中管理第一和第二设备装置组的组管理程序。
-
公开(公告)号:US08001230B2
公开(公告)日:2011-08-16
申请号:US12593635
申请日:2008-04-04
IPC分类号: G06F15/16 , G06F15/173 , G06F15/177
CPC分类号: G06Q10/06
摘要: A first management apparatus that is connected to a first equipment device group including a plurality of first equipment devices centrally manages the first equipment devices. A second management apparatus connected to a second equipment device group including a plurality of second equipment devices separate from the plurality of first equipment devices centrally manages the second equipment devices. A group management apparatus connected to the first and second management apparatus centrally manages the first and second equipment device groups. The first and second management apparatus include first and second management programs to centrally manage the first and second equipment devices. The group management apparatus includes a group management program for centrally managing the first and second equipment device groups.
摘要翻译: 连接到包括多个第一设备设备的第一设备设备组的第一管理设备集中管理第一设备设备。 连接到包括与多个第一设备设备分离的多个第二设备设备的第二设备设备组的第二管理设备集中管理第二设备设备。 连接到第一和第二管理装置的组管理装置集中管理第一和第二设备装置组。 第一和第二管理装置包括用于集中管理第一和第二设备装置的第一和第二管理程序。 组管理装置包括用于集中管理第一和第二设备装置组的组管理程序。
-
公开(公告)号:US20120330469A1
公开(公告)日:2012-12-27
申请号:US13583197
申请日:2011-02-15
IPC分类号: G05D11/00
CPC分类号: H02J3/14 , F24F11/30 , F24F11/47 , F24F11/62 , H02J13/001 , H02J2003/143 , Y02B70/3225 , Y04S20/222
摘要: The purpose of the present invention is to provide an energy management system that works both to reduce energy and to maintain amenity in each building. The energy management system (100) of the present invention is provided with an energy management apparatus (10) and a control apparatus (30, 30). The energy management apparatus is located superordinate to a plurality of buildings, and manages energy supplied to equipment devices provided to each building. The control apparatus is connected to the energy management apparatus, and controls the equipment devices in the buildings. The control apparatus has an operating status perceiving unit (36a, 236a, 336a, 436a) and a reducing capability presentation unit (36g, 236g, 336g, 436g), The operating status perceiving unit perceives the operating status of the equipment devices. The reducing capability presentation unit presents to the energy management apparatus a plurality of energy reducing capabilities for each condition, which are amounts of energy that can be reduced for the equipment devices, on the basis of the operating status. It is thereby possible to take into account both energy reducing and maintenance of amenity in the buildings.
摘要翻译: 本发明的目的是提供一种能够在每个建筑物中降低能量并维持舒适性的能量管理系统。 本发明的能量管理系统(100)具备能量管理装置(10)和控制装置(30,30)。 能量管理装置位于多个建筑物的上级,并且管理供应给提供给每个建筑物的设备装置的能量。 控制装置与能量管理装置连接,对建筑物内的设备进行控制。 控制装置具有操作状态感知单元(36a,236a,336a,436a)和减少能力呈现单元(36g,236g,336g,436g)。操作状态感知单元感知设备设备的操作状态。 降低能力呈现单元基于操作状态向能量管理装置呈现针对各种条件的多个能量减少能力,其为设备装置可以减少的能量。 因此,可以考虑到建筑物中的能量减少和舒适性的维持。
-
公开(公告)号:US09385532B2
公开(公告)日:2016-07-05
申请号:US13583197
申请日:2011-02-15
CPC分类号: H02J3/14 , F24F11/30 , F24F11/47 , F24F11/62 , H02J13/001 , H02J2003/143 , Y02B70/3225 , Y04S20/222
摘要: An energy management system includes an energy management apparatus configured to mange energy supplied to equipment devices of a plurality of buildings, and a control apparatus configured to control the equipment devices in the buildings. The energy management apparatus is located superordinate to the buildings. The control apparatus is connected to the energy management apparatus. The control apparatus includes an operating status perceiving unit configured to perceive operating status of the equipment devices, and a reducing capability presentation unit configured to present a plurality of energy reducing capabilities for at least one condition to the energy management apparatus. The energy reducing capabilities are amounts of energy that can be reduced for the equipment devices based on the operating status perceived.
摘要翻译: 能量管理系统包括配置成管理供给多个建筑物的设备装置的能量的能量管理装置,以及被配置为控制建筑物内的设备装置的控制装置。 能源管理装置位于建筑物的上层。 控制装置与能量管理装置连接。 所述控制装置包括被配置为感知所述设备装置的操作状态的操作状态感知单元和被配置为向所述能量管理装置呈现用于至少一个状态的多个能量减少能力的降低能力呈现单元。 能量减少能力是基于所感知的操作状态而能够减少设备装置的能量的量。
-
公开(公告)号:US20100121465A1
公开(公告)日:2010-05-13
申请号:US12596860
申请日:2008-04-02
IPC分类号: G05B19/418 , G05D23/19
CPC分类号: G05B23/0213 , G05B23/0297 , G05B2219/31433 , G06Q10/06
摘要: A group management apparatus is connected to first to nth management apparatus that collectively manage a plurality of installation equipment belonging to first to nth installation equipment groups, and collectively manages the first to nth installation equipment groups. One or more interrogation processors repeatedly carry out interrogation processing for the first to nth management apparatus regarding operating conditions of the installation equipment collectively managed by the first to nth management apparatus. Preferably, an allocation unit allocates different interrogation processors to the first to nth management apparatus, respectively, one at a time, and allocates other allocation processors to the first to nth management apparatus according to an interrogation processing state of the installation equipment by at least one of the interrogation processors.
摘要翻译: 组管理装置连接到共同管理属于第一至第n安装设备组的多个安装设备的第一至第n管理装置,并且共同管理第一至第n安装设备组。 一个或多个询问处理器对与第一至第n管理装置共同管理的安装设备的操作条件相反地对第一至第n管理装置执行询问处理。 优选地,分配单元分别向第一至第n管理装置分配不同的询问处理器,一次一个地分配询问处理器,并且根据安装设备的询问处理状态,至少一个分配给第一至第n管理装置的其他分配处理器 的询问处理器。
-
-
-
-