公开(公告)号:US20240318525A1
公开(公告)日:2024-09-26
申请号:US18732235
申请日:2024-06-03
发明人: Jacques Orban , Shunfeng Zheng , Bartley Patton , Eric Erickson
CPC分类号: E21B33/13 , B28C7/0418 , B28C9/004
摘要: Embodiments disclosed provide a pump assembly including a first pump for delivering at least one fluid. The first pump may include a first inlet coupled to the first pump for delivering at least one first fluid to the first pump, a second inlet coupled to the first pump for delivering at least one second fluid to the first pump, a first discharge coupled to the first pump for delivering the at least one first fluid at a first pressure, and a second discharge coupled to the first pump for delivering the at least one second fluid at a second pressure. In some embodiments, the first discharge and the second discharge are isolated from each other.
-
公开(公告)号:US20230417133A1
公开(公告)日:2023-12-28
申请号:US18466862
申请日:2023-09-14
发明人: Njaal Aarsland , Shunfeng Zheng , Anstein Jorud , Jason Bryant , Loic Hoarau
摘要: A method and system that include receiving sensor data that is indicative of an operational status of a well construction equipment that is being utilized to construct a planned well that include receiving a well construction plan that includes information that is indicative of the planned well and the well construction equipment. The method and system additionally include accessing a database of operational sequences that are executable to be performed by the well construction equipment to construct a plurality of wells and selecting from the database an operational sequence to construct the planned well. The method and system further include electronically controlling the well construction equipment to autonomously perform the plurality of physical or mechanical operations of the selected operational sequence to drill at least one of: a selected portion of the planned well and a path along the selected portion of the planned well through a subterranean formation.
-
公开(公告)号:US11788399B2
公开(公告)日:2023-10-17
申请号:US17812184
申请日:2022-07-13
发明人: Njaal Aarsland , Shunfeng Zheng , Anstein Jorud , Jason Bryant , Loic Hoarau
摘要: A supervisory control system for a well construction rig operable to perform well construction operations to construct a planned well at a wellsite. The supervisory control system may be installable in association with the well construction rig. The supervisory control system may comprise a supervisory controller communicatively connectable with a central controller of a rig control system of the well construction rig. The rig control system may be communicatively connected with and operable to control well construction equipment of the well construction rig. The supervisory controller may be operable to control the well construction equipment via the rig control system to cause the well construction equipment to perform the well construction operations. The central controller may be operable as an I/O interface for matching inputs and outputs of the supervisory controller with corresponding inputs and outputs of at least one piece of the well construction equipment.
-
公开(公告)号:US11697986B2
公开(公告)日:2023-07-11
申请号:US17012417
申请日:2020-09-04
发明人: Shunfeng Zheng
CPC分类号: E21B44/00 , H02J13/00001 , H02J13/00002
摘要: Apparatus and methods for managing power at a wellsite. An example apparatus may include a well construction equipment operable to construct a well at the wellsite, a power supply system operable to output electrical power to the well construction equipment to facilitate operation of the well construction equipment, and a control system for controlling the well construction system. The control system may be operable to store a digital drilling program and cause the well construction equipment to perform planned well construction operations based on the digital drilling program. The digital drilling program may include an equipment operational plan indicative of the planned well construction operations to be performed by the well construction equipment to construct the well, and an electrical power plan indicative of a planned electrical power demand of the well construction equipment to perform the planned well construction operations.
-
公开(公告)号:US20220074297A1
公开(公告)日:2022-03-10
申请号:US17012417
申请日:2020-09-04
发明人: Shunfeng Zheng
摘要: Apparatus and methods for managing power at a wellsite. An example apparatus may include a well construction equipment operable to construct a well at the wellsite, a power supply system operable to output electrical power to the well construction equipment to facilitate operation of the well construction equipment, and a control system for controlling the well construction system. The control system may be operable to store a digital drilling program and cause the well construction equipment to perform planned well construction operations based on the digital drilling program. The digital drilling program may include an equipment operational plan indicative of the planned well construction operations to be performed by the well construction equipment to construct the well, and an electrical power plan indicative of a planned electrical power demand of the well construction equipment to perform the planned well construction operations.
-
公开(公告)号:US11261724B2
公开(公告)日:2022-03-01
申请号:US14899873
申请日:2015-12-17
IPC分类号: E21B47/04 , E21B44/00 , E21B44/02 , E21B19/00 , E21B19/10 , E21B47/00 , E21B47/09 , E21B7/04 , E21B44/04 , E21B7/06 , E21B47/022 , E21B47/007 , G01B11/22
摘要: Systems and methods for drilling a wellbore. The method includes measuring a first distance that a drilling device is raised while connected to a drill string, determining a weight-on-bit in the drill string, determining a second distance to lower the drilling device such that a drill bit at a lower extremity of the drill string approaches toward a bottom of the wellbore, based on the first distance and the weight-on-bit, and lowering the drilling device by the second distance.
-
公开(公告)号:US10782677B2
公开(公告)日:2020-09-22
申请号:US15714533
申请日:2017-09-25
IPC分类号: G06Q10/06 , G05B19/418 , G06F21/33 , H04L29/06
摘要: A method may include establishing a network connection between a sensor device and a drilling management network. The method may further include obtaining, from a control system in the drilling management network, a request for sensor data from a sensor device coupled to the drilling management network. The method may further include transmitting, using a communication protocol and over the drilling management network, the sensor data from the sensor device to the control system.
-
公开(公告)号:US10550642B2
公开(公告)日:2020-02-04
申请号:US14982917
申请日:2015-12-29
摘要: A method for steering a downhole tool in a wellbore includes measuring a tool face when the drill bit is off-bottom, measuring an angular position of a drill string when the drill bit is off-bottom, and measuring a torque on the drill string when the drill bit is off-bottom. Measuring the tool face when the drill bit is on-bottom and measuring the torque on the drill string when the drill bit is on-bottom. Determining a transfer function comprising the angular position of the quill, the difference between the tool face when the drill bit is on-bottom and off-bottom, and the difference between the torque when the drill bit is on-bottom and off-bottom. The angular position of the drill string is varied at the surface, based upon the transfer function, to reduce an angle between the tool face when the drill bit is on-bottom and a target tool face.
-
公开(公告)号:US09659113B2
公开(公告)日:2017-05-23
申请号:US13834034
申请日:2013-03-15
发明人: Nathaniel Wicks , Jahir Pabon , Yong Chang , Shunfeng Zheng
CPC分类号: G06F17/5009 , E21B23/00
摘要: A method of estimating extended reach for a downhole line traversing a deviated section of a well. The method may include storing line and well architectural and physical data and then performing a static analysis of substantially axial-exclusive estimated friction between the line and well wall during conveyance (which may be thought of as the contact force due to interference therebetween). A one dimensional dynamic analysis may then be performed. Thus, based on these factors, speed of the conveyance, vibration parameters of an incorporated vibration tool, etc., an efficient simulation of the conveyance may be run.
-
公开(公告)号:US20160290119A1
公开(公告)日:2016-10-06
申请号:US14788124
申请日:2015-06-30
发明人: Gokturk Tunc , Shunfeng Zheng
CPC分类号: G05B15/02 , E21B44/00 , G05B19/0421
摘要: Systems and methods for controlling a drilling rig. The system includes a first layer including a plurality of subsystem controllers coupled with a plurality of rig subsystems, the plurality of subsystem controllers being configured to control operating parameters of the plurality of rig subsystems. The system also includes a second layer configured to receive information from the first layer based on an operation of the plurality of rig subsystems, and to provide control of the plurality of rig subsystems. The system further includes a third layer configured to execute one or more process applications and to provide a task-based command to the second layer.
摘要翻译: 用于控制钻机的系统和方法。 该系统包括包括与多个钻机子系统耦合的多个子系统控制器的第一层,多个子系统控制器被配置为控制多个钻机子系统的操作参数。 该系统还包括第二层,其被配置为基于多个钻机子系统的操作从第一层接收信息,并且提供对多个钻机子系统的控制。 该系统还包括被配置为执行一个或多个处理应用程序并向第二层提供基于任务的命令的第三层。
-
-
-
-
-
-
-
-
-