CENTRAL PLANT CONTROL SYSTEM WITH GEOMETRIC MODELING OF OPERATIONAL SEQUENCES

    公开(公告)号:US20210055702A1

    公开(公告)日:2021-02-25

    申请号:US16692346

    申请日:2019-11-22

    Abstract: A method for operating equipment according to sequence of operation using geometric models including obtaining a first geometric model for a first set of equipment and a second geometric model for a second set of equipment, the first set of equipment and the second set of equipment defined by the sequence of operation for the equipment, locating, on the first geometric model, a first nearest operating point based on a desired operating point, generating a first modified geometric model by removing one or more operating points that do not satisfy the first nearest operating point, generating a merged geometric model by merging the first modified geometric model with the second geometric model, locating a second nearest operating point based on a modified desired operating point, and operating the equipment in accordance with the first nearest operating point and the second nearest operating point.

    CENTRAL PLANT CONTROL SYSTEM WITH PLUG AND PLAY EMPC

    公开(公告)号:US20200293031A1

    公开(公告)日:2020-09-17

    申请号:US16890124

    申请日:2020-06-02

    Abstract: Systems and methods for implementing an economic strategy such as a model predictive control (EMPC) strategy. An EMPC tool is configured to present to receive sinks and connections between central plant equipment. The EMPC tool also includes a data model extender configured to extend a data model to define new entities and/or relationships. The EMPC tool also includes a high level EMPC algorithm configured to generate an optimization problem and an asset allocator configured to solve the resource optimization problem in order to determine optimal control decisions used to operate the central plant.

    Central plant control system with plug and play EMPC

    公开(公告)号:US10678227B2

    公开(公告)日:2020-06-09

    申请号:US15921955

    申请日:2018-03-15

    Abstract: Systems and methods for implementing an economic model predictive control (EMPC) strategy in any resource-based system include an EMPC tool. The EMPC tool is configured to present user interfaces to a client device. The EMPC tool is further configured to receive first user input including resources and subplants associated with a central plant. The EMPC tool is also configured to receive second user input including sinks and connections between central plant equipment. The EMPC tool also includes a data model extender configured to extend a data model to define new entities and/or relationships specified by user input. The EMPC tool also includes a high level EMPC algorithm configured to generate an optimization problem and an asset allocator configured to solve the resource optimization problem in order to determine optimal control decisions used to operate the central plant.

    BUILDING MANAGEMENT SYSTEM WITH ONLINE CONFIGURABLE SYSTEM IDENTIFICATION

    公开(公告)号:US20200026249A1

    公开(公告)日:2020-01-23

    申请号:US16040698

    申请日:2018-07-20

    Abstract: A building management system includes building equipment operable to affect a variable state or condition of a building and a control system configured to receive a user input indicating a model form. The model form includes a plurality of matrices having a plurality of elements defined in terms of a plurality of parameters. The control system is configured to parse the model form to generate a sequence of machine-executable steps for determining a value of each of the plurality of elements based on a set of potential parameter values, identify a system model by executing the sequence of machine-executable steps to generate a set of parameter values for the plurality of parameters, generate a graphical user interface that illustrates a fit between predictions of the identified system model and behavior of the variable state or condition of the building, and control the building equipment using the identified system model.

    FIBER OPTIC FLOW SENSOR
    27.
    发明申请

    公开(公告)号:US20190072419A1

    公开(公告)日:2019-03-07

    申请号:US16117404

    申请日:2018-08-30

    Abstract: A fiber optic flow sensor includes a fiber optic cable, a light emitter, an optical power meter, and a processing circuit. The fiber optic cable allows light to enter a first end of the fiber optic cable, reflect off a second end of the fiber optic cable and exit the fiber optic cable through the first end. The fiber optic cable is at least partially exposed to fluid flow at the second end. The light emitter emits light at an input power into the first end of the fiber optic cable. The optical power meter measures an output power of the light exiting the fiber optic cable at the first end. The processing circuit calculates a flow rate of the flow of fluid based on the input power of light entering the fiber optic cable and the output power of light exiting the first end of the fiber optic cable.

    Building management system with control framework

    公开(公告)号:US11283669B1

    公开(公告)日:2022-03-22

    申请号:US17013194

    申请日:2020-09-04

    Abstract: A method for automatically commissioning and operating an HVAC system to serve energy loads of a building site is shown. The method includes querying site information describing the building site to identify physical equipment and relationships between the physical equipment. The method further includes constructing an asset allocator model, the asset allocator model indicating connections between the physical equipment and resources produced or consumed by the physical equipment. The method further includes generating a mapping between points of the physical equipment at the building site and corresponding variables of the asset allocator model. The method further includes using the asset allocator model to generate values of one or more control variables of the asset allocator model. The method further includes adjusting an operation of the physical equipment by triggering software elements to automatically push updated values of the control variables to corresponding points of the physical equipment.

    CONTROL SYSTEM FOR GENERATING AND DISTRIBUTING ENERGY RESOURCES AND OPERATING BUILDING EQUIPMENT

    公开(公告)号:US20210334724A1

    公开(公告)日:2021-10-28

    申请号:US16860781

    申请日:2020-04-28

    Abstract: A method for controlling an energy production and distribution system includes identifying sources that supply input resources, subplants that produce output resources using the input resources, and sinks that consume the output resources. The method includes obtaining a cost function including a cost of producing the output resources and generating a transit time constraint that requires the input resources be sent from the sources to the subplants at a first departure time that occurs before a first arrival time at which the input resources are predicted to be used by the subplants. The method includes solving an optimization problem to determine an amount of the output resources to produce at each of multiple time steps within a time period. Solving the optimization problem includes performing an optimization of the cost function subject to the transit time constraint.