Redundant Flexible Datacenter Workload Scheduling

    公开(公告)号:US20200225726A1

    公开(公告)日:2020-07-16

    申请号:US16658983

    申请日:2019-10-21

    Applicant: Lancium LLC

    Abstract: Systems include one or more critical datacenter connected to behind-the-meter flexible datacenters. The critical datacenter is powered by grid power and not necessarily collocated with the flexible datacenters, which are powered “behind the meter.” When a computational operation to be performed at the critical datacenter is identified and determined that it can be performed more efficiently or advantageously at a flexible datacenter, the computational operation is instead obtained by the flexible datacenters for performance. The critical datacenter and flexible datacenters preferably share a dedicated communication pathway to enable high-bandwidth, low-latency, secure data transmissions. In some situations, a computational operation is supported by multiple datacenters in a redundant arrangement, such as multiple flexible datacenters.

    Methods and systems for adjusting power consumption based on a fixed-duration power option agreement

    公开(公告)号:US10608433B1

    公开(公告)日:2020-03-31

    申请号:US16702931

    申请日:2019-12-04

    Applicant: Lancium LLC

    Abstract: Examples relate to adjusting load power consumption based on a power option agreement. A computing system may receive power option data that is based on a power option agreement and specify minimum power thresholds associated with time intervals. The computing system may determine a performance strategy for a load (e.g., set of computing systems) based on a combination of the power option data and one or more monitored conditions. The performance strategy may specify a power consumption target for the load for each time interval such that each power consumption target is equal to or greater than the minimum power threshold associated with each time interval. The computing system may provide instructions the set of computing systems to perform one or more computational operations based on the performance strategy.

    System of Critical Datacenters and Behind-the-Meter Flexible Datacenters

    公开(公告)号:US20200091727A1

    公开(公告)日:2020-03-19

    申请号:US16132062

    申请日:2018-09-14

    Applicant: Lancium LLC

    Abstract: Systems include one or more critical datacenter connected to behind-the-meter flexible datacenters. The critical datacenter is powered by grid power and not necessarily collocated with the flexboxes, which are powered “behind the meter.” When a computational operation to be performed at the critical datacenter is identified and determined that it can be performed art a lower cost at a flexible datacenter, the computational operation is instead routed to the flexible datacenters for performance. The critical datacenter and flexible datacenters preferably shared a dedicated communication pathway to enable high-bandwidth, low-latency, secure data transmissions.

    Methods and systems for adjusting power consumption based on a fixed-duration power option agreement

    公开(公告)号:US12294217B2

    公开(公告)日:2025-05-06

    申请号:US18367673

    申请日:2023-09-13

    Applicant: LANCIUM LLC

    Abstract: Examples relate to adjusting load power consumption based on a power option agreement. A computing system may receive power option data that is based on a power option agreement and specify minimum power thresholds associated with time intervals. The computing system may determine a performance strategy for a load (e.g., set of computing systems) based on a combination of the power option data and one or more monitored conditions. The performance strategy may specify a power consumption target for the load for each time interval such that each power consumption target is equal to or greater than the minimum power threshold associated with each time interval. The computing system may provide instructions the set of computing systems to perform one or more computational operations based on the performance strategy.

    Methods and systems for distributed power control of flexible datacenters

    公开(公告)号:US12253898B2

    公开(公告)日:2025-03-18

    申请号:US18139134

    申请日:2023-04-25

    Applicant: LANCIUM LLC

    Abstract: A distributed power control system is provided that can include a datacenter and a remote master control system. The datacenter can include (i) computing systems, (ii) a behind-the-meter power input system configured to receive power from a behind-the-meter power source and deliver power to the computing systems, and (iii) a datacenter control system configured to control the computing systems and the behind-the-meter power input system. The remote master control system can be configured to issue instructions to the datacenter that affect an amount of behind-the-meter power consumed by the datacenter. The datacenter control system can receive, from a local station control system configured to at least partially control the behind-the-meter power source, a directive for the datacenter to ramp-down power consumption, and in response to receiving the directive, cause the computing systems to perform a set of predetermined operations correlated with the directive.

    Power aware scheduling
    38.
    发明授权

    公开(公告)号:US12099873B2

    公开(公告)日:2024-09-24

    申请号:US17402175

    申请日:2021-08-13

    Applicant: LANCIUM LLC

    Abstract: A method includes, by a scheduling controller, receiving from a user a request for an application to be executed by a computing system associated with a data center, wherein the application includes a plurality of tasks, and wherein the request includes an estimated execution time corresponding to an estimated amount of real-world time that the tasks will be actively running on the computing system to fully execute the application. The method includes receiving from the user a service level objective indicating a target percentage of a total amount of real-world time that the tasks will be actively running on the computing system and generating, in response to determining that the job can be completed according to the service level objective and the estimated execution time, a notification indicating acceptance of the job.

    Modifying computing system operations based on cost and power conditions

    公开(公告)号:US11961151B2

    公开(公告)日:2024-04-16

    申请号:US17868381

    申请日:2022-07-19

    Applicant: LANCIUM LLC

    CPC classification number: G06Q50/06 G06F1/3203 G06F11/3495 G06Q30/0201

    Abstract: Examples relate to flexible datacenters or other power loads tolerant of intermittent operation and configured to use power received behind-the-meter. A system may include a set of computing systems powered by behind-the-meter power and a datacenter control system. The datacenter control system may be configured to monitor a set of conditions that includes behind-the-meter power availability at the set of computing systems and perform a weighted analysis using the set of monitored conditions. Based on the weighted analysis, the datacenter control system may be configured to modulate operating attributes of one or more computing systems of the set of computing systems. In some examples, the datacenter control system is a remote master control system in communication with a datacenter control system of a flexible datacenter housing the set of computing systems.