Battery having indicia for correcting specific gravity determination at
varying electrolyte levels
    62.
    发明授权
    Battery having indicia for correcting specific gravity determination at varying electrolyte levels 失效
    电池具有用于校正在不同电解质水平下的比重测定的标记

    公开(公告)号:US4828943A

    公开(公告)日:1989-05-09

    申请号:US115814

    申请日:1987-11-02

    Inventor: Sue P. Pritchard

    CPC classification number: H01M10/484

    Abstract: A battery which facilitates the measurement and recording of data is provided. The battery has a transparent casing wall and a scale attached to the wall for measuring the level of electrolyte within the battery. The scale contains first measuring indicia for measuring the distance the electrolyte level falls below a high level mark, and second indicia aligned literally opposite and having values, for example, specific gravity value correction factors, correlating to those of the first indicia.

    Abstract translation: 提供了便于测量和记录数据的电池。 电池具有透明的外壳壁和附着在墙壁上的刻度,用于测量电池内的电解质水平。 该刻度包含用于测量电解质水平低于高水平标记的距离的第一测量标记,并且第二标记在字面上相对并且具有与第一标记的值相关的值,例如比重值校正因子。

    Integrated heat pump water heater
    63.
    发明授权
    Integrated heat pump water heater 失效
    综合热泵热水器

    公开(公告)号:US4598557A

    公开(公告)日:1986-07-08

    申请号:US781093

    申请日:1985-09-27

    Abstract: An economical full capacity integrated heat pump water system which utilizes the basic components of conventional heat pump systems and a hot water heat exchanger incorporated in the system. The invention may be operated in three refrigerant flow configurations, with five associated operational modes. In one configuration, the refrigerant flow is from the compressor, through the hot water heat exchanger, through the outdoor heat exchanger, through an expansion device, through the indoor heat exchanger and back to the compressor. In a second configuration, the refrigerant flow is from the compressor, through the hot water heat exchanger, through the indoor heat exchanger, through an expansion device, through the outdoor heat exchanger, and back to the compressor. In a third configuration, for the water heating only mode, the refrigerant flow is from the compressor, through the hot water heat exchanger, through an expansion device designed specifically for the range of refrigerant temperatures for hot water heating, through the outdoor heat exchanger, and back to the compressor.

    Abstract translation: 一种经济的全容量综合热泵水系统,其利用常规热泵系统的基本组件和结合在系统中的热水热交换器。 本发明可以以三个制冷剂流动配置操作,具有五个相关联的操作模式。 在一种构造中,制冷剂流从压缩机,热水热交换器,室外热交换器,膨胀装置,室内热交换器回到压缩机。 在第二构造中,制冷剂流从压缩机,热水热交换器,室内热交换器,膨胀装置,室外热交换器返回压缩机。 在第三构造中,对于仅热水模式,制冷剂流从压缩机通过热水热交换器通过专门设计用于热水加热的制冷剂温度范围的膨胀装置,通过室外热交换器, 并回到压缩机。

    Storm confirmation and path prediction system

    公开(公告)号:US10345484B2

    公开(公告)日:2019-07-09

    申请号:US14842083

    申请日:2015-09-01

    Abstract: Disclosed are various embodiments for confirming a tornado event has contacted a ground surface and for generating a path prediction. Upon receipt of power outage alarms from metering devices, the Advance Metering Infrastructure (AMI) application can generate cluster areas based on the location of the metering devices. The AMI application can compare a cluster area to a tornado pattern to determine if the cluster area has experienced a tornado event. The AMI application can determine a speed and a direction of the tornado event based on the location and a time stamp of a power outage associated with the metering devices in the cluster areas.

    Systems and methods for sequestering CO2

    公开(公告)号:US09808757B2

    公开(公告)日:2017-11-07

    申请号:US13909732

    申请日:2013-06-04

    Abstract: An exemplary embodiment of the present invention provides a carbon-dioxide (“CO2”) sequestration system comprising a CO2 source, a process-water source, a membrane module, and a sequestration duct. The membrane module comprises a first section, a second section, and a membrane. The first section can be configured to receive gaseous CO2 at a first pressure from the CO2 source. The second section can be configured to receive process-water at a second pressure from the process-water source, wherein the first pressure is greater than the second pressure. The membrane can be positioned between the first section and the second section and can comprise a plurality of apertures configured such that the gaseous CO2 passes through the plurality of apertures and dissolves into the process-water to form a process-water-CO2-solution. The sequestration duct can be in fluid communication with the second section and configured to transport the process-water-CO2 solution to a sequestration site.

    Notification system, method, and computer application based on decision rules for evaluating a plurality of utility meter conditions
    67.
    发明授权
    Notification system, method, and computer application based on decision rules for evaluating a plurality of utility meter conditions 有权
    基于用于评估多个公用事业仪表条件的判定规则的通知系统,方法和计算机应用

    公开(公告)号:US09424742B1

    公开(公告)日:2016-08-23

    申请号:US13873565

    申请日:2013-04-30

    CPC classification number: G08C19/16 G01D4/00

    Abstract: Various methods and systems are directed to a meter alert system that provides surveillance of meters and other components of a utility system. The meter alert system obtains, via a user interface, specification of one or more meter conditions among a list of meter conditions. The meter alert system generates a rule for a utility metering device according to the meter conditions, wherein the rule is associated with a utility metering device identifier of the utility metering device. The meter system executes the rule, wherein an execution of the rule generates an alert in response to at least one of the first meter condition being satisfied or the second meter condition being satisfied. The meter alert system transmits a notification message in response to the alert being generated.

    Abstract translation: 各种方法和系统针对提供对公用事业系统的仪表和其他部件的监视的仪表报警系统。 仪表报警系统通过用户接口在一个表格条件列表中获得一个或多个仪表状态的规格。 仪表报警系统根据仪表条件生成公用计量装置的规则,其中规则与公用计量装置的公用计量装置标识符相关联。 仪表系统执行规则,其中规则的执行响应于满足第一仪表状态或满足第二仪表状态中的至少一个而产生警报。 仪表报警系统响应于正在生成的警报而发送通知消息。

    Ash and solids cooling in high temperature and high pressure environment
    68.
    发明授权
    Ash and solids cooling in high temperature and high pressure environment 有权
    灰和固体在高温高压环境下冷却

    公开(公告)号:US09335100B2

    公开(公告)日:2016-05-10

    申请号:US13198745

    申请日:2011-08-05

    Abstract: Disclosed are cooling and depressurization system equipment, arrangement and methods to cool solid particles from a coal gasifier operating at high temperature and pressure. Ash needs to be continuously withdrawn from a circulating fluidized bed gasifier to maintain the solids inventory in the gasifier. The supports for the cooling surfaces are located on the lower temperature upper section of the primary cooler. The cooled solids along with the fluidizing gas exits the primary cooler to a secondary receiving vessel where the solids can be further cooled by conventional means. The fluidizing and entrained gas entering the secondary vessel is filtered and vented through a vent pressure control valve. The column of cooled solids in the secondary vessel is depressurized by a continuous depressurization system to low pressures which are sufficient for conveying the solids to silos for disposal.

    Abstract translation: 公开了冷却和减压系统设备,从高温和高压下运行的煤气化炉中固体颗粒冷却的方法。 灰分需要从循环流化床气化器中连续取出,以保持气化炉中的固体物质。 用于冷却表面的支撑件位于主冷却器的较低温度上部。 冷却的固体与流化气体一起离开初级冷却器到二次接收容器,其中固体可以通过常规方式进一步冷却。 进入二次容器的流化和夹带的气体被过滤并通过排气压力控制阀排出。 二次容器中冷却的固体柱通过连续减压系统减压至足以将固体输送到筒仓进行处理的低压。

    Systems and methods for commissioning lighting fixtures
    70.
    发明授权
    Systems and methods for commissioning lighting fixtures 有权
    调试照明灯具的系统和方法

    公开(公告)号:US09167668B1

    公开(公告)日:2015-10-20

    申请号:US14557583

    申请日:2014-12-02

    CPC classification number: H05B37/0245

    Abstract: An exemplary embodiment of the present invention a lighting device comprising a processor and a memory comprising instructions that, when executed by the processor, are configured to cause the lighting device to access identification information relating to the lighting device and transmit the identification information to a remotely located system controller automatically upon commissioning the lighting device.

    Abstract translation: 本发明的示例性实施例包括处理器和存储器的照明装置,所述指令在由处理器执行时被配置为使照明装置访问与照明装置相关的识别信息并将识别信息发送到远程 在调试照明设备时自动定位系统控制器。

Patent Agency Ranking