-
公开(公告)号:US20170253303A1
公开(公告)日:2017-09-07
申请号:US15601037
申请日:2017-05-22
申请人: SAIPEM S.P.A.
发明人: Diego LAZZARIN , Gianluca TOSO , Enrico RUARO
摘要: A vessel for laying a pipeline includes a plurality of workstations disposed along a pipelaying path that includes an upstream portion away from a first end of the vessel and a plurality of ramps, includes a first ramp and a downstream second ramp disposed along the pipelaying path, in the region of the first end of the vessel. Each of the plurality of ramps has a first upstream end, a second downstream end, and an adjustable inclination. The downstream end of the first ramp is positioned inboard of the first end of the vessel and above the bottom of the vessel and the upstream end of the second ramp is positioned inboard of the first end of the vessel and above the bottom of the vessel. An external ramp assembly includes ramps that can be pivoted relative to one another and locked in a selected position.
-
82.
公开(公告)号:US09709191B2
公开(公告)日:2017-07-18
申请号:US14778834
申请日:2014-03-21
申请人: TECHNIP FRANCE
发明人: Philippe Brunet , Sylvain Routeau , Bruno Jolin , Pascal Court
CPC分类号: F16L1/123 , F16L1/20 , F16L1/205 , F16L1/207 , F16L1/235 , F16L1/24 , F16L3/20 , F16L51/04 , F16L57/02
摘要: An underwater support device and an installation method for initiating the buckling of a section of rigid underwater pipe (16) deployed on a seabed (14). The device has a longitudinal support (22) capable of being installed between the seabed and the section of rigid underwater pipe (16) in a transverse direction, in such a way as to be able to locally detach the section of rigid underwater pipe (16) from the seabed (14) and allow the rigid underwater pipe (16) to be moved relative to said longitudinal support (22) in the direction of the longitudinal support. The device also has a link member (36) to secure the rigid underwater pipe (16) and the longitudinal support (22) in such a way as to be able to install said longitudinal support (22) on the seabed (14) by deploying the section of rigid pipe (26) on the seabed (14).
-
83.
公开(公告)号:US09695959B2
公开(公告)日:2017-07-04
申请号:US14402588
申请日:2013-06-14
申请人: SAIPEM S.p.A.
发明人: Mauro Mottini , Flavio Piccio
摘要: A guide system configured to guide a pipeline from a laying vessel onto the bed of a body of water has a float unit; a trolley, which is housed inside the frame, is selectively connectable to a pipeline spanning a given or designated path between the laying vessel and the bed of the body of water, and is configured to roll along the pipeline, parallel to the given or designated path; and at least one motor connected to the trolley) to selectively adjust the distance between the float unit and the laying vessel.
-
公开(公告)号:US09664306B2
公开(公告)日:2017-05-30
申请号:US14435718
申请日:2013-10-15
IPC分类号: F16L1/12 , F16L1/20 , F03G7/05 , F01K25/10 , F16L1/235 , F16L1/26 , F16L1/15 , F16L9/22 , B63B35/44
CPC分类号: F16L1/207 , B63B2035/4433 , F01K25/106 , F03G7/05 , F16L1/12 , F16L1/15 , F16L1/235 , F16L1/26 , F16L9/22 , Y02E10/34
摘要: A method of assembling a pipe on a water-supported floating platform is provided. The platform includes an open central bay, and a gantry on the platform is arranged so as to surround at least a portion of the bay. The method includes providing a pipe intake assembly and staves on the platform; transferring the pipe intake assembly to the interior space of the bay; assembling the individual staves on the pipe intake assembly in an offset construction; lowering the pipe portion within the bay and into the water until the upper ends of the staves reside within a lower portion of the gantry; increasing the length of the pipe portion by assembling additional staves to the upper ends of the assembled staves; and repeating the step of increasing the length of the portion of the pipe until the pipe has a desired length.
-
公开(公告)号:US09523181B2
公开(公告)日:2016-12-20
申请号:US14889119
申请日:2014-05-08
申请人: SAIPEM S.p.A.
CPC分类号: E02F5/145 , E02F5/006 , E02F5/08 , E02F5/104 , E02F5/109 , E02F5/125 , F16L1/165 , F16L1/20 , F16L1/207 , F16L1/235
摘要: A digging machine configured to bury a continuous elongated member in the bed of a body of water has a frame extending along a longitudinal axis; a guide assembly fitted to the frame to move crosswise to the longitudinal axis, and configured to engage and move along the continuous elongated member; and a control device configured to adjust the position of the guide assembly with respect to the frame and the continuous elongated member according to the conformation of the continuous elongated member.
摘要翻译: 构造成将连续细长构件埋在水体床中的挖掘机具有沿着纵向轴线延伸的框架; 引导组件,其安装到所述框架上以横向于纵向轴线移动,并且构造成沿着所述连续细长构件接合和移动; 以及控制装置,其被配置为根据连续细长构件的构型来调整引导组件相对于框架和连续细长构件的位置。
-
公开(公告)号:US20160265691A1
公开(公告)日:2016-09-15
申请号:US15158435
申请日:2016-05-18
申请人: ITREC B.V.
发明人: Arnoud Laurens FEIJEN , Ronny Lambertus Waltherus NOUWENS , Terence Willem August VEHMEIJER , Joop ROODENBURG
摘要: A method for installing an accessory onto a pipeline to be laid on the seabed, includes launching the pipeline from a first position of a tower in which the tower is at an angle α with respect to the vertical; stopping the launch of the pipeline, and hanging off the launched pipeline in a hang off module; positioning an accessory in a tower firing line; attaching the accessory to the launched pipeline in the hang off module and to at least one A&R cable; suspending the accessory and the launched pipeline from an A&R system; disengaging the hang off module from the launched pipeline; pivoting the pipeline launch tower to an accessory launch position in which the tower is at an angle γ that differs substantially from angle a, such that a pipeline launch trajectory is created which is large enough to launch the accessory and the launched pipeline with the A&R system.
摘要翻译: 一种将附件安装在待铺设在海床上的管道上的方法,包括从塔架的第一位置发射管道,其中塔架相对于垂直线成角度α; 停止管线的启动,并将挂起的管道悬挂在吊挂模块中; 将配件定位在塔式起火线中; 将附件连接到吊挂模块中的启动管道和至少一个A&R电缆; 从A&R系统暂停配件和发射管道; 将脱落模块与启动的管道分离; 将管道发射塔枢转到附件发射位置,其中塔处于与角度α基本上不同的角度γ,使得产生足够大的管道发射轨迹以启动附件和使用A&R系统的发射管道 。
-
公开(公告)号:US09410643B2
公开(公告)日:2016-08-09
申请号:US13953841
申请日:2013-07-30
发明人: Jesper Moeller
CPC分类号: F16L7/00 , E02B17/00 , E02B17/0004 , E02B2017/0091 , F16L1/15 , F16L1/235 , H02G1/10 , H02G9/02
摘要: A cable hang-off arrangement for an elevated support including a cable assembly with a flexible reinforced protective tube for accommodating a transmission cable arrangement, a mounting assembly arranged on the elevated support, and a lifting assembly for lifting the cable assembly from a lower level to the elevated support, which lifting assembly is realized to engage with the mounting assembly such that the cable assembly is suspended between the elevated support and the lower level. An offshore facility mounted on an elevated support above a variable lower level including a transmission cable arrangement and a flexible protective tube for guiding the transmission cable arrangement through an essentially vertical direction from the elevated support to the lower level into an essentially horizontal direction at the lower level is also provided. A method of mounting such a cable hang-off arrangement is also provided.
摘要翻译: 一种用于升高的支撑件的电缆悬挂装置,包括具有用于容纳传输电缆装置的柔性增强保护管的电缆组件,布置在升高的支撑上的安装组件和用于将电缆组件从较低电平提升到 提升的支撑件,该提升组件被实现为与安装组件接合,使得电缆组件悬挂在升高的支撑件和下部水平面之间。 安装在可变下部水平面上的升高的支撑件上的海上设备,包括传动缆索装置和柔性保护管,用于将传动缆索布置通过从升高的支撑件到下部水平的基本上垂直的方向在下部 水平也被提供。 还提供了一种安装这种电缆悬挂装置的方法。
-
公开(公告)号:US20160084407A1
公开(公告)日:2016-03-24
申请号:US14890221
申请日:2014-05-09
发明人: Alasdair Cowie , Charles Hughes
摘要: The invention provides a modular system for use in an offshore pipelay operation, and apparatus and a method of use. The system comprises a plurality of pipe storage modules, each comprising a rack for accommodating a plurality of pipeline sections. The pipe storage modules are configured to be assembled together to form an integrated structure on a deck of a vessel.
摘要翻译: 本发明提供了一种用于海上管道铺设操作的模块化系统,以及装置和使用方法。 该系统包括多个管道存储模块,每个管道存储模块包括用于容纳多个管道段的齿条。 管道存储模块被配置成组装在一起以在船的甲板上形成一体化的结构。
-
公开(公告)号:US20160003374A1
公开(公告)日:2016-01-07
申请号:US14770710
申请日:2014-03-21
申请人: ITREC B.V.
摘要: A marine pipeline installation vessel for laying a pipeline on the seabed, the vessel at least being adapted to carry out the reel lay method, wherein the vessel includes at least a first and a second storage reel for storage of the pipeline to be laid, which storage reels are positioned in or onto the vessel; a pipeline launch tower mounted to the vessel, which pipeline launch tower is adapted to launch the pipeline in a firing line along said tower; a pipeline guide which is mounted at an elevated position to the pipeline launch tower, which pipeline guide has a pipeline guide surface member providing an essentially circular or semi-circular pipeline guide surface, which pipeline guide is adapted to—in a primary pipelaying position thereof relative to the tower guide a pipeline from a first storage reel over the pipeline guide into the firing line, wherein the pipeline contacts the pipeline guide surface at a first contact point fore of the firing line and departs the surface at a first departure point into the firing line.
摘要翻译: 一种用于在海床上铺设管道的船用管道安装船,所述船舶至少适于执行卷轴铺设方法,其中所述船舶至少包括用于储存要铺设的管道的第一和第二存储卷轴,其中 存储卷轴位于容器中或其上; 安装在船上的管道发射塔,该管道发射塔适于在沿着塔的射击线上发射管道; 管道引导件,其安装在管线发射塔的升高位置,该管道引导件具有提供基本上圆形或半圆形管道引导表面的管道引导表面构件,该管道引导件适于在其主要管道铺设位置 相对于塔将来自第一存储卷轴的管道引导到管线引导件上方的投入线中,其中管线在射出线前面的第一接触点处接触管道引导表面,并在第一个出发点处离开表面 射击线
-
公开(公告)号:US20150377385A1
公开(公告)日:2015-12-31
申请号:US14766128
申请日:2014-02-06
申请人: SUBSEA 7 LIMITED
CPC分类号: F16L1/235 , F16L1/14 , F16L1/161 , F16L1/166 , F16L1/19 , F16L1/202 , F16L1/205 , F16L1/207 , F16L1/23 , F16L1/26
摘要: A method of abandoning a pipeline during subsea pipelaying from a pipelay vessel includes suspending the pipe string from a tendon element of an abandonment string and engaging further tendon elements to an upper end of the abandonment string while lowering the pipe string to a handover depth. At the handover depth, tension is applied via a wire to the top of the pipe string at an acute angle to the launch axis. This deflects the pipe string from the launch axis into axial alignment with the wire to transfer the weight load of the pipe string to the wire, whereupon the abandonment string can be decoupled from the pipe string. Recovery of the pipeline from the seabed can be effected by a reverse process.
摘要翻译: 在从海底管线船舶进行海底管道铺设期间放弃管道的方法包括:将管柱从放弃绳的腱元件悬挂下来,并将另外的腱元件接合到放弃柱的上端,同时将管柱降低到切换深度。 在切换深度处,通过导线将张力以与发射轴成锐角的角度施加到管柱的顶部。 这使得管柱从发射轴线偏转成与线轴对准以将管柱的重量载荷传递到线,于是放弃线可以与管柱分离。 从海底回收管道可以通过相反的过程来实现。
-
-
-
-
-
-
-
-
-