Methods and equipment to improve reliability of pinpoint stimulation operations
    1.
    发明授权
    Methods and equipment to improve reliability of pinpoint stimulation operations 有权
    提高精确点刺激操作可靠性的方法和设备

    公开(公告)号:US08915297B2

    公开(公告)日:2014-12-23

    申请号:US13231447

    申请日:2011-09-13

    CPC classification number: E21B43/267 E21B33/1277 E21B33/134

    Abstract: Apparatuses and methods for improving the reliability of pinpoint stimulation operations is disclosed. A pinpoint stimulation improvement apparatus is disclosed which includes a hold down device, at least one flow reducer coupled to the hold down device, and a jetting tool coupled to the flow reducer. The flow reducer is positioned downstream from the jetting tool. A fluid flowing through the jetting tool passes through the flow reducer and forms a sand plug downstream from the pinpoint stimulation improvement apparatus.

    Abstract translation: 公开了用于提高精确点刺激操作的可靠性的装置和方法。 公开了一种精确点刺激改善装置,其包括压紧装置,联接到压紧装置的至少一个减流器和联接到减流器的喷射工具。 减流器位于喷射工具的下游。 流过喷射工具的流体通过减流器,并在精确点刺激改善装置的下游形成砂塞。

    Complex Fracturing Using a Straddle Packer in a Horizontal Wellbore
    2.
    发明申请
    Complex Fracturing Using a Straddle Packer in a Horizontal Wellbore 有权
    在水平井眼中使用跨距封隔器的复杂压裂

    公开(公告)号:US20140096968A1

    公开(公告)日:2014-04-10

    申请号:US14106323

    申请日:2013-12-13

    CPC classification number: E21B43/26 E21B43/305

    Abstract: A method of inducing fracture complexity within a fracturing interval of a subterranean formation is provided. The method comprises defining a stress anisotropy-altering dimension, providing a straddle-packer assembly to alter a stress anisotropy of a fracturing interval, based on defining the stress anisotropy-altering dimension, isolating a first fracturing interval of the subterranean formation with the straddle-packer assembly, inducing a fracture in the first fracturing interval, isolating a second fracturing interval of the subterranean formation with the straddle-packer assembly, inducing a fracture in the second fracturing interval, wherein fracturing the first and second fracturing intervals alters the stress anisotropy within a third fracturing interval, isolating the third fracturing interval with the straddle-packer assembly, and inducing a fracture in the third fracturing interval. The straddle-packer assembly comprises a first packer, an injection port sub-assembly above the first packer, and a second packer above the injection port sub-assembly

    Abstract translation: 提供了一种在地层的压裂间隔内引起断裂复杂性的方法。 该方法包括定义应力各向异性变化尺寸,基于限定应力各向异性改变尺寸,提供跨越封隔器组件来改变压裂间隔的应力各向异性,隔离地下地层的第一压裂间隔, 在第一压裂间隔中引起断裂,用跨打包装组件隔离地层的第二压裂间隔,在第二压裂间隔内引起断裂,其中压裂第一和第二压裂间隔改变内部压应力的内应力各向异性 第三压裂间隔,与跨打包装组件隔离第三压裂间隔,并在第三压裂间隔中引起断裂。 跨打包装器组件包括第一封隔器,位于第一封隔器上方的注入端口子组件和在注入端口子组件上方的第二封隔器

    Method of improving waterflood performance using barrier fractures and inflow control devices
    5.
    发明授权
    Method of improving waterflood performance using barrier fractures and inflow control devices 有权
    使用屏障和流入控制装置提高注水性能的方法

    公开(公告)号:US08307893B2

    公开(公告)日:2012-11-13

    申请号:US13337072

    申请日:2011-12-24

    CPC classification number: E21B43/16 E21B43/12 E21B43/305

    Abstract: The present invention is directed to a method of hydrocarbon production from a hydrocarbon reservoir. The method includes providing a substantially horizontal wellbore having at least one productive interval within a hydrocarbon reservoir and forming at least one non-conductive transverse fracture in the reservoir along the substantially horizontal wellbore. An injection well is also provided. A fluid is injected into the reservoir through the injection well to displace hydrocarbons within the reservoir toward a production portion of the substantially horizontal wellbore. Fluid production from the at least one production interval into the substantially horizontal wellbore flows through an inflow control device that can restrict the fluid flow. A non-conductive transverse fracture can form a barrier within the reservoir to divert injected fluids to increase sweep efficiency and reduce the influx of injected fluids into the production interval.

    Abstract translation: 本发明涉及一种来自烃储层的烃生产方法。 该方法包括提供基本上水平的井筒,其在烃储层内具有至少一个生产间隔,并沿着基本上水平的井眼在储层中形成至少一个非导电横向断裂。 还提供了注射井。 通过注入井将流体注入储存器,以将贮存器内的烃置换为基本上水平的井筒的生产部分。 从至少一个生产间隔到基本上水平的井筒的流体生产流过可限制流体流动的流入控制装置。 不导电的横向断裂可以在储层内形成阻挡层,以转移注入的流体,以提高扫掠效率并减少注入流体进入生产区间。

    Methods and Devices for Treating Multiple-Interval Well Bores
    7.
    发明申请
    Methods and Devices for Treating Multiple-Interval Well Bores 有权
    用于处理多间井井的方法和装置

    公开(公告)号:US20090211759A1

    公开(公告)日:2009-08-27

    申请号:US12435128

    申请日:2009-05-04

    Abstract: Methods and devices are provided for treating multiple interval well bores. More particularly, an isolation assembly may be used to allow for zonal isolation to allow treatment of selected productive or previously producing intervals in multiple interval well bores. One example of a method for treating a multiple interval well bore includes the steps of: introducing an isolation assembly to a well bore, the isolation assembly comprising a liner, one or more sleeves and a plurality of swellable packers, wherein the sleeves and swellable packers are disposed about the liner; deploying a shifting tool inside the liner, where the sleeves are configured so as to provide open, closed and open to screen positions when actuated by the shifting tool. An open position allows for treatment of the well bore while an open to screen position allows for receiving fluid from the well bore. A closed position re-establishes zonal isolation.

    Abstract translation: 提供了用于处理多间隔井的方法和装置。 更具体地,可以使用隔离组件来允许区域隔离以允许在多个间隔井眼中处理选定的生产性或先前产生的间隔。 用于处理多间隔井眼的方法的一个实例包括以下步骤:将隔离组件引入井眼,所述隔离组件包括衬套,一个或多个套筒和多个可膨胀的封隔器,其中所述套筒和可膨胀的封隔器 围绕衬垫设置; 在衬套内部布置换档工具,其中套筒构造成当由换档工具致动时提供打开,关闭和打开的屏幕位置。 打开位置允许处理井眼,而打开到屏幕位置允许从井眼接收流体。 关闭位置重新建立区域隔离。

    Methods of stimulating a subterranean formation comprising multiple production intervals
    8.
    发明授权
    Methods of stimulating a subterranean formation comprising multiple production intervals 有权
    刺激包含多个生产间隔的地层的方法

    公开(公告)号:US07273099B2

    公开(公告)日:2007-09-25

    申请号:US11004441

    申请日:2004-12-03

    CPC classification number: E21B43/114 E21B43/25 E21B43/26

    Abstract: A method of stimulating a production interval adjacent a well bore having a casing disposed therein, that comprises introducing a carrier fluid comprising first particulates into the well bore, packing the first particulates into a plurality of perforations in the casing, perforating at least one remedial perforation in the casing adjacent to the production interval, and stimulating the production interval through the at least one remedial perforation. Also provided are methods of stimulating multiple production intervals adjacent a well bore.

    Abstract translation: 一种刺激邻近井筒的生产间隔的方法,所述井眼具有设置在其中的壳体,所述方法包括将包含第一颗粒的载体流体引入所述井眼中,将所述第一颗粒填充到所述壳体中的多个穿孔中,穿透至少一个补救穿孔 在与生产间隔相邻的套管中,并通过至少一个补救穿孔刺激生产间隔。 还提供了在井眼附近刺激多个生产间隔的方法。

    Method and Wellbore Servicing Apparatus for Production Completion of an Oil and Gas Well
    10.
    发明申请
    Method and Wellbore Servicing Apparatus for Production Completion of an Oil and Gas Well 有权
    油气井生产完井方法和井筒维修设备

    公开(公告)号:US20140034319A1

    公开(公告)日:2014-02-06

    申请号:US13567953

    申请日:2012-08-06

    CPC classification number: E21B43/14 E21B34/10 E21B43/162 E21B43/26 E21B43/261

    Abstract: A method of servicing a subterranean formation comprising placing a wellbore servicing system within a wellbore penetrating the subterranean formation, wherein the wellbore servicing system comprises a first activatable stimulation assembly and a second activatable stimulation assembly incorporated within a tubular string, configuring the wellbore servicing system to provide a route of fluid communication from the first activatable stimulation assembly to a first zone of the subterranean formation, introducing a treatment fluid into the first zone of the subterranean formation via the first activatable stimulation assembly, and embedding a first portion of the wellbore servicing system within the wellbore.

    Abstract translation: 一种维护地下地层的方法,包括将井眼维修系统放置在穿透地下地层的井眼内,其中井筒维修系统包括第一可激活刺激组件和并入管状柱内的第二可激活刺激组件,将井筒维修系统配置为 提供从第一可激活刺激组件到地下结构的第一区域的流体连通的路线,经由第一可激活刺激组件将治疗流体引入地下层的第一区域,并且嵌入井筒维修系统的第一部分 在井筒内。

Patent Agency Ranking