摘要:
A lubrication system for a direct injected V-type two-cycle engine is disclosed having a lubricant pump adapted to discharge lubricant into each crankcase chamber of the engine through ports positioned adjacent the downstream side of reed valves of the air intake system. Ports supplying lubricant to cylinders in the right cylinder bank of the engine extend through a left wall of the corresponding crankcase chamber. Ports supplying lubricant to cylinders in the left cylinder bank of the engine extend through a right wall of the corresponding crankcase chamber. During engine assembly, the lubricant pump is manually driven before it is mechanically installed so as to fill the attached supply hoses with lubricant. The pump delivers lubricant to each crankcase chamber at a rate high enough to avoid lubricant carbonization at engine idle and low enough to avoid lubricant resistance to crankshaft rotation, which may make the engine difficult to start.
摘要:
A hose clamp includes a plate spring main body, and a slit and a first grip piece are formed at one end portion, while an insertion piece and a second grip piece are formed at the other end portion thereof. A locking piece having a hook-shaped locking portion is formed on the first grip piece via a bent portion, while an engagement holding portion is formed on the second grip piece. Provided on the locking piece are a taper portion which expands from the locking portion towards the bent portion and a stopper portion which extends substantially parallel to the first grip piece. The taper portion is disposed along a plane which is substantially parallel to a circumferential surface of the plate spring main body, and an intersection point between the taper portion and the stopper portion is offset in a width direction relative to the locking portion.
摘要:
A fuel delivery system of a machine capable of efficiently feeding fuel, where a time of feeding fuel to a construction machine is estimated based on operation information of the construction machine. Based on position information of the construction machine acquired by position information acquiring means and estimated time of feeding fuel, a delivery schedule, which has a short moving distance and capable of delivering and feeding fuel efficiently in a short period of time, is formed. The delivery schedule is notified to a controller of the construction machine. The delivery schedule is reconstructed by a set input of a change in the delivery schedule from the controller. A specified form for requesting expense of feeding fuel is automatically formed from a fuel feeding amount after fuel has been delivered and fed by the formed delivery schedule and confirming to feed fuel.
摘要:
A power support system to an electric work machine includes: a cable holding unit configured to hold a cable that transmits power; a cable support pole configured to support the cable held by the cable holding unit at a position higher than a height of a vehicle that travels on a track that intersects at a position where the cable is disposed; and a travel device connected to the cable holding unit and the cable support pole and configured to perform a traveling operation so as to be able to move the cable holding unit and the cable support pole.
摘要:
A mine power management system includes: a first power line provided at an ascent and configured to exchange electric power with an ascending vehicle traveling on the ascent; a second power line provided at a descent and configured to exchange electric power with a descending vehicle traveling on the descent; and a power supply and storage apparatus configured to exchange electric power at least between the first power line and the second power line.
摘要:
A plurality of cells is divided into cells of first and second cell groups so as to maximize the number of intra-group signal wires. The cells of the first cell group are placed to minimize a total length of intra-group signal wires of the first cell group. The cells of the second cell group are placed according to position information and number information of the cells to minimize a total length of the inter-group signal wires in a semiconductor integrated circuit in which a first and second semiconductor chips are attached to each other to make the first cell group arranged on the first semiconductor chip face the second cell group arranged on the second semiconductor chip. Therefore, a total length of signal wires in the semiconductor integrated circuit can be efficiently shortened, and the adverse influence of signal delay caused by the signal wires can be considerably reduced.
摘要:
Only snapshot data necessary for monitoring faults are collected from machine such as vehicles, allowing faults to be more accurately monitored, and the amount of data and the memory storage volume at a monitoring station to be reduced. The values of a plurality of (A), (B), (C), and (D) operating parameters (engine rotational speed, lever operating position, vehicle speed, and tractive force) which change during the operation of the machine are sequentially detected for each machine. The fault detection history data are thus updated every time a fault (drop in engine oil pressure, overheating) is detected during the operation of the machine. Thus, when a fault (drop in engine oil pressure) is detected during the operation of the machine, it is determined on the basis of the history data whether or not to send to the monitoring station the sequential values of the operating parameters ((A) engine rotational speed, (B) lever operating position, (C) vehicle speed, (D) tractive force) from within a prescribed period of time (from 10 min. before to 5 min. after) around the point in time t0 at which the fault was detected. When it is determined that they should be sent, the type of detected fault (0001 (drop in engine oil pressure)), the values detected ((A) 2, (B) 3, (C) 3, (D) 2) at the time the fault was detected, as well as the sequential values of the operating parameters from within a prescribed period of time (from 10 min. before to 5 min. after) around the time the fault was detected are transmitted to the monitoring station. When it is determined that they should not be sent, on the other hand, the type of detected fault (0001 (drop in engine oil pressure)) and the values detected ((A) 2, (B) 3, (C) 3, (D) 2) at the time the fault was detected are sent to the monitoring station.
摘要:
A mine transportation management system capable of reducing cost by reducing the number of transportation vehicles is provided. For this purpose, the system includes a plurality of self-propelled vehicles and a plurality of vessels each having a communication section, and each being identifiable, which are connectable to and separable from each other. A loading machine having a communication section, which loads an object into at least one of the vessels. A management center, which has a communication section, selects a vessel to be transported and selects a self-propelled vehicle for transporting the selected vessel based on a transportation demand signal from a processing facility, and transmits a transportation command signal to the selected self-propelled vehicle to connect to the selected vessel and to travel to the processing facility.
摘要:
To provide a carrier vehicle capable of restraining an increase in cost of a power train, the carrier vehicle is constructed by front axles provided respectively steerably on left and right sides of a front portion of the vehicle and mounted with wheels, a first engine provided at the front portion of the vehicle, a first drive axle provided at a middle portion of the vehicle and mounted with wheels at both left and right ends thereof, a first transmission, a second drive axle provided at a rear portion of the vehicle and mounted with wheels at both left and right ends thereof, a second engine provided at the rear portion of the vehicle and on an upper side of the second drive axle, and a second transmission provided to connect to a front side of the second engine.
摘要:
Maintenance due times of components of a machine are determined according to the status of user-performed in-house maintenance and according to the occurrence of abnormalities during machine operation. A subtraction point (20 points) associated with an abnormality (overheating) detected during machine operation is subtracted from the score (80 points) of a corresponding component (engine) in the machine. An addition point (50 points) associated with the type of maintenance (overhaul performed by in-house maintenance) indicated in maintenance information is added to the score (80 points). Thus, at the time where the value resulting from subtractions from and additions to the score for that component (engine) reaches a prescribed value (10 points) indicating maintenance due time, it is determined that the maintenance due time for that component (engine) has been reached.