摘要:
A power model that relates the settings of resource actuators to power consumption levels of the resource actuators and a condition model that relates the settings of the resource actuators to an environmental condition at the location of the at least one entity and a power consumption level of the at least one entity are developed. A constraint optimization problem having an objective function and at least one constraint is formulated, where the objective function computes at least a proportional quantity of a total power consumption level of the resource actuators and the at least one constraint comprises a setpoint environmental condition at a location of the at least entity. A solution to the constraint optimization problem is determined, where the solution provides optimal values for the resource actuator settings.
摘要:
In a method of determining status assignments for a plurality of entities that substantially optimizes a total power consumption of the plurality of entities and a plurality of resource actuators, at least one entity power model for the entities and at least one resource power model for the resource actuators are developed. In addition, a constraint optimization problem having an objective function and at least one constraint is formulated and the problem is solved by employing a search tool, the at least one entity power model, and the at least one resource power module on the objective function to identify status assignments for the entities that results in the optimized total power consumption.
摘要:
A power model that relates the settings of resource actuators to power consumption levels of the resource actuators and a condition model that relates the settings of the resource actuators to an environmental condition at the location of the at least one entity and a power consumption level of the at least one entity are developed. A constraint optimization problem having an objective function and at least one constraint is formulated, where the objective function computes at least a proportional quantity of a total power consumption level of the resource actuators and the at least one constraint comprises a setpoint environmental condition at a location of the at least entity. A solution to the constraint optimization problem is determined, where the solution provides optimal values for the resource actuator settings.
摘要:
In a method for supplying a resource to an entity from a resource actuator, a plurality of physics-based models pertaining to the resource actuator and the entity are developed, a condition detected at the entity is received, feedback control on a resource demand of the entity employed based upon the detected condition, feed forward control on the resource demand of the entity is employed based upon the detected condition and the plurality of physics-based models, a constraint optimization problem having an objective function and at least one constraint using the plurality of physics-based models is formulated, a solution to the constraint optimization problem is determined, in which the solution provides the actuator setting, and the resource actuator is set to the actuator setting to supply the entity with the resource from the resource actuator.
摘要:
In a method for supplying a resource to an entity from a resource actuator, a plurality of physics-based models pertaining to the resource actuator and the entity are developed, a condition detected at the entity is received, feedback control on a resource demand of the entity employed based upon the detected condition, feed forward control on the resource demand of the entity is employed based upon the detected condition and the plurality of physics-based models, a constraint optimization problem having an objective function and at least one constraint using the plurality of physics-based models is formulated, a solution to the constraint optimization problem is determined, in which the solution provides the actuator setting, and the resource actuator is set to the actuator setting to supply the entity with the resource from the resource actuator.
摘要:
In a method for managing a facility that is to receive resources from a first resource supply, a supply of resources available from the first resource supply is predicted for a predetermined period of time. In addition, a demand for resources in the facility during the predetermined period of time is predicted. A capacity schedule for the facility is planned to meet a predefined operational goal, in which the plan of the capacity schedule uses as inputs, the predicted supply of resources available from the first resource supply and the predicted demand for resources in the facility during the predetermined period of time. Moreover, a determination as to whether the planned capacity schedule meets the predefined operational goal is made.
摘要:
In a method for distributing cooling resources to a plurality of locations using a plurality of hierarchically identified cooling microgrids, conditions detected at the plurality of locations are received. Each level of the hierarchically identified cooling microgrids is a plurality of resource actuators configured to vary distribution of the cooling resources. Settings for the plurality of resource actuators in each of the levels in the cooling microgrid hierarchy that substantially maintain conditions at the plurality of locations within predetermined ranges are determined using a processor, while substantially optimizing at least one measure of performance associated with supplying the cooling resources to the plurality of locations.
摘要:
In a method for distributing cooling resources to a plurality of locations using a plurality of hierarchically identified cooling microgrids, conditions detected at the plurality of locations are received. Each level of the hierarchically identified cooling microgrids is a plurality of resource actuators configured to vary distribution of the cooling resources. Settings for the plurality of resource actuators in each of the levels in the cooling microgrid hierarchy that substantially maintain conditions at the plurality of locations within predetermined ranges are determined using a processor, while substantially optimizing at least one measure of performance associated with supplying the cooling resources to the plurality of locations.
摘要:
An embodiment includes gathering input data including observed utilizations of allocations and business service response times. The input data is partitioned into a plurality of data sets that include at least one training data set and at least one test data set. A model is generated that predicts responsiveness using the at least one training data set. The model is evaluated using the at least one test data set, and a business service response time distribution is predicted using the model. An embodiment may use a trace-based capacity planning methodology to estimate the impact of planning alternatives on business service responsiveness.
摘要:
Example methods, apparatus and articles of manufacture to provision data center resources are disclosed. An example method includes provisioning a first portion of data center resources to operate during time intervals based on a base workload for the respective time intervals, the base workload being based on data patterns of a data center and configuring a second portion of the data center resources to operate when an actual workload exceeds a threshold corresponding to the base workload.