RECORDING MEDIUM, AND SYSTEM
    1.
    发明申请

    公开(公告)号:US20230064228A1

    公开(公告)日:2023-03-02

    申请号:US17794623

    申请日:2021-01-20

    IPC分类号: G06F30/13 G01C11/02

    摘要: One aspect example is a system for photogrammetry of a building. A memory stores design data and physical material data. The design data includes virtual material information on attributes for each of virtual materials of a virtual building. The physical material data is on the attributes for each of physical materials and generated based on measured data acquired from a physical building constructed on the basis of the design data. A material associating processor is configured to generate pairs of virtual and physical materials by determining an association between the virtual materials and the physical materials based on the virtual material information and the physical material data. An attribute associating processor is configured to determine an association between the virtual material information and the physical material data in accordance with the attributes for each of the pairs.

    NONDESTRUCTIVE INSPECTING DEVICE
    2.
    发明公开

    公开(公告)号:US20240183801A1

    公开(公告)日:2024-06-06

    申请号:US18553283

    申请日:2022-03-31

    IPC分类号: G01N23/00 G01N23/22

    摘要: A nondestructive inspecting device 1 is provided with: a neutron beam emitting unit 10 capable of emitting a neutron beam in a prescribed emission direction D1; a gamma ray detecting unit 20 capable of detecting a gamma ray incident from a prescribed detection direction D2 intersecting the emission direction D1; a device housing 30 which covers the neutron beam emitting unit 10 and the gamma ray detecting unit 20, and in which an opening portion 30a is formed in the emission direction D1 and the detection direction D2; an outer shutter 31 for opening and closing the opening portion 30a of the device housing 30; an external dose monitor 41 for detecting a radiation dose inside the device housing 30; an internal dose monitor 42 for detecting a radiation dose outside the device housing 30; and a control unit 40 for prohibiting opening of the outer shutter 31 if the radiation dose detected by at least either of the dose monitors 41, 42 exceeds a predetermined threshold.

    WORK MANAGEMENT SYSTEM AND WORK MANAGEMENT METHOD

    公开(公告)号:US20210341908A1

    公开(公告)日:2021-11-04

    申请号:US17235763

    申请日:2021-04-20

    IPC分类号: G05B19/418 G06T7/00 G06T7/557

    摘要: Provided is a work management system enabling real-time inspection by simultaneously performing work and measurements. The work management system includes a tool including a communication unit and a trigger switch, a camera unit including a communication unit, a camera capable of identifying 3D camera coordinates from an image, a posture detecting device configured to acquire camera posture information, a control unit, and a prism, and a surveying instrument including a communication unit, a tracking unit, a distance-measuring unit, an angle-measuring unit, and a control unit, wherein upon detection that the trigger switch has been used, the camera unit collects camera posture information by the posture detecting device, a tool image by the camera, position coordinates of the prism measured by the surveying instrument, and orientation information of the camera unit viewed from the surveying instrument, and obtains and stores position coordinates of a tip end position of the tool.

    SURVEYING APPARATUS, SURVEYING METHOD, AND SURVEYING PROGRAM

    公开(公告)号:US20230314610A1

    公开(公告)日:2023-10-05

    申请号:US18187694

    申请日:2023-03-22

    IPC分类号: G01S17/10 G01C15/00 G01C3/08

    CPC分类号: G01S17/10 G01C15/002 G01C3/08

    摘要: Effects of multiple reflections in distance measurement using a laser are reduced. A surveying method for measuring a distance to a reflection point that reflects distance measuring light, based on emission and reception of the distance measuring light, includes assuming that a symbol “K” represents a natural number, excluding zero, and determining whether a beam that is received after the (K+1)th light emission is a repeatedly reflected beam of light that has been emitted before the (K+1)th light emission. The beam that is received, after the (K+1)th light emission, at a time corresponding to a period based on a time interval from light emission at or before the Kth light emission until first reception of a beam related to the light emission at or before the Kth light emission, is determined as being the repeatedly reflected beam.

    DATA MANAGEMENT SYSTEM, MANAGEMENT METHOD, AND STORAGE MEDIUM

    公开(公告)号:US20220414066A1

    公开(公告)日:2022-12-29

    申请号:US17780811

    申请日:2020-11-27

    IPC分类号: G06F16/21 G06F16/25

    摘要: Data management to reflect an actual construction status in design is realized. In order to achieve the object, a management system includes a design database recording, with respect to members of a construction object, design data of at least member IDs, member coordinates, member shapes, a measurement database recording measurement data of the construction object, a starting point member selecting unit configured to select a starting point member from the design database, a measurement information selecting unit configured to select the measurement data corresponding to the starting point member from the measurement database, and an actual status model creating unit configured to create an actual status model with respect to the starting point member by performing shape correction of a design model of the starting point member created from the design database by using the measurement data.

    SURVEYING DEVICE AND SURVEY SYSTEM
    9.
    发明申请

    公开(公告)号:US20180231380A1

    公开(公告)日:2018-08-16

    申请号:US15890635

    申请日:2018-02-07

    摘要: When a camera and a surveying device are connected by a synchro cable, and a photographing condition obtaining unit obtains a photographing start time of the camera, a survey control unit makes a survey time measurement unit start time measurement. After the camera and the surveying device are disconnected, the survey control unit starts a survey by a predetermined surveying period ΔT when tracking of the prism starts. Based on the time measurement by the survey time measurement unit, the survey control unit associates the survey result with the photographing position of each image taken by the camera to generate the data for photogrammetry.

    DATA MANAGEMENT SYSTEM, MANAGEMENT METHOD, AND STORAGE MEDIUM

    公开(公告)号:US20230015599A1

    公开(公告)日:2023-01-19

    申请号:US17783215

    申请日:2020-11-27

    IPC分类号: G06F30/12 G06Q50/08 G06F30/13

    摘要: A management system includes a design database of construction members, a measurement database of the construction members, a construction database recording construction data of the construction members, a construction member selecting unit, a peripheral member selecting unit, a model creating unit configured to create a design model of the construction member and a measurement model of the peripheral member, a corrected model creating unit configured to create a design corrected model by synthesizing the design model and the measurement model, and a corrected construction plan creating unit configured to select a construction designated member based on the design corrected model, and record, with respect to the construction designated member, coordinates and a shape of the design corrected model as construction designated member coordinates and a construction designated member shape, and construction content of the construction designated member as construction inspection content, in a corrected construction plan database.