GRAVITY BASED FOUNDATION
    1.
    发明公开

    公开(公告)号:US20240328107A1

    公开(公告)日:2024-10-03

    申请号:US18293390

    申请日:2022-07-29

    Abstract: A gravity base (1) for supporting a superstructure (2), comprising a base structure (100), wherein the base structure is configured to be arranged on a supporting media (3) and is configured to be connected to the superstructure (2) or to a support structure (300) which is configured to be arranged between the superstructure and the base structure, and wherein the support structure is configured to be connected to the superstructure; a ballast confiner (200), wherein the ballast confiner is configured to be filled with a ballast material (250), wherein the ballast confiner (200) is configured to confine the ballast (250) on the base structure (100), wherein the base structure and the ballast confiner are structurally independent.

    ADJUSTABLE PLATFORM FOR INSTALLING WIND TURBINE GENERATOR

    公开(公告)号:US20240026624A1

    公开(公告)日:2024-01-25

    申请号:US18454814

    申请日:2023-08-24

    Abstract: An adjustable platform for installing a wind turbine generator comprises an adjustable platform shell, the adjustable platform shell is installed on a hull, pile legs are connected vertically in the adjustable platform shell in a sliding way, a plurality of adjusting jacks are arranged on the pile legs, an electric plug-in component is arranged in the adjustable platform shell and used for fitting with the adjusting jacks. The fitting of electric plug-in component with the adjusting jacks of the pile legs replaces the bolted connection between the installation platform and the pile legs, and the electric power is used to replace the manual operation, solving the technical problems in the prior art that bolted connection is required between the installation platform and the pile legs, bolts are required to be removed manually before the pile legs sink, and the labor cost is greatly consumed.

    STABBING SYSTEM FOR INSTALLING OFFSHORE JACKET STRUCTURE AND INSTALLATION METHOD OF OFFSHORE JACKET STRUCTURE USING THE SAME

    公开(公告)号:US20230313481A1

    公开(公告)日:2023-10-05

    申请号:US18009752

    申请日:2021-12-01

    Applicant: K-BETS

    CPC classification number: E02B17/02 E02D27/52 E02D29/06 E02D27/425

    Abstract: The present disclosure relates to a stabbing system for installing an offshore jacket structure and an installation method for installing an offshore jacket structure using the same. Particularly, the stabbing system fixes, to a seabed-pile, a jacket leg of a jacket structure to be inserted into the seabed-pile that was pre-inserted into the seabed and includes: a stabbing member that is installed on an external surface of the jacket leg and supported by an upper end surface of the seabed-pile when the jacket leg has been inserted into the seabed-pile; a vertical gripper that is installed in plural number in the stabbing member and operated toward an upper end surface of the seabed-pile to adjust a horizontality degree of the jacket leg; a horizontal gripper that is installed in plural number in the outer periphery of the stabbing member and operated toward an external surface of the seabed-pile to fix the jacket leg to the seabed-pile; and a grouting unit that introduces grout into a space between the jacket leg and the seabed-pile, in a state that the jacket leg has been fixed inside the seabed-pile.

    OFFSHORE DRILLING AND A CONFIGURABLE SUPPORT STRUCTURE FOR THE SAME

    公开(公告)号:US20180347135A1

    公开(公告)日:2018-12-06

    申请号:US15771688

    申请日:2016-10-06

    Abstract: Without limitation, embodiments of the present invention relates to an offshore wellhead platform (100), the offshore wellhead platform (100) comprising a configurable support structure (200) for supporting upper parts of a plurality of conductors (210) through which one or more well processing tasks can be performed, wherein the configurable support structure (200) further provides a first position (150) and a second position (160) for the conductors (210), and the offshore wellhead platform (100) allows movement of an upper part of a conductor (210) between its first (150) and second position (160). In this way, efficiency when processing a plurality of wells is provided since repositioning of the well center is not needed or needed significantly less. Effectively, the wells are brought to the well center so-to-speak instead of the well center needing to be moved to each well.

Patent Agency Ranking