摘要:
An ecological slope protection has an efficient water purification function, built in a land-lake ecozone along the bank of a basin, wherein the body of the ecological slope protection extends into the water of the basin, and has a flexible mattress laid on the surface thereof; an ecological filter pool is provided below the flexible mattress and is isolated from the water of the basin by means of the pool body; the ecological filter pool is contained with a filler layer and a support layer, and the filler layer is supported by the support layer; the sewage pretreated via a sedimentation pool is introduced into the ecological filter pool and treated by the filler layer to clean up pollutants therein and reduce its eutrophication level; and the treated sewage is discharged from the ecological slope protection via the support layer and enters the basin.
摘要:
A seawall section includes a central hub having an axis extending in a longitudinal direction and three circumferentially spaced walls extending radially from the central hub. Each of the walls is made of cast concrete reinforced with a rebar cage having a plurality of longitudinally spaced pairs of parallel rebars extending radially from the central hub to an end rebar that extends perpendicularly relative to the parallel rebars. Each end rebar is connected to radially outer ends of one of the pairs of parallel rebars. A seawall comprises a plurality of the seawall sections connected together end-to-end with a cable, and connecting plates fastened to adjacent sections. A form for manufacturing the seawall section encloses connected rebars and is filled with concrete.
摘要:
The present invention relates to a block structure for preventing sand erosion, more specifically to a block structure for preventing sand erosion, which is positioned in the sea, collects sand pushed into sea according to flow of low tide and pushes the collected sand toward coast or coastal side at high tide in coast or s-a near coast according to flow of wave.
摘要:
A method for making substantially parallelepiped square cross-section formwork modules for building constructions, cut-off walls, embankments, dams, anti-erosion and anti-seismic foundations and/or the like, starting from used pneumatic tires, having at least the steps of: a) providing a used pneumatic tire deriving both from a periodic replacement of worn tires or from the rubber industry wastes or from the recovering of used pneumatic tires; b) removing from the pneumatic tire the two wall iron beads; c) performing cuts at diametrically opposite positions on the edges, wherein the cuts define cut-out regions separated by a middle solid region of the tire wall; d) removably mounting the pneumatic tire on basket-drum supporting means; and e) pressing in diametrical directions towards a center of the pneumatic tire the pneumatic tire tread portions near the cuts thereby causing the tire to assume a substantially parallelepiped configuration.
摘要:
The present invention discloses a brick, comprising a brick body, which comprises at least one slot position for connecting a column, and a method for using the bricks to build dikes in water, including the following steps: (1) drilling a plurality of pile holes at water bottom; (2) casting concrete into each of the pile holes to form concrete columns; (3) stacking up a number of the bricks along the concrete columns and having them tightly connected to form a wall; (4) filling the clearances between the concrete columns and the bricks with mortar. The bricks and dike building method provided by the present invention are suitable for direct over-water dike building, the construction is fast and the dikes built are firm and stable, have superior waterproof function and can effectively prevent the impact of currents, winds and waves.
摘要:
A container is disclosed. The container has a side part, an upper part, a lower part, and a cavity formed by the side part, the upper part, and the lower part. The container also has a material disposed in the cavity. The side part has at least one protrusion and at least one recess. The side part is permeable to water. The side part is also nonpermeable to the material disposed in the cavity.
摘要:
The present invention discloses a brick, comprising a brick body, which comprises at least one slot position for connecting a column, and a method for using the bricks to build dikes in water, including the following steps: (1) drilling a plurality of pile holes at water bottom; (2) casting concrete into each of the pile holes to form concrete columns; (3) stacking up a number of the bricks along the concrete columns and having them tightly connected to form a wall; (4) filling the clearances between the concrete columns and the bricks with mortar. The bricks and dike building method provided by the present invention are suitable for direct over-water dike building, the construction is fast and the dikes built are firm and stable, have superior waterproof function and can effectively prevent the impact of currents, winds and waves.
摘要:
Provided is an assembly unit including 3×N (here, N is a natural number) number of polygonal surface parts, which extend in a vertical direction and have flat surfaces, connecting parts connecting end portions, which are adjacent to each other, of end portions of each of the polygonal surface parts, and coupling protrusions respectively protruding from the polygonal surface parts in a horizontal direction that is perpendicular to the vertical direction. The three polygonal surface parts in a clockwise direction are defined as one set, and the coupling protrusions respectively have formation positions that sequentially increase in height within the one set in the vertical direction.
摘要:
Dams are a useful source of energy. An embodiment of a dam according to the present invention includes precast segments configured to be coupled together to form a dam optionally used to generate energy. An embodiment includes encasing an existing dam structure using interconnected precast segments. An underpinning system may penetrate the existing dam structure and be employed to assist in maintaining position of the dam or segmental components. A further embodiment includes encasing a main energy generation component using interconnected precast segments formed from a composite material including electrically conducting fibers, an electric circuit configured to measure and report the electrical resistance using a transmitter or transceiver to a dam stress/strain monitoring server. The electrical circuit may be powered directly or indirectly by available power supplied by the main energy generation component.
摘要:
Disclosed is a retaining wall construction system for preventing tsunamis and flood damages and a construction method thereof. The retaining wall construction system includes hexagonal multi-layered interlocking blocks built in a plurality of lines for forming a retaining wall, wherein S-shaped connection sections are formed on an outer periphery for a plurality of interlocking blocks, and hexagonal multi-layered interlocking blocks, which are adjacent to each other and different from each other, are connected to each other via the S-shaped connection sections to be movable in the vertical direction.