Ecological slope protection with efficient water purification function and ecological improvment method

    公开(公告)号:US12012711B2

    公开(公告)日:2024-06-18

    申请号:US17416258

    申请日:2019-03-28

    申请人: FUDAN UNIVERSITY

    摘要: An ecological slope protection has an efficient water purification function, built in a land-lake ecozone along the bank of a basin, wherein the body of the ecological slope protection extends into the water of the basin, and has a flexible mattress laid on the surface thereof; an ecological filter pool is provided below the flexible mattress and is isolated from the water of the basin by means of the pool body; the ecological filter pool is contained with a filler layer and a support layer, and the filler layer is supported by the support layer; the sewage pretreated via a sedimentation pool is introduced into the ecological filter pool and treated by the filler layer to clean up pollutants therein and reduce its eutrophication level; and the treated sewage is discharged from the ecological slope protection via the support layer and enters the basin.

    SECTIONAL REINFORCED CONCRETE SEAWALL
    2.
    发明公开

    公开(公告)号:US20240026622A1

    公开(公告)日:2024-01-25

    申请号:US18375322

    申请日:2023-09-29

    申请人: Donald E. BRADE

    发明人: Donald E. BRADE

    IPC分类号: E02B3/06 E02B3/14 E02D29/02

    CPC分类号: E02B3/06 E02B3/14 E02D29/0266

    摘要: A seawall section includes a central hub having an axis extending in a longitudinal direction and three circumferentially spaced walls extending radially from the central hub. Each of the walls is made of cast concrete reinforced with a rebar cage having a plurality of longitudinally spaced pairs of parallel rebars extending radially from the central hub to an end rebar that extends perpendicularly relative to the parallel rebars. Each end rebar is connected to radially outer ends of one of the pairs of parallel rebars. A seawall comprises a plurality of the seawall sections connected together end-to-end with a cable, and connecting plates fastened to adjacent sections. A form for manufacturing the seawall section encloses connected rebars and is filled with concrete.

    BLOCK FOR PREVENTING SAND EROSION
    3.
    发明申请

    公开(公告)号:US20180363263A1

    公开(公告)日:2018-12-20

    申请号:US15502107

    申请日:2016-11-14

    申请人: JunHo CHO HeeSung CHO

    IPC分类号: E02B3/14

    摘要: The present invention relates to a block structure for preventing sand erosion, more specifically to a block structure for preventing sand erosion, which is positioned in the sea, collects sand pushed into sea according to flow of low tide and pushes the collected sand toward coast or coastal side at high tide in coast or s-a near coast according to flow of wave.

    Bricks and a method for using such bricks to build dikes in water

    公开(公告)号:US09951491B2

    公开(公告)日:2018-04-24

    申请号:US15364247

    申请日:2016-11-29

    申请人: Tsun Chow

    发明人: Tsun Chow

    摘要: The present invention discloses a brick, comprising a brick body, which comprises at least one slot position for connecting a column, and a method for using the bricks to build dikes in water, including the following steps: (1) drilling a plurality of pile holes at water bottom; (2) casting concrete into each of the pile holes to form concrete columns; (3) stacking up a number of the bricks along the concrete columns and having them tightly connected to form a wall; (4) filling the clearances between the concrete columns and the bricks with mortar. The bricks and dike building method provided by the present invention are suitable for direct over-water dike building, the construction is fast and the dikes built are firm and stable, have superior waterproof function and can effectively prevent the impact of currents, winds and waves.

    Bricks and a method for using such bricks to build dikes in water

    公开(公告)号:US09695563B1

    公开(公告)日:2017-07-04

    申请号:US15194557

    申请日:2016-06-27

    申请人: Tsun Chow

    发明人: Tsun Chow

    摘要: The present invention discloses a brick, comprising a brick body, which comprises at least one slot position for connecting a column, and a method for using the bricks to build dikes in water, including the following steps: (1) drilling a plurality of pile holes at water bottom; (2) casting concrete into each of the pile holes to form concrete columns; (3) stacking up a number of the bricks along the concrete columns and having them tightly connected to form a wall; (4) filling the clearances between the concrete columns and the bricks with mortar. The bricks and dike building method provided by the present invention are suitable for direct over-water dike building, the construction is fast and the dikes built are firm and stable, have superior waterproof function and can effectively prevent the impact of currents, winds and waves.

    Intelligent hydroelectric dam with power storage
    9.
    发明授权
    Intelligent hydroelectric dam with power storage 有权
    智能水力发电大坝蓄电

    公开(公告)号:US09103084B2

    公开(公告)日:2015-08-11

    申请号:US13827020

    申请日:2013-03-14

    摘要: Dams are a useful source of energy. An embodiment of a dam according to the present invention includes precast segments configured to be coupled together to form a dam optionally used to generate energy. An embodiment includes encasing an existing dam structure using interconnected precast segments. An underpinning system may penetrate the existing dam structure and be employed to assist in maintaining position of the dam or segmental components. A further embodiment includes encasing a main energy generation component using interconnected precast segments formed from a composite material including electrically conducting fibers, an electric circuit configured to measure and report the electrical resistance using a transmitter or transceiver to a dam stress/strain monitoring server. The electrical circuit may be powered directly or indirectly by available power supplied by the main energy generation component.

    摘要翻译: 大坝是一个有用的能源。 根据本发明的坝的一个实施例包括预制件段,其构造成联接在一起以形成可选地用于产生能量的坝。 一个实施例包括使用相互连接的预制件段包围现有的坝结构。 支撑系统可能渗透现有的坝体结构,并用于协助保持坝体或节段构件的位置。 另一实施例包括使用由包括导电纤维的复合材料形成的互连的预制区段来包围主能量产生部件,电路被配置为使用发射器或收发器测量并报告电阻到大坝应力/应变监测服务器。 电路可以由主能量产生部件提供的可用功率直接或间接供电。

    Retaining wall construction system for preventing tsunamis and flood damages and construction method thereof
    10.
    发明授权
    Retaining wall construction system for preventing tsunamis and flood damages and construction method thereof 有权
    防止海啸和洪水破坏的墙体施工系统及其施工方法

    公开(公告)号:US09080298B2

    公开(公告)日:2015-07-14

    申请号:US13817594

    申请日:2010-09-08

    摘要: Disclosed is a retaining wall construction system for preventing tsunamis and flood damages and a construction method thereof. The retaining wall construction system includes hexagonal multi-layered interlocking blocks built in a plurality of lines for forming a retaining wall, wherein S-shaped connection sections are formed on an outer periphery for a plurality of interlocking blocks, and hexagonal multi-layered interlocking blocks, which are adjacent to each other and different from each other, are connected to each other via the S-shaped connection sections to be movable in the vertical direction.

    摘要翻译: 公开了一种防止海啸和洪水破坏的挡土墙施工系统及其施工方法。 挡土墙施工系统包括用于形成挡土墙的内置多条线的六角形多层互锁块,其中S形连接段形成在多个互锁块的外周上,六边形多层互锁块 彼此相邻且彼此不同,经由S形连接部彼此连接,以能够在垂直方向上移动。