HIGH LEVEL CENTRAL PLANT OPTIMIZATION
    1.
    发明申请
    HIGH LEVEL CENTRAL PLANT OPTIMIZATION 审中-公开
    高层次中央工厂优化

    公开(公告)号:US20150316902A1

    公开(公告)日:2015-11-05

    申请号:US14634609

    申请日:2015-02-27

    IPC分类号: G05B13/02 G05F1/66

    摘要: An optimization system for a central plant includes a processing circuit configured to receive load prediction data indicating building energy loads and utility rate data indicating a price of one or more resources consumed by equipment of the central plant to serve the building energy loads. The optimization system includes a high level optimization module configured to generate an objective function that expresses a total monetary cost of operating the central plant over an optimization period as a function of the utility rate data and an amount of the one or more resources consumed by the central plant equipment. The high level optimization module is configured to optimize the objective function over the optimization period subject to load equality constraints and capacity constraints on the central plant equipment to determine an optimal distribution of the building energy loads over multiple groups of the central plant equipment.

    摘要翻译: 用于中央设备的优化系统包括处理电路,其被配置为接收指示建筑物能量负载的负荷预测数据和表示中央设备的设备消耗的一个或多个资源的价格的效用率数据,以用于建筑物能量负荷。 优化系统包括高级优化模块,其被配置为生成目标函数,该目标函数表示在优化周期内操作中央工厂的总货币成本,作为效用率数据的函数,以及所述一个或多个资源消耗的量 中央工厂设备。 高级优化模块被配置为在优化周期内优化目标函数,这受到中央设备设备上的负载均衡约束和容量限制,以确定建筑物能量负载在多组中央设备设备上的最佳分布。

    INCORPORATING A LOAD CHANGE PENALTY IN CENTRAL PLANT OPTIMIZATION
    2.
    发明申请
    INCORPORATING A LOAD CHANGE PENALTY IN CENTRAL PLANT OPTIMIZATION 审中-公开
    在中央工厂优化中加入负担变更惩罚

    公开(公告)号:US20150316946A1

    公开(公告)日:2015-11-05

    申请号:US14634573

    申请日:2015-02-27

    IPC分类号: G05F1/66 G05B13/02

    摘要: An optimization system for a central plant includes a processing circuit configured to receive load prediction data indicating building energy loads and utility rate data indicating a price of one or more resources consumed by equipment of the central plant to serve the building energy loads. The optimization system includes a high level optimization module configured to generate an objective function that expresses a total monetary cost of operating the central plant over the optimization period as a function of the utility rate data and an amount of the one or more resources consumed by multiple groups of the central plant equipment. The optimization system includes a load change penalty module configured to modify the objective function to account for a load change penalty resulting from a change in an amount of the building energy loads assigned to one or more of the groups of central plant equipment.

    摘要翻译: 用于中央设备的优化系统包括处理电路,其被配置为接收指示建筑物能量负载的负荷预测数据和表示中央设备的设备消耗的一个或多个资源的价格的效用率数据,以用于建筑物能量负荷。 所述优化系统包括高级优化模块,其被配置为生成目标函数,所述目标函数表示在所述优化周期内操作所述中心工厂的总货币成本,作为所述效用率数据的函数以及多个所消耗的所述一个或多个资源的量 集团的中央设备设备。 优化系统包括负载变化罚款模块,其被配置为修改目标函数以解决由分配给一组或多组中央工厂设备的建筑物能量负荷的量的变化导致的负荷变化损失。

    PRODUCTION MANAGEMENT DEVICE, PRODUCTION MANAGEMENT SYSTEM, METHOD OF CONTROLLING PRODUCTION MANAGEMENT DEVICE, CONTROL PROGRAM, AND RECORDING MEDIUM
    3.
    发明申请
    PRODUCTION MANAGEMENT DEVICE, PRODUCTION MANAGEMENT SYSTEM, METHOD OF CONTROLLING PRODUCTION MANAGEMENT DEVICE, CONTROL PROGRAM, AND RECORDING MEDIUM 审中-公开
    生产管理装置,生产管理系统,控制生产管理装置的方法,控制程序和记录介质

    公开(公告)号:US20130282415A1

    公开(公告)日:2013-10-24

    申请号:US13884757

    申请日:2011-03-23

    IPC分类号: G06Q10/06

    摘要: Disclosed is a production management device configured to monitor the state of a production device which, by consuming a resource (electric power and so forth) produces a product with a change in a physical amount (temperature and so forth) in the production environment. The production management device includes an environment change physical amount measurement unitconfigured to acquire as environment change physical amounts the physical amount of the production environment that has been changed by the production device consuming the resource, and a state determining unit configured to determine the state of the production device in response to the acquired environment change physical amounts.

    摘要翻译: 公开了一种生产管理装置,其被配置为通过消耗资源(电力等)产生具有生产环境中的物理量(温度等)的变化的产品来监视生产装置的状态。 生产管理装置包括环境变化物理量测量单元,其被配置为获取作为环境变化物理量的由生产设备改变的生产环境的物理量消耗资源;以及状态确定单元,被配置为确定 生产装置响应于获得的环境变化物理量。

    INCORPORATING A DEMAND CHARGE IN CENTRAL PLANT OPTIMIZATION
    4.
    发明申请
    INCORPORATING A DEMAND CHARGE IN CENTRAL PLANT OPTIMIZATION 审中-公开
    在中央工厂优化中纳入需求费用

    公开(公告)号:US20150316901A1

    公开(公告)日:2015-11-05

    申请号:US14634599

    申请日:2015-02-27

    IPC分类号: G05B13/02 G05F1/66

    摘要: An optimization system for a central plant includes a processing circuit configured to receive load prediction data indicating building energy loads and utility rate data indicating a price of one or more resources consumed by equipment of the central plant to serve the building energy loads. The optimization system includes a high level optimization module configured to generate an objective function that expresses a total monetary cost of operating the central plant over an optimization period as a function of the utility rate data and an amount of the one or more resources consumed by the central plant equipment. The optimization system includes a demand charge module configured to modify the objective function to account for a demand charge indicating a cost associated with maximum power consumption during a demand charge period. The high level optimization module is configured to optimize the objective function over the demand charge period.

    摘要翻译: 用于中央设备的优化系统包括处理电路,其被配置为接收指示建筑物能量负载的负荷预测数据和表示中央设备的设备消耗的一个或多个资源的价格的效用率数据,以用于建筑物能量负荷。 优化系统包括高级优化模块,其被配置为生成目标函数,该目标函数表示在优化周期内操作中央工厂的总货币成本,作为效用率数据的函数,以及所述一个或多个资源消耗的量 中央工厂设备。 所述优化系统包括需求费用模块,所述需求费用模块被配置为修改所述目标函数以考虑在需求充电期间指示与最大功耗相关联的成本的需求费用。 高级优化模块被配置为在需求充电期间优化目标函数。

    SYSTEMS AND METHODS FOR VISUALIZING EQUIPMENT UTILIZATION IN A CENTRAL PLANT
    6.
    发明申请
    SYSTEMS AND METHODS FOR VISUALIZING EQUIPMENT UTILIZATION IN A CENTRAL PLANT 审中-公开
    用于在中央工厂可视化设备利用的系统和方法

    公开(公告)号:US20170031962A1

    公开(公告)日:2017-02-02

    申请号:US14815845

    申请日:2015-07-31

    摘要: A system for visualizing equipment utilization in a central plant includes a subplant monitor, a subplant utilization database, and a dispatch graphical user interface (GUI) generator. The subplant monitor receives subplant utilization data including an indication of a thermal energy load served by each of a plurality of subplants of the central plant. The subplant utilization database stores the subplant utilization data for each of a plurality of time steps. The dispatch GUI generator generates a dispatch GUI using the subplant utilization data. The dispatch GUI includes an indication of the thermal energy load served by each of the plurality of subplants for each of the plurality of time steps. The dispatch GUI may include a set of stacked bars for each of the time steps. Each of the stacked bars may represent the thermal energy load served by one of the subplants during a corresponding time step.

    摘要翻译: 用于在中央设备中可视化设备利用的系统包括一个子站监视器,​​一个子站利用数据库和一个调度图形用户界面(GUI)生成器。 该种植体监测器接收包括由中央植物的多个植入物中的每一个施加的热能负荷的指示的植入物利用数据。 子站利用数据库存储多个时间步骤中的每一个的子站利用数据。 调度GUI生成器使用子站利用率数据生成调度GUI。 调度GUI包括针对多个时间步骤中的每一个的多个子选项中的每一个所服务的热能负荷的指示。 调度GUI可以包括用于每个时间步长的一组堆叠的条。 每个堆叠的条可以表示在相应的时间步骤期间其中一个子步骤所服务的热能负荷。

    BUILDING MANAGEMENT SYSTEM FOR FORECASTING TIME SERIES VALUES OF BUILDING VARIABLES
    7.
    发明申请
    BUILDING MANAGEMENT SYSTEM FOR FORECASTING TIME SERIES VALUES OF BUILDING VARIABLES 审中-公开
    建筑管理系统预测建筑变量的时间序列值

    公开(公告)号:US20150316907A1

    公开(公告)日:2015-11-05

    申请号:US14717593

    申请日:2015-05-20

    IPC分类号: G05B13/04 G06N99/00

    摘要: A building management system (BMS) includes sensors that measure time series values of building variables and a deterministic model generator that uses historical values for the time series of building variables to train a deterministic model that predicts deterministic values for the time series. The BMS includes a stochastic model generator that uses differences between actual values for the time series and the predicted deterministic values to train a stochastic model that predicts a stochastic value for the time series. The BMS includes a forecast adjuster that adjusts the predicted deterministic values using the predicted stochastic value to generate an adjusted forecast for the time series. The BMS includes a demand response optimizer that uses the adjusted forecast to generate an optimal set of control actions for building equipment of the BMS. The building equipment operate to affect the building variables.

    摘要翻译: 建筑物管理系统(BMS)包括测量建筑变量的时间序列值的传感器和确定性模型生成器,其使用建筑变量的时间序列的历史值来训练预测时间序列的确定性值的确定性模型。 BMS包括使用时间序列的实际值和预测的确定值之间的差异来训练预测时间序列的随机值的随机模型的随机模型发生器。 BMS包括预测调节器,其使用预测的随机值来调整预测的确定值,以产生时间序列的调整后的预测。 BMS包括需求响应优化器,其使用经调整的预测来生成用于建立BMS设备的最佳控制动作集合。 建筑设备操作以影响建筑变量。

    METHOD AND A SYSTEM FOR ENERGY BENCHMARKING FOR GAP ANALYSIS FOR A PLANT IN A PAPER INDUSTRY
    8.
    发明申请
    METHOD AND A SYSTEM FOR ENERGY BENCHMARKING FOR GAP ANALYSIS FOR A PLANT IN A PAPER INDUSTRY 审中-公开
    纸业工厂用于GAP分析的能量标定方法与系统

    公开(公告)号:US20130185120A1

    公开(公告)日:2013-07-18

    申请号:US13789041

    申请日:2013-03-07

    申请人: ABB Research Ltd

    IPC分类号: G06Q10/06

    摘要: Methods and systems for energy benchmarking for gap analysis are disclosed, for example, for a plant in a paper industry having at least one equipment. The method can include a) monitoring the performance parameter of one or more equipments of the plant and/or of one or more other plants and/or of the plant or other plants, the performance parameter being evaluated from design data or plant model or historical operating data or current operating data; b) comparing at least one performance parameter against at least one other performance parameter of the at least one equipment of the one plant or other plant, or of the one plant or at least one other plant or a combination thereof; c) selecting one of the performance parameters from the at least one or other performance parameters being compared; d) setting the value of the selected performance parameter as a benchmark; and e) controlling the plant based on the benchmark.

    摘要翻译: 公开了用于差距分析的能量基准的方法和系统,例如,对于具有至少一个设备的造纸工业的工厂。 该方法可以包括:a)监测工厂和/或一个或多个其它设备和/或工厂或其他设备的一个或多个设备的性能参数,性能参数由设计数据或工厂模型或历史 操作数据或当前操作数据; b)将至少一个性能参数与一个植物或其他植物或一个植物或至少一个其它植物的至少一个设备或其组合的至少一个其它性能参数进行比较; c)从所比较的至少一个或其它性能参数中选择一个性能参数; d)将所选性能参数的值设置为基准; 和e)基于基准控制工厂。

    POWER CONSUMPTION DISPLAY UNIT FOR MACHINE TOOL
    9.
    发明申请
    POWER CONSUMPTION DISPLAY UNIT FOR MACHINE TOOL 有权
    机床用功耗显示单元

    公开(公告)号:US20120109551A1

    公开(公告)日:2012-05-03

    申请号:US13273412

    申请日:2011-10-14

    IPC分类号: G01R21/133 G06F19/00

    摘要: A power consumption display unit for a machine tool includes: machining state determining means for determining, when a main power switch used to supply power to a machine tool is ON, whether the machine tool is in a machining state where a machining program is executed to machine a workpiece or in a non-machining state where the machining program is not executed; power consumption measuring means for measuring a power consumption of the machine tool during a period where the machine tool is determined to be in the non-machining state by the machining state determining means; and display means for displaying the power consumption measured by the power consumption measuring means.

    摘要翻译: 一种用于机床的功耗显示单元包括:加工状态确定装置,用于当用于向机床供电的主电源开关为ON时,确定机床是否处于对加工程序执行的加工状态 加工工件或加工程序未执行的非加工状态; 功率消耗测量装置,用于在通过加工状态确定装置确定机床处于非加工状态的期间内测量机床的功耗; 以及显示装置,用于显示由功耗测量装置测量的功耗。

    Inferred energy usage and multiple levels of energy usage

    公开(公告)号:US09785126B2

    公开(公告)日:2017-10-10

    申请号:US14553461

    申请日:2014-11-25

    IPC分类号: G05B13/02 G05B13/04

    摘要: The present disclosure describes system and methods for inferring energy usage at multiple levels of granularity. One embodiment describes an industrial automation system including a first industrial automation component, a first sensor coupled to the first industrial automation component, in which the first sensor measures a first amount of power supplied to the first industrial automation component, a second industrial automation component that couples to the first industrial automation component, and an industrial control system that infers energy usage by the first industrial automation component and the second industrial automation component based at least in part on the first amount of power supplied to the first industrial automation component.