-
公开(公告)号:US12031524B2
公开(公告)日:2024-07-09
申请号:US17410911
申请日:2021-08-24
Applicant: Inventus Holdings, LLC
Inventor: Andres F. Girardot , George Alex Pantouris , Yi Li
IPC: F03D7/04 , F03D7/02 , G05B19/042 , G06N20/00 , G06F113/06
CPC classification number: F03D7/046 , F03D7/0224 , F03D7/0276 , F03D7/045 , G05B19/042 , G06N20/00 , F05B2200/13 , F05B2200/14 , F05B2200/211 , F05B2200/221 , F05B2220/30 , F05B2240/221 , F05B2260/74 , F05B2260/84 , F05B2270/101 , F05B2270/1033 , F05B2270/32 , F05B2270/323 , F05B2270/324 , F05B2270/325 , F05B2270/402 , G05B2219/2619 , G06F2113/06
Abstract: A system for generating power includes an environmental engine that determines performance metrics for a plurality of wind turbines deployed at a plurality of windfarms, such that each windfarm includes a corresponding subset of the plurality of windfarms. The performance metrics for a given wind turbine of the plurality of wind turbines characterizes wind flowing over blades of the given wind turbine. The system includes an artificial intelligence (AI) ensemble engine operating on the one or more computing devices that generates a set of models for each wind turbine of the plurality of wind turbines, wherein each model of each set of models is generated with a different machine learning algorithm and selects, for each respective set of models, a model with a highest efficiency metric. The AI engine provides edge computing systems operating at the plurality of windfarms with a selected model and corresponding recommended operating parameters.
-
公开(公告)号:US12118275B2
公开(公告)日:2024-10-15
申请号:US17270355
申请日:2019-08-08
Applicant: VESTAS WIND SYSTEMS A/S
Inventor: Juan Pablo Murcia
IPC: G06F30/13 , F03D80/00 , G06F111/04 , G06F111/08 , G06F113/06
CPC classification number: G06F30/13 , F03D80/00 , F05B2260/84 , G06F2111/04 , G06F2111/08 , G06F2113/06
Abstract: The invention provides a method for determining a wind turbine layout in a wind power plant comprising a plurality of wind turbines. The method comprises the steps of generating a plurality of random layout candidates fulfilling a set of basic requirements, and then performing a pre screening process on each of the plurality of random layout candidates. Based on the pre-screening process, a subset of layout candidates is selected and detailed optimization is performed on the layout candidates of the selected subset of layout candidates. Based on the detailed optimization, an optimized layout for the wind power plant is selected among the optimized layout candidates of the subset of layout candidates.
-
公开(公告)号:US20240354468A1
公开(公告)日:2024-10-24
申请号:US18137015
申请日:2023-04-20
Applicant: Renew-Risk Limited
Inventor: Subhamoy Bhattacharya , Gaurav Chawla , Joshua Macabuag , Ashima Gupta
IPC: G06F30/23
CPC classification number: G06F30/23 , G06F2111/10 , G06F2113/06
Abstract: A method of determining an average duration for a time period that the at least one first asset, or a second asset operatively connected to the at least one first asset, is inoperable is described. The method comprises obtaining a location of at least one first asset associated with energy generation, transmission or storage. The method comprises obtaining a first probability of a natural adverse event occurring at the location of the at least one first asset. The method comprises obtaining a second probability of a non-natural adverse event occurring at the location of the at least one first asset. The method comprises determining a third probability of at least one damage state of the at least one first asset from the first and second probabilities. The method comprises determining an average duration for a time period that the at least one first asset, or a second asset operatively connected to the at least one first asset, is inoperable based on the third probability of the at least one damage state of the first asset.
-
4.
公开(公告)号:US11669663B2
公开(公告)日:2023-06-06
申请号:US17953382
申请日:2022-09-27
Applicant: ZHEJIANG UNIVERSITY
Inventor: Xiaoyu Tang , Kunwei Lin
IPC: G06F30/28 , F03D7/04 , G06F113/06
CPC classification number: G06F30/28 , F03D7/048 , F05B2270/204 , G06F2113/06
Abstract: Disclosed is a wind turbine layout optimization method combining with a dispatching strategy for the wind farm. In the wind farm micro-siting stage, the installed wind turbines number and the arrangement positions are optimized. In this method, the dispatching strategy of wind turbines is considered during the layout optimization of wind turbines, and the axial induction factor of each wind turbine is introduced into the layout optimization variables. The dispatching strategy of maximizing the wind farm power generation is combined with the layout optimization of wind turbines in the construction stage of the wind farm, so that the wake effect is effectively reduced and the capacity cost is reduced, which meet the requirement of actual wind farm. A hybrid optimization algorithm is proposed in this method, with a greedy algorithm to optimize the turbine number and a particle swarm optimization (PSO) algorithm to refine the turbine layout scheme.
-
公开(公告)号:US12091985B2
公开(公告)日:2024-09-17
申请号:US17879165
申请日:2022-08-02
Applicant: General Electric Company
IPC: F01D5/14 , F01D5/16 , F01D21/00 , G06F30/17 , G06F113/06
CPC classification number: F01D5/147 , F01D5/16 , G06F30/17 , F05D2220/32 , F05D2240/30 , F05D2250/21 , F05D2260/96 , F05D2300/605 , G06F2113/06
Abstract: An engine component for a turbine engine, the engine component comprising a wall bounding an interior; a panel portion defining a portion of the wall, the panel portion comprising: an outer wall; an inner wall spaced from the outer wall to define a wall gap; and a structural segment formed within the wall gap comprising at least one structural element. The apparatus formed from a method including calculating a factor and adjusting a variable until the factor is between a given range.
-
公开(公告)号:US11885305B2
公开(公告)日:2024-01-30
申请号:US17514061
申请日:2021-10-29
Applicant: IFP Energies nouvelles
IPC: F03D7/04 , F03D17/00 , G01P21/02 , G01P5/26 , G01S17/58 , G06F113/06 , G06F113/08
CPC classification number: F03D7/045 , F03D17/00 , G01P21/025 , F05B2260/821 , F05B2260/84 , F05B2270/32 , F05B2270/327 , F05B2270/328 , F05B2270/335 , F05B2270/8042 , G01P5/26 , G01S17/58 , G06F2113/06 , G06F2113/08
Abstract: The present invention relates to a method of determining the wind speed in the plane of a rotor (PR) of a wind turbine (1), by measuring (MES2) the rotational speed of the rotor, the angle of the blades and the generated power. The method according to the invention uses a wind turbine model (MOD) constructed from wind speed measurements (LID), and by use of measurement clustering (GRO) and regressions (REG).
-
公开(公告)号:US20240337249A1
公开(公告)日:2024-10-10
申请号:US18745330
申请日:2024-06-17
Applicant: Inventus Holdings, LLC
Inventor: Andres F. Girardot , George Alexander Pantouris , Yi Li
IPC: F03D7/04 , F03D7/02 , G05B19/042 , G06F113/06 , G06N20/00
CPC classification number: F03D7/046 , F03D7/0224 , F03D7/0276 , F03D7/045 , G05B19/042 , G06N20/00 , F05B2200/13 , F05B2200/14 , F05B2200/211 , F05B2200/221 , F05B2220/30 , F05B2240/221 , F05B2260/74 , F05B2260/84 , F05B2270/101 , F05B2270/1033 , F05B2270/32 , F05B2270/323 , F05B2270/324 , F05B2270/325 , F05B2270/402 , G05B2219/2619 , G06F2113/06
Abstract: A system for generating power includes an environmental engine that determines performance metrics for a plurality of wind turbines deployed at a plurality of windfarms, such that each windfarm includes a corresponding subset of the plurality of windfarms. The performance metrics for a given wind turbine of the plurality of wind turbines characterizes wind flowing over blades of the given wind turbine. The system includes an artificial intelligence (AI) ensemble engine operating on the one or more computing devices that generates a set of models for each wind turbine of the plurality of wind turbines, wherein each model of each set of models is generated with a different machine learning algorithm and selects, for each respective set of models, a model with a highest efficiency metric. The AI engine provides edge computing systems operating at the plurality of windfarms with a selected model and corresponding recommended operating parameters.
-
公开(公告)号:US20240271600A1
公开(公告)日:2024-08-15
申请号:US18438401
申请日:2024-02-10
Applicant: VayuAl Corp.
Inventor: James Kiles , Patrick Hompe , August Kiles , Gelu Vrabie
CPC classification number: F03D7/048 , F03D7/0204 , F03D13/25 , G06F2113/06
Abstract: A computer system optimizes site planning for turbines at a wind farm site, by obtaining land-based characteristics of the wind farm site, wind-based characteristics of the wind farm site, including a distribution of wind velocity and wind direction across the wind farm site over time; a number of turbines to be added; and characteristics for each of the turbines. For each turbine, the system simulates a plurality of wakes at a plurality of locations based on the wind-based characteristics and the turbine-based characteristics; determines power outputs based on the simulated wakes and aforementioned characteristics, determines successive locations of the turbine locations according by applying a gradient descent to the power outputs. The system aggregates the maximum power outputs of each turbine and displays an optimized location and final yaw angle corresponding to each turbine.
-
公开(公告)号:US20240054267A1
公开(公告)日:2024-02-15
申请号:US17766504
申请日:2020-09-14
Applicant: VESTAS WIND SYSTEMS A/S
Inventor: Martin QVIST , Ana Maria Martinez FERNANDEZ , Hans Harhoff ANDERSEN , Hjalte Vinther KIEFER
CPC classification number: G06F30/27 , H02J3/004 , G06F2113/06
Abstract: Correlated sets of historical meteorological data and terrain data are obtained for at least one geographical area. A data model is derived based on the basis of the correlated sets, by training the data model. The trained data model is adapted to identify coherence between meteorological data and terrain data relating to the same geographical area. Meteorological data and terrain data related to the renewable energy site are fed to the trained data model, the terrain data having a higher resolution than the meteorological data. Using the trained model, meteorological data related to the renewable energy site with increased resolution is estimated by downscaling the meteorological data. The estimated meteorological data with increased resolution for the renewable energy site is then used for planning a layout of the renewable energy site.
-
公开(公告)号:US11714934B2
公开(公告)日:2023-08-01
申请号:US16904959
申请日:2020-06-18
Applicant: The Governors of the University of Alberta
Inventor: Sayed Ali Khajehoddin , Ahmadreza Tabesh , Navid Shabanikia
IPC: G06F30/20 , F03D9/25 , G06F113/06
CPC classification number: G06F30/20 , F03D9/257 , G06F2113/06
Abstract: A method of modeling an equivalent wind turbine generator (WTG) system for a wind farm having a plurality of WTG units includes determining an impact factor of each WTG unit of the plurality of WTG units, determining an equivalent single WTG unit model parameters of the wind farm based on the impact factor of each WTG unit, and determining an effective wind speed of the wind farm to use as the equivalent WTG input wind speed. The method produces a model of static and/or dynamic wind farm behavior. Additionally, a software configured to execute a method of modeling an equivalent wind turbine generator (WTG) system for a wind farm having a plurality of WTG units.
-
-
-
-
-
-
-
-
-