摘要:
In determining whether a rack inputted to the automatic analyzer by the user is to be transferred to an analysis section or not, samples existing in a route from a buffer to a sample dispensing position in the analysis section are identified, and the number of items in which suction by a nozzle has not been completed in analysis items requested for the samples is managed. When the number of items is reduced to be smaller than a given number, the conveyance of a next rack from the buffer to the analysis section is controlled, thereby limiting the number of analysis items requested for samples in a waiting state for analysis in the analysis section constantly to be smaller than a fixed number. As a result, a period of time until a measurement result of emergency samples is outputted can be reduced even when emergency samples are newly inputted.
摘要:
An object of the present invention is to prevent an unnecessary large amount of hydraulic oil from being supplied to a cylinder when a working vehicle capable of performing both a loading operation and a digging operation is performing the digging operation. When one or a plurality of first digging operation conditions are satisfied and when a second operation condition that it is not detected that the loading operation is being performed is also satisfied, a control unit executes fluid amount reduction control of reducing the amount of hydraulic oil supplied from a first pump to a cylinder that actuates a work equipment.
摘要:
A control device for a work machine on a construction vehicle is provided so that a bucket cylinder is stopped at a target position, with high accuracy achieved in a bucket cylinder length, and with chock held down to a low level. A bucket cylinder length detection section refereces a cylinder length detection table on the basis of a boom angle and a bell crank angle, thereby detecting a bucket cylinder length. A bucket attitude control section controls the bucket cylinder length so that a target position will be reached. Feedback control is performed until a set value which is set short of a target value is reached. After the bucket cylinder length reaches the set value, open loop control is performed until the target value is reached.
摘要:
The construction vehicle is provided with an engine, a clutch, a travel device, a work equipment, a drive force setting dial, and a controller that includes: a theoretical value determination unit that determines a theoretical value, for the degree of engagement to make the upper limit value of the drive force equal to a set drive force; an operational state determination unit that determines whether the work equipment is outputting the drive force in a predetermined travel direction; a drive force determination unit that determines whether the drive force is greater than the set drive force; and a degree of engagement reduction unit that, if of operational state determination and of drive force determination are both affirmative, causes the degree of engagement to approach the theoretical value.
摘要:
An object of the present invention is to prevent an unnecessary large amount of hydraulic oil from being supplied to a cylinder when a working vehicle capable of performing both a loading operation and a digging operation is performing the digging operation.When one or a plurality of first digging operation conditions are satisfied and when a second operation condition that it is not detected that the loading operation is being performed is also satisfied, a control unit executes fluid amount reduction control of reducing the amount of hydraulic oil supplied from a first pump to a cylinder that actuates a work equipment.
摘要:
A process for producing a sound absorber having skin layers constituting front and back surfaces and, interposed between the skin layers, a void layer having a number of voids, and having a plurality of formed holes each having a depth which is enough to penetrate one of the skin layers and is not enough to reach the other skin layer; comprising: providing a mold having a fixed part, a movable part, and at least one pin disposed in a manner that it can be projected into and retracted from a cavity; and having a step to cause the pin to project into the cavity during the course of charging the cavity with a resin material and molding the sound absorber and form the holes communicating with the void layer simultaneously with molding of the sound absorber.
摘要:
The present invention provides a structure for closing a track rail mounting hole, which prevents a closing cap from being press-fitted with an inclined state into the rail mounting hole, thereby being capable of positively preventing formation of a gap between the rail mounting hole and the closing cap. The closing cap (70) includes: a fitting portion (71) having an outer diameter larger than an inner diameter of the rail mounting hole (11b), to be press-fitted into the rail mounting hole (11b); and a leading end portion (72) to be inserted into the rail mounting hole (11b) before press-fitting the fitting portion (71) into the rail mounting hole (11b), for provisionally positioning the closing cap (70) with respect to the rail mounting hole (11b). The leading end portion (72) is provided with a positioning protrusion (74), protruding from a periphery of the leading end portion (72) in a substantially triangular section to constitute a tip edge portion (75), the tip edge portion (75) having an outer diameter being set to be the same or slightly larger than the inner diameter of the rail mounting hole (11b).
摘要:
A TMR device comprising an antiferromagnetic layer made of an antiferromagnetic material containing Mn, a magnetization fixed layer made of a ferromagnetic material, a tunnel barrier layer made of a dielectric material, and a magnetization free layer made of a ferromagnetic material. An insulator material layer is inserted in the magnetization fixed layer at a distance from the antiferromagnetic material layer and the tunnel barrier layer. One material can be expressed by NX, where X is a first element selected from the group consisting of oxygen, nitrogen and carbon; and N is a second element, provided that the bonding energy between the first and the second elements is higher than the bonding energy between manganese and the first element. A second material can be expressed by MX, where M is an element selected from the group consisting of titanium, tantalum, vanadium, aluminum, europium, and scandium; and X is an element selected from the group consisting of oxygen, nitrogen and carbon. The tunnel magnetoresistance effect device suppresses the diffusion of Mn from the Mn based alloy constituting the antiferromagnetic material layer even after heat treatment is performed.
摘要:
A sound absorbing body 40 has a molded body 44 including two unexpanded layers 41, 42 and an expanded layer 43 having a number of voids and held between these unexpanded layers 41, 42, a plurality of holes 41A of a depth that passes through the unexpanded layer 41 and does not reach the other unexpanded layer 42 are formed at any positions on the molded body 44, a cross-sectional area of the hole 41A is in the range from 0.785 to 314 mm2, and the pitch is 1 mm or larger. Laminating a plurality of materials is not required, and both the sound absorbing capability and sound insulating capability can be secured by integral molding, and further, only unpleasant sounds can selectively be absorbed.
摘要:
A magnetoresistive element has a ferromagnetic double tunnel junction having a stacked structure of a first antiferromagnetic layer/a first ferromagnetic layer/a first dielectric layer/a second ferromagnetic layer/a second dielectric layer/a third ferromagnetic layer/a second antiferromagnetic layer. The second ferromagnetic layer that is a free layer consists of a Co-based alloy or a three-layered film of a Co-based alloy/a Ni—Fe alloy/a Co-based alloy. A tunnel current is flowed between the first ferromagnetic layer and the third ferromagnetic layer.