Abstract:
An enclosure for electronic assemblies is provided, with a first deck surface and a first side wall with a short side and a long side and a second deck surface, disposed such that it faces the first deck surface, and a second side wall, disposed such that it faces the first side wall, with a short side and a long side, as well as with a first venting element, which extends in the direction of the long side along one of both side walls, and a plurality of plug-in slots for electronic assemblies that are arranged in parallel to one another, whereby the electronic assemblies are disposed, in the plugged-in state, vertically to both long sides of both side walls, and the first deck surface includes, along the end oriented toward the first side wall, a first opening and the first venting element, on the enclosure's outer side of the first deck surface, is disposed at least partially above the first opening, and the first and/or the second deck surface includes a second opening, along the end that faces the second side wall, for entering or exiting air, so that the venting element generates in the interior of the enclosure an air current that preferably flows vertically to the surface of the side walls.
Abstract translation:提供了一种用于电子组件的外壳,其具有设置成使其面向第一甲板表面的第一甲板表面和具有短边和长边和第二甲板表面的第一侧壁以及设置成第二甲板表面的第二侧壁 其面向第一侧壁,具有短边和长边,以及沿着两个侧壁中的一个在长边方向上延伸的第一排气元件,以及多个插入槽 对于彼此平行布置的电子组件,由此电子组件以插入状态垂直地布置在两个侧壁的两个长边上,并且第一甲板表面沿着朝向第一 侧壁,第一开口和第一排气元件,位于第一甲板表面的外壳的外侧上,至少部分地设置在第一开口的上方,并且第一和/或第二甲板表面包括沿着 en d,其面向第二侧壁,用于进入或排出空气,使得排气元件在外壳的内部产生优选地垂直于侧壁表面流动的气流。
Abstract:
A circuit for simulating an electrical load at a terminal of a test circuit having at least one first switch and at least one second switch includes a third switch connected to the first switch of the test circuit via a first external connection point. A fourth switch is connected to the second switch of the test circuit via a second external connection point. The first switch and the second switch are connected via a shared, first internal connection point to the terminal of the test circuit and the third switch and the fourth switch are connected via a shared, second internal connection point such that that the first switch, the second switch, the third switch and the fourth switch form an H-bridge circuit. A voltage source is configured to provide the first and second external connection points with a supply voltage. A controllable voltage source is connected in a transverse bridge branch between the terminal and the second internal connection point. An inductance is active in the transverse bridge branch. A current-control unit is operable on the controllable voltage source so as to adjust, to a predetermined setpoint current, an actual current flowing over the terminal of the test circuit and over the transverse bridge branch.
Abstract:
A method is presented and described for testing of at least one electronic control system, in which the control system is connected via a data channel to a test device, at least one environmental model is calculated on the test device and the environmental model interacts with the control system by output of environment model data via the test device to the control system and by receiving control system data from the control system via the data channel. The method according to the invention executes on the test device at least one test model to influence the environment model and/or to calculate the environment model and/or the electronic control system, in which the test model or the test models is or are executed functionally independently of the environment model and, during test operation, synchronously with the environment model.
Abstract:
The invention relates to a process for the automatic matching of a control software component to a control unit net work in order to permit communication between control software components of the control unit network, whereby the control unit network-independent communication commands of a control software component in the program code are replaced by control unit network-dependent commands.
Abstract:
A method for controlling an operating mechanism using a manipulation unit, in which the operating mechanism includes at least one microcontroller, at least one memory with a plurality of memory cells and at least one first value in a first memory cell and at least one debug interface, and the debug interface exhibits a monitoring functionality for monitoring a program code executed by the operating mechanism and using the debug interface a first pre-set timepoint is detected when processing the program code and, using the information transmitted by the debug interface for the first timepoint to the manipulation unit, a trigger timepoint results for a processing routine through the manipulation unit (IN) and a second value is written using the debug interface by the manipulation unit using the processing routine for a second timepoint in the first memory cell before the first memory cell is read by the operating mechanism for a third timepoint.
Abstract:
The invention relates to a process for carrying out at least one task for calculating at least one signal to be simulated in real time by a task manager implemented on a data processing system with a real-time operating system in software, which manager periodically starts a task after a time period that is given or can be given which task calculates at least one output signal from at least one given input signal which output signal is a function of it, characterized in that a set of at least two different tasks with different calculation times for calculating the same at least one signal to be simulated is stored in an executable manner in the data processing system, and at least one minimal task has a calculation time shorter than the time period, in which the task manager starts at least one of the tasks from the set according to a stored strategy with which a calculation result of at least one of the tasks from the set is obtained while maintaining the real time within the given time period.
Abstract:
A system and method for testing and calibrating a control unit including a microcontroller includes an influencing device and an adaptation unit. The adaptation unit includes a memory that can store at least part of a data of a data communication between the influencing device and the control unit. The memory can be read from and/or written to by the microcontroller of the control unit when the control unit is in an on state.
Abstract:
The invention involves a process and system for testing a technical system, such as an electronic control devices. The system includes a data processing system for executing a test sequence stored in memory. The data processing system communicates with the technical system via an interface. Data is transmitted by the executed test sequence to the technical system and/or read by the technical system. The test sequence for executing a test may be graphically displayed. The test sequence may be composed of executable program blocks in a graphical hierarchic arrangement, wherein a simultaneous execution of program blocks of the same hierarchal level can be determined by graphically arranging the program blocks adjacent to one another, and by executing program blocks of a different hierarchic level subsequently one after the other, by graphically arranging the latter among each other in the display.
Abstract:
A computer-implemented method for real-time simulation of the operation of a specific electric motor by a simulator arithmetic unit comprising a programmable logic device on which a generic motor model is implemented. The method includes: providing a generic system of equations corresponding to the generic motor model; receiving specific information corresponding to the specific motor to be simulated for the generic system of equations and inputting this information into the generic system of equations; generating a specific library containing at least some of the arithmetic operations required for the matrix operations for calculating the operation of the specific motor; implementing references in the generic motor model to the arithmetic operations of the specific library required for real-time simulation of the operation of the specific electric motor; and simulating the operation of the specific electric motor by running the generic motor model on the simulator arithmetic unit.
Abstract:
Systems and methods for simulating gas flow dynamics of a real hydrogen fuel cell system using a computer, wherein the real hydrogen fuel cell system includes a gas container volume network having gas container volumes interconnected by gas transport lines. The method includes defining volume element and flow channel classes, defining a plurality of volume instances and a plurality of flow channel instances, for each flow channel instance, creating a first interconnection representation that defines a source container volume and a destination container volume for the flow channel instance, wherein the first interconnection representation mimics a portion of the gas container volume network of the real hydrogen fuel cell system, and simulating, using the first interconnection representation, a thermodynamic state for each of the volume instances, the thermodynamic state representing thermodynamic parameter(s) in each container volume of the gas container volume network of the real hydrogen fuel cell system.