Central plant control system with plug and play EMPC

    公开(公告)号:US10678227B2

    公开(公告)日:2020-06-09

    申请号:US15921955

    申请日:2018-03-15

    Abstract: Systems and methods for implementing an economic model predictive control (EMPC) strategy in any resource-based system include an EMPC tool. The EMPC tool is configured to present user interfaces to a client device. The EMPC tool is further configured to receive first user input including resources and subplants associated with a central plant. The EMPC tool is also configured to receive second user input including sinks and connections between central plant equipment. The EMPC tool also includes a data model extender configured to extend a data model to define new entities and/or relationships specified by user input. The EMPC tool also includes a high level EMPC algorithm configured to generate an optimization problem and an asset allocator configured to solve the resource optimization problem in order to determine optimal control decisions used to operate the central plant.

    COORDINATION OF MULTIPLE CHILLER PLANT APPLICATIONS WITHIN A BUILDING AUTOMATION SYSTEM

    公开(公告)号:US20170089597A1

    公开(公告)日:2017-03-30

    申请号:US14872074

    申请日:2015-09-30

    Abstract: A central plant includes at least a first subplant and a second subplant configured to serve a thermal energy load of a building. A controller for the central plant includes an equipment staging detector configured to detect a staging event for equipment of the second subplant and to determine when the staging event occurs. The controller includes a subplant staging evaluator configured to use input from the equipment staging detector to determine whether a predetermined time period has elapsed since the staging event for the equipment of the second subplant has occurred. The controller includes a subplant staging preventer configured to prevent the first subplant from staging equipment of the first subplant in response to a determination that the predetermined time period has not elapsed since the staging event for the equipment of the second subplant has occurred.

Patent Agency Ranking