Abstract:
The voltage deviation is converted into the time quantity with the first integration circuit for the voltage detection and the second integration circuit for the voltage detection. The current setting value and the current measurements are converted into the time quantity with the second integration circuit for the current control to which the first integration circuit for the current control from which the voltage value of the set current value corresponding is input and the voltage value of the value of the current of the inductor corresponding are input and it controls. And, the start of the first integration circuit for the current control is delayed with operation quantity signal generation circuit only at the time that the high-resolution evaluation or more than the start of the first integration circuit for the current control and corresponds to the voltage deviation.
Abstract:
It provides the effective power conversion control technique which it can control which it made use of a characteristic (nature) of each A/D converter in. It comprises the third control part including the third operating circuit it inputs signal from third A/D converter inputting the detecting signal which is different from the detecting signal which is the same as the detecting signal or the detecting signal and above third A/D converter, and to generate the third operating signal, and the above actuating management circuit manages the actuating of an above first control part and the second above control part and the third above control part.
Abstract:
Disclosed herein is a control device for a DC/DC converter, in which FB control and FF control are combined to estimate an output voltage of a nonlinear dynamic system while guaranteeing stability. The control device includes a FB controller which generates a first time value for switch-off timing as the amount of feedback control, a machine learning controller which generates a second time value for switch-off timing as the amount of FF control, and a difference time calculator which obtains a difference between the first time value and the second time value and transmits a difference signal to the drive circuit. The machine learning controller calculates a second time value by multiplying the deviation between the target value of the machine learning control and the estimation value from leaning history in certain sampling by α=A·e×p(−λ×n) (A: a factor (except for zero) for suppressing the first undershoot, λ: a factor (constant except for zero) for suppressing the second undershoot, and n: an integer indicating the nth sampling).
Abstract:
The frequency decision device determines frequency of the measured rectangular signal by simple and easy means. The frequency decision device inputs the measured rectangular signal that frequency (or period) changes dynamically. It generates a rectangular reference signal of predetermined on width τ synchronizing to the edge based on a positive going edge of this measured rectangle signal. And it watches the order of measured rectangle signal and falling edges of the rectangular reference signal. When this sequential order reversed, it detects that length of the ON time of ON time of the measured rectangle signal and the measured rectangular signal reversed.
Abstract:
A rising edge or a falling edge is finely adjusted, or a dead time and a period are adjusted with high accuracy. A waveform processing circuit includes: an integration circuit 11 receiving a rectangular or substantially-rectangular pulse and outputting a gradually increasing or decreasing signal obtained by integrating the pulse signal; a reference signal output circuit 12 outputting a constant value or a varying value as a reference signal; and a comparison circuit 13 comparing the output of the integration circuit with the output of the reference signal output circuit and outputting a pulse rising or falling at a timing when the difference between the outputs varies.
Abstract:
To detect a peak time of an exciting current of a transformer, a primary current corresponding to the peak time, or a variation time of the primary voltage, and to switch a switch after expiration of a predetermined period from the peak time, after the peak time occurs. A control apparatus 1 is applied to a power conversion circuit 2 which includes a switch circuit 23 including one switch or a plurality of switches and a transformer 21. The control apparatus includes: an output voltage detector 11 detecting a value of an output voltage of the power conversion circuit; an exciting current peak time generator 12 detecting a peak time of an exciting current of the transformer; a timing generator 13 generating a switching timing of the one switch or the plurality of switches. The timing generator 13 generates the switching timing of the one switch or the plurality of switches on the basis of the output voltage and the peak time.
Abstract:
Provided is a discharge lamp lighting device, which can control a load precisely while improving the practicability. When the difference of a count number (Nn) becomes a predetermined threshold value or less, a predictor circuit (35) predicts the timing, at which a current value (iQ1) becomes a peak value, on the basis of the rate of change of the difference. A switch selecting circuit (38), which is driven with a clock frequency higher than the sampling frequency of a first converter unit (32), turns off a field effect transistor (Q1) at the turn-off timing, and turns on a field effect transistor (Q2). A plurality of A/D converters (37a) are subjected to a multi-rate control, thereby to correct the threshold value of the predictor circuit (35) on the basis of the peak value of a lamp current (iOUT). Even if the peak values of current values (iQ1 and iQ2) are positioned for the sampling period of the first converter unit (32), the turn-off timings can be precisely set according to the current values (iQ1 and iQ2) without increasing the sampling frequency more than the necessary value. As a result, it is possible to improve the practicability and to control the lighting of a fluorescent lamp precisely.
Abstract:
The control accuracy equal with the case controlled according to a reference signal with a high clock frequency when the electric power is converted is obtained according to a reference signal with a low clock frequency.The quantity of signal S3 of the time that corresponds to the difference of EO in the output voltage to reference voltage EREF by circuit 12 of the generation of quantity of signal of time is generated synchronizing with reference timing signal S1.The phase generates the class of the phase-shift signal of n piece for which only [Cycle of S0/]/n is late one by one by phase-shift signal generation circuit 13, counter circuit 14, and digital addition circuit 15, these numbers are counted respectively, and the count value of n piece is added.The control signal S5 that corresponds to TON between when adding value ADD is input with decision circuit 16 of on time of the switch element and control signal generation circuit 17 and it turns it on is generated.