公开(公告)号:US20130245850A1
公开(公告)日:2013-09-19
申请号:US13801332
申请日:2013-03-13
IPC分类号: G06F1/26
CPC分类号: G06F1/26 , H02J3/005 , H02J3/32 , H02J3/381 , H02J13/0006 , Y02E40/72 , Y02E60/722 , Y04S10/12 , Y04S10/14
摘要: According to one embodiment, an electric power supply-and-demand control apparatus includes a measuring module which measures an output power characteristic of dispersed power sources arranged in various places in an electric power system. The electric power supply-and-demand control apparatus includes a determination module which determines based on the output power characteristic measured by the measuring module whether to set each of the dispersed power sources in various places as a dispatching object for an electric power supply-and-demand plan at a specific time on a specific date.
摘要翻译: 根据一个实施例,电力供需控制装置包括测量模块,该测量模块测量布置在电力系统中的各个位置的分散电源的输出功率特性。 电力供需控制装置包括:确定模块,其基于由测量模块测量的输出功率特性来确定是否将各个分散的电源设置在各个地方作为用于电力供应的调度对象;以及 在具体日期的特定时间设计。
-
公开(公告)号:US20120143386A1
公开(公告)日:2012-06-07
申请号:US13274862
申请日:2011-10-17
CPC分类号: H02J3/28 , H02J3/38 , H02J13/0006 , H02J13/0086 , Y02B70/3266 , Y02E40/72 , Y02E60/722 , Y04S10/12 , Y04S10/14 , Y04S20/242
摘要: A method of controlling the connection of a collection of a plurality of electricity providing devices to an electrical power network is described. In this, the plurality of electricity providing devices having a communication line therebetween and the method comprises receiving a message at a first electricity providing device from a controlling device and, in response to the message: connecting the first electricity providing device to the electrical power network; and sending, from the first electricity providing device to a second electricity providing device, a second message containing data in response to which the second electricity providing device is connected to the electrical power network.
摘要翻译: 描述了一种控制多个供电装置的集合到电力网络的连接的方法。 在这种情况下,多个电力提供装置之间具有通信线,并且该方法包括从控制装置在第一供电装置处接收消息,响应于该消息:将第一供电装置连接到电力网络 ; 以及从所述第一供电装置向第二供电装置发送第二消息,所述第二消息包含响应于所述第二供电装置连接到所述电力网络的数据。
-
73.
公开(公告)号:US20120089261A1
公开(公告)日:2012-04-12
申请号:US13071370
申请日:2011-03-24
申请人: Seong-Joong Kim
发明人: Seong-Joong Kim
IPC分类号: G06F1/26
CPC分类号: H02J13/0062 , H02J3/32 , Y02B90/222 , Y02E60/722 , Y02E60/7838 , Y04S10/14 , Y04S20/12 , Y04S40/124
摘要: A grid connected power storage system is disclosed. According to some aspects, an integration controller controlling a grid-connected power storage system may include a controller configured to change parallel data to be transmitted to a plurality of external devices to serial bit streams, change serial bit streams received from the plurality of external devices to parallel data, and output a path control signal that instructs a communication path of the serial bit streams. According to some aspects, a communication unit configured to change a communication path and a ground path of the serial bit streams according to the path control signal, and transmit and/or receive the serial bit streams through the changed communication path is provided. A number of isolators and interfaces for data communication with a plurality of external devices is reduced such that the structure of an integration controller may be simplified, and the size and production cost of the integration controller can be reduced.
摘要翻译: 公开了并网电力存储系统。 根据一些方面,控制并网电力存储系统的集成控制器可以包括控制器,其被配置为将要发送到多个外部设备的并行数据改变为串行比特流,改变从多个外部设备接收的串行比特流 到并行数据,并输出指示串行比特流的通信路径的路径控制信号。 根据一些方面,提供了一种通信单元,其被配置为根据路径控制信号改变串行比特流的通信路径和接地路径,并且通过改变的通信路径发送和/或接收串行比特流。 减少了与多个外部设备进行数据通信的多个隔离器和接口,从而可以简化集成控制器的结构,并且可以减小集成控制器的尺寸和生产成本。
-
公开(公告)号:US20120074909A1
公开(公告)日:2012-03-29
申请号:US13050590
申请日:2011-03-17
申请人: Yoshiyuki HONDO , Minoru Yonezawa
发明人: Yoshiyuki HONDO , Minoru Yonezawa
IPC分类号: H02J7/00
CPC分类号: H02J7/0021 , H02J3/32 , H02J7/0022 , H02J7/0057 , H02J7/042 , H02J13/0024 , Y02E60/722 , Y04S10/14
摘要: A power receiving unit receives power generated by power generating units via a power system. A power information acquiring unit acquires first system power information showing the proportion of power generated by each power generating unit in a first period. An intensity database stores environmental loading intensities for each power generating unit. A charge load intensity calculator calculates a charge load intensity which is a weighted sum of the environmental loading intensity corresponding to each power generating unit based on the proportion of each power generating unit in the first system power information. A charge/discharge judging unit determines to charge a storage unit in a first period when the charge load intensity is less than a reference value, and not to charge the storage unit in the other cases. A charge/discharge controller charges the storage unit in the first period when determined to charge the storage unit.
摘要翻译: 电力接收单元经由电力系统接收由发电单元生成的电力。 功率信息获取单元获取第一系统功率信息,其示出在第一周期中由每个发电单元产生的功率的比例。 强度数据库存储每个发电单元的环境负载强度。 充电负荷强度计算器基于第一系统功率信息中的每个发电单元的比例来计算作为与每个发电单元相对应的环境负荷强度的加权和的充电负荷强度。 充电/放电判断单元确定在充电负载强度小于参考值的第一时段中对存储单元充电,而在其他情况下不对存储单元充电。 充电/放电控制器在确定为存储单元充电时在第一时段内对存储单元进行充电。
-
公开(公告)号:US20120046798A1
公开(公告)日:2012-02-23
申请号:US13213082
申请日:2011-08-19
CPC分类号: H02J3/32 , H02J9/062 , H02J13/0075 , Y02B70/3291 , Y02B90/222 , Y02E60/722 , Y02E60/74 , Y04S10/14 , Y04S10/30 , Y04S20/12 , Y04S20/248
摘要: A system and method for shifting power load on a power distribution network with multiple power loads, each of which draws power from the power distribution network. The system includes a controller communicatively coupled to an energy storage system and power load on the power distribution network. The controller is configured to receive a load-shifting signal, determine a load-shifting procedure, and switch one or more of the communicatively coupled power loads from drawing power from the power distribution network to drawing power from the energy storage system according to a load-shifting algorithm.
摘要翻译: 一种用于在具有多个功率负载的配电网上移动功率负载的系统和方法,每个功率负载从配电网络中获取功率。 该系统包括通信地耦合到能量存储系统的控制器和配电网络上的电力负载。 控制器被配置为接收负载移动信号,确定负载移动过程,并且将来自配电网络的电力的一个或多个通信耦合的功率负载从能量存储系统根据负载 移位算法。
-
公开(公告)号:US20110156651A1
公开(公告)日:2011-06-30
申请号:US12709510
申请日:2010-02-21
CPC分类号: H02J7/02 , B60L3/0046 , B60L3/12 , B60L11/1816 , B60L11/184 , B60L11/1842 , B60L11/1844 , B60L11/1848 , B60L11/1861 , B60L2230/16 , H01M2010/4278 , H02J3/32 , H02J3/382 , H02J3/383 , H02J5/00 , H02J7/0004 , H02J13/0006 , H02J2007/0098 , Y02E10/563 , Y02E60/721 , Y02E60/722 , Y02E70/30 , Y02T10/7005 , Y02T10/7044 , Y02T10/705 , Y02T10/7094 , Y02T90/121 , Y02T90/128 , Y02T90/14 , Y02T90/163 , Y02T90/168 , Y02T90/169 , Y04S10/126 , Y04S10/14 , Y04S30/12 , Y04S30/14
摘要: An apparatus and method for transferring energy between a rechargeable battery and a power distribution network. The minimum final energy level may be determined at least in part from the historical energy levels and usage of the rechargeable battery. The time of day of charging the battery may be determined at least in part from information provided by the energy provider.
摘要翻译: 一种用于在可充电电池和配电网之间传送能量的装置和方法。 最小最终能量水平可以至少部分地根据可再充电电池的历史能量水平和使用来确定。 电池充电的时间可以至少部分地由能量提供者提供的信息确定。
-
77.
公开(公告)号:US20110074215A1
公开(公告)日:2011-03-31
申请号:US12891945
申请日:2010-09-28
CPC分类号: H02J3/32 , G01D4/004 , H02J3/12 , H02J3/18 , H02J13/0013 , H02J2003/001 , Y02B90/242 , Y02E40/30 , Y02E40/74 , Y02E60/722 , Y02E60/7807 , Y04S10/14 , Y04S10/22 , Y04S10/525 , Y04S20/322 , Y04S40/12 , Y10T307/505 , Y10T307/511 , Y10T307/516 , Y10T307/522 , Y10T307/527
摘要: The disclosed system includes a metering device for monitoring electrical power grid conditions, a controller for determining if the metering device is detecting a condition on an electrical grid that is indicative of a delayed voltage recovery event, and a communication device for communicating with one or more remotely located bi-directional power source modules connected to the electrical power grid, wherein the controller is programmed to send a notification via the communication device to the one or more remotely located bi-directional power source modules if the controller detects a condition indicative of delayed voltage recovery event. In some embodiments, the metering device includes a grid metering device. In some embodiments, the metering device measures power factor, and a change in the voltage and ratio of VARs to Watts.
摘要翻译: 所公开的系统包括用于监测电网条件的计量装置,用于确定计量装置是否正在检测指示延迟的电压恢复事件的电网上的状况的控制器,以及用于与一个或多个 远程定位的双向电源模块连接到电网,其中控制器被编程为通过通信设备向一个或多个远程位置的双向电源模块发送通知,如果控制器检测到指示延迟的状态 电压恢复事件。 在一些实施例中,计量装置包括网格计量装置。 在一些实施例中,计量装置测量功率因数,以及VAR的电压和比率变化到瓦特。
-
公开(公告)号:USRE49731E1
公开(公告)日:2023-11-21
申请号:US17246213
申请日:2021-04-30
申请人: SWELL ENERGY INC.
发明人: Ja-Chin Audrey Lee , Corey Noone , Kate Knox
CPC分类号: G06Q50/06 , G05B15/02 , G05F1/66 , G06Q30/04 , H02J3/32 , H02J13/00 , H02J13/00006 , H02J13/00034 , H02J3/003 , H02J2203/20 , Y02E40/70 , Y02E60/00 , Y04S10/14 , Y04S10/50 , Y04S40/12 , Y04S40/20 , Y04S50/12
摘要: Various embodiments are provided for facilitating the operation and control of a fleet of on-site energy assets and optimizing energy dispatch across the fleet, thereby facilitating the use of the on-site energy assets instead of grid-supplied electric consumption. An example system may comprise a central platform and a plurality of on-site gateway devices configured to perform on-site asset control. An example method may comprise receiving a service availability call, performing fleet-level optimization, generating a set of site-level schedules, and causing, as a function of the site-level schedules, real-time on-site asset control. Other embodiments provide for determining a location of each grid-connected energy consumer at which to reduce grid-supplied energy consumption, determining an amount of a reduction of grid-supplied energy consumption, and transmitting a signal to each corresponding gateway device located at the determined location, the signal comprising data indicative of instructions for performing on-site energy dispatch.
-
公开(公告)号:US20230367348A1
公开(公告)日:2023-11-16
申请号:US18360743
申请日:2023-07-27
申请人: STEM, INC.
发明人: Ben KEARNS , Jon BURLINSON , Drew STEVENS
CPC分类号: G05F1/66 , H02J3/00 , H02J3/32 , H02J13/00002 , H02J13/00034 , H02J4/00 , G06Q50/06 , G05B13/026 , H02J13/00 , Y04S10/14 , H02J3/003 , Y02E40/70 , Y02E60/00 , Y02P80/10 , Y04S10/50 , G05B2219/39361
摘要: A control system for an energy storage system located behind a utility meter uses a unique, feedback-based, communication and control method to reliably and efficiently maximize economic return of the energy storage system. Operating parameters for the energy storage system are calculated at an external, centralized data center, and are selected to prevent electrical power demand of an electric load location from exceeding a specified set-point by discharging energy storage devices, such as DC batteries, through a bidirectional energy converter during peak demand events. The control system can operate autonomously in the case of a communications failure.
-
公开(公告)号:US20230307910A1
公开(公告)日:2023-09-28
申请号:US18319413
申请日:2023-05-17
CPC分类号: H02J3/06 , G06Q50/06 , H02J3/003 , H02J3/008 , H02J3/32 , H02J3/38 , H02J3/381 , H02J3/46 , H02J13/00016 , H02J2300/20 , H02J2300/22 , H02J2300/24 , H02J2300/28 , Y02E10/56 , Y02E40/70 , Y02E60/00 , Y02E70/30 , Y04S10/123 , Y04S10/14 , Y04S40/124 , Y04S40/126 , Y04S50/10
摘要: A method and system for controlling the transfer of electrical power between a first electrical network and a second electrical network is disclosed. The method includes receiving at the second electrical network pricing information from the first electrical network, the pricing information associated with the supply of electrical power between the first electrical network and the second electrical network and modifying a demand characteristic of the second electrical network based on the pricing information.
-
-
-
-
-
-
-
-
-