公开(公告)号:US10007285B2
公开(公告)日:2018-06-26
申请号:US14178818
申请日:2014-02-12
发明人: Vijay Arya , Tanuja Hrishikesh Ganu , Shivkumar Kalyanaraman , Jimmy Lim Chee Ming , Devasenapathi Periagraharam Seetharamakrishnan
IPC分类号: G05F1/66 , H02J3/32 , H02J3/38 , H02J7/35 , H02J13/00 , H02J3/00 , G05D3/12 , G05D5/00 , G05D9/00 , G05D11/00 , G05D17/00
CPC分类号: G05F1/66 , H02J3/008 , H02J3/32 , H02J3/382 , H02J3/385 , H02J7/35 , H02J13/0062 , Y02E10/58 , Y02E40/72 , Y02E60/722 , Y02E60/7838 , Y02E70/30 , Y04S10/123 , Y04S10/14 , Y04S40/124 , Y04S50/10
摘要: Methods and arrangements for managing electricity generation in a distributed electricity generation system. A plurality of data inputs are received comprising: a sensed state of a power grid; a sensed state of local energy storage; and a sensed demand of a local electricity load. The data inputs are combined, and, based on the combined data inputs, there is determined a destination of electricity that is generated in the distributed electricity generation system. The at least one destination is selected from the group consisting of: a local electricity load, the power grid, and the local energy storage. Other variants and embodiments are broadly contemplated herein.
-
公开(公告)号:US09985437B2
公开(公告)日:2018-05-29
申请号:US14497588
申请日:2014-09-26
CPC分类号: H02J3/28 , H02J3/30 , H02J13/002 , H02J13/0062 , H02J13/0075 , Y02E60/16 , Y02E60/722 , Y02E60/7815 , Y02E60/7838 , Y02E60/7853 , Y04S10/14 , Y04S40/121 , Y04S40/124 , Y04S40/126
摘要: A combined electrical power plant is provided to supply power to a grid and a method to operate such a combined electrical power plant comprising a thermal power generation facility and an energy storage facility with a suitable energy storage capacity being able to supply additional electrical power to the grid and to receive and store electrical power from the thermal power generation facility or from the grid. Both facilities are electrically coupled to providing a combined power output to the grid and further comprise a plant controller to process the demand signal and to generate at least a first control signal and a second control signal from the demand signal, where the first control signal is a smoothened function of time of the demand signal resulting from a smoothening process executed by the plant controller taking into account operational characteristics of the thermal power generation facility.
-
公开(公告)号:US09880580B2
公开(公告)日:2018-01-30
申请号:US15425618
申请日:2017-02-06
申请人: Causam Energy, Inc.
IPC分类号: G06F19/00 , G05F1/66 , G06Q30/04 , G06Q40/04 , G06Q50/06 , G05B15/02 , H02J3/00 , H02J9/06 , H02J13/00
CPC分类号: G05F1/66 , G05B15/02 , G06F1/30 , G06Q30/04 , G06Q40/04 , G06Q50/06 , H02J3/008 , H02J3/32 , H02J3/381 , H02J9/06 , H02J9/062 , H02J9/08 , H02J13/00 , H02J13/0013 , Y02B10/72 , Y02B70/3291 , Y02B90/222 , Y02E40/72 , Y02E60/722 , Y04S10/12 , Y04S10/14 , Y04S10/54 , Y04S10/58 , Y04S20/12 , Y04S20/248 , Y04S50/12
摘要: Systems and methods for coordinating selective activation of at least one power storage device over a predetermined geographic area to supply a microgrid of electrical power, and automatic, selective disconnect any of the at least one power storage device from providing power supply to a microgrid or a wider area grid.
-
公开(公告)号:US09859754B2
公开(公告)日:2018-01-02
申请号:US14272611
申请日:2014-05-08
CPC分类号: H02J13/001 , G01R19/2513 , G01R19/2516 , G01R31/2846 , G01R31/40 , G05B23/0272 , H02J3/32 , H02J13/0003 , H02J13/0096 , Y02B90/228 , Y02E60/722 , Y02E60/74 , Y04S10/14 , Y04S10/30 , Y04S10/40 , Y04S10/522 , Y04S20/18
摘要: A computer-implemented method includes linking a plurality of load distribution points in a power distribution unit to a plurality of electrical loads in response to user input, receiving data indicative of one or more electrical parameters associated with the plurality of load distribution points, selecting a visual indicator from a group of indicators based on the one or more electrical parameters associated with the load distribution point for each of the plurality of load distribution points, and displaying the selected visual indicators for the plurality of load distribution points on a visual display for viewing by a user. Each of the electrical loads are electrically coupled to one or more of the plurality of load distribution points. Example computer systems and non-transitory computer readable medium including computer executable instructions for performing one or more computer-implemented methods are also disclosed.
-
公开(公告)号:US20170279298A1
公开(公告)日:2017-09-28
申请号:US15078367
申请日:2016-03-23
发明人: Zhiwu Li , Zhongyuan Jiang , Naiqi Wu , Mengchu Zhou
CPC分类号: H02J9/06 , G01R31/40 , H02J3/28 , H02J13/001 , H02J2003/007 , Y02E60/722 , Y02E60/723 , Y02E60/76 , Y04S10/14 , Y04S10/16 , Y04S10/40 , Y04S40/22
摘要: A power transmission system includes a plurality of electrical substations and a plurality of transmission lines arranged to connect the plurality of electrical substations to form a power transmission network; and a controller system arranged to control a power transmission within the power transmission network. The controller system includes: a detection module arranged to detect an occurrence of a fault in at least one faulty electrical substation of the plurality of electrical substations; and a restoration module arranged to at least temporally maintain an output power of the at least one faulty electrical substation; and wherein at least one of the plurality of electrical substations is operable to facilitate maintaining of the output of the at least one faulty electrical substation upon the detection of the occurrence of the fault.
-
公开(公告)号:US09772643B2
公开(公告)日:2017-09-26
申请号:US14532913
申请日:2014-11-04
IPC分类号: G06F19/00 , G05F1/66 , G05B13/02 , G06Q40/04 , G05B13/04 , G06F17/10 , G06Q10/06 , H02J3/00 , H02J3/28 , H02J13/00 , G06Q50/06 , G06Q10/00 , G05B15/02
CPC分类号: G05F1/66 , G05B13/02 , G05B13/04 , G05B15/02 , G05B2219/2642 , G06F17/10 , G06F2217/78 , G06Q10/00 , G06Q10/06 , G06Q40/04 , G06Q50/06 , H02J3/008 , H02J3/28 , H02J13/0006 , H02J13/0062 , H02J13/0075 , H02J13/0079 , H02J2003/007 , Y02B70/3216 , Y02B90/2638 , Y02B90/2653 , Y02E60/722 , Y02E60/76 , Y02E60/7838 , Y02E60/7853 , Y02P90/84 , Y04S10/14 , Y04S10/54 , Y04S20/221 , Y04S20/224 , Y04S40/124 , Y04S40/126 , Y04S40/22 , Y04S50/10
摘要: The apparatuses and methods herein facilitate generation of energy-related revenue for an energy customer of an electricity supplier, for a system that includes an energy storage asset. The apparatuses and methods herein can be used to generate operating schedules for a controller of the energy storage asset. When implemented, the generated operating schedules facilitates derivation of the energy-related revenue, over a time period T, associated with operation of the at least one energy storage asset according to the generated operating schedule. The energy-related revenue available to the energy customer over the time period T is based at least in part on a wholesale electricity market.
-
7.
公开(公告)号:US20170220013A1
公开(公告)日:2017-08-03
申请号:US15500471
申请日:2015-07-15
申请人: NEC Corporation
发明人: Koji KUDO , Hisato SAKUMA , Hitoshi YANO
IPC分类号: G05B19/042
CPC分类号: G05B19/042 , G05B2219/25318 , G05B2219/2639 , G06Q50/06 , H02J3/32 , H02J13/00 , H04Q9/00 , Y02E60/722 , Y04S10/14
摘要: When executing adjustment processing in the power supply/demand adjustment processing of a DR (demand response) system, the present invention can prevents the selection, as a power supply/demand adjustment device to be used (device to be used), of a power supply/demand adjustment device that does not satisfy the characteristics of the adjustment processing. This control device (A) is provided with: an acquisition unit (A1) that acquires information that relates to power supply/demand adjustment devices and that is indicated for each power supply/demand adjustment device and information indicating characteristics of the power supply/demand adjustment processing; and a reporting unit (A2) that, on the basis of the information that relates to the power supply/demand adjustment devices and information that indicates characteristics of the power supply/demand adjustment processing, reports an actuation of the power supply/demand adjustment processing to power supply/demand adjustment devices that are to be used for the power supply/demand adjustment processing.
-
公开(公告)号:US09692243B2
公开(公告)日:2017-06-27
申请号:US14440925
申请日:2013-11-19
发明人: Mitsuru Kaji , Kenichi Watanabe , Hoday Stearns
CPC分类号: H02J7/0068 , H02J3/32 , H02J13/0006 , Y02E60/722 , Y04S10/14
摘要: Provided is a frequency regulation method for regulating a frequency of a power system so that the frequency approximates to a rated frequency, the method including: measuring the frequency; obtaining an SOC (state of charge) of a storage battery; determining a base-point of power to be charged in or discharged from the storage battery when the measured frequency is equal to a predetermined rated frequency; determining a control variable changed from the base-point by an amount corresponding to a frequency deviation that is a difference between the predetermined rated frequency and the measured frequency; and charging or discharging the storage battery based on the control variable, wherein in the determining a base-point, a third rate of change is smaller than a first rate of change and a second rate of change that are average rates of change in the base-point with respect to the SOC when the SOC is within a first range and a second range, respectively.
-
公开(公告)号:US20170126032A1
公开(公告)日:2017-05-04
申请号:US14932688
申请日:2015-11-04
发明人: Virgil Lee BEASTON
CPC分类号: H02J7/0022 , H01M10/4207 , H02J3/16 , H02J3/32 , H02J7/0016 , H02J7/0021 , H02J7/0026 , H02J7/0034 , H02J7/0047 , H02J7/0068 , H02J13/0006 , H02J13/0075 , H02J13/0079 , H02J2007/0037 , H02J2007/0039 , H02J2007/004 , Y02E40/10 , Y02E40/34 , Y02E40/74 , Y02E60/722 , Y02E60/726 , Y02E60/74 , Y02E70/30 , Y04S10/14 , Y04S10/22 , Y04S10/24 , Y04S10/30
摘要: Embodiments disclosed herein relate to a battery energy storage system (BESS) that can be used to store energy that is produced by conventional sources (e.g., coal, gas, nuclear) as well as renewable sources (e.g., wind, solar), and provide the stored energy on-demand.
-
公开(公告)号:US09630511B2
公开(公告)日:2017-04-25
申请号:US14197755
申请日:2014-03-05
发明人: Kazuyuki Higashi
CPC分类号: B60L11/18 , B60L11/1838 , H02J3/32 , H02J3/46 , H02J7/0013 , H02J13/0006 , Y02E60/721 , Y02E60/722 , Y02T10/7005 , Y02T10/7055 , Y02T10/7072 , Y02T90/121 , Y02T90/128 , Y02T90/14 , Y02T90/163 , Y04S10/126 , Y04S10/14
摘要: A vehicle-to-grid system connected to a power grid includes a first vehicle group of one or more vehicles connected to the power grid, a second vehicle group of one or more vehicles connected to the power grid, and a vehicle-to-grid controller. The vehicle-to-grid controller causes each vehicle from the second vehicle group to supply electrical power to the power grid at a nominal frequency and at an adjusted amplitude, and causes each vehicle from the first vehicle group to supply electrical power to the power grid at an adjusted frequency that is different than the nominal frequency and at a nominal amplitude that is different than the adjusted amplitude.
-
-
-
-
-
-
-
-
-