-
公开(公告)号:US11296511B2
公开(公告)日:2022-04-05
申请号:US17107104
申请日:2020-11-30
Applicant: CON EDISON BATTERY STORAGE, LLC
Inventor: Michael J. Wenzel , Brett M. Lenhardt , Kirk H. Drees
IPC: H02J3/32 , G01R31/367 , G01R31/392 , H02J3/38 , H02J7/00 , G01R31/44
Abstract: An electrical energy storage system includes a battery configured to store and discharge electric power to an energy grid, a power inverter configured to use battery power setpoints to control an amount of the electric power stored or discharged from the battery, the battery power setpoints comprising at least one of frequency regulation power setpoints and ramp rate control power setpoints, and a controller. The controller is configured to use a battery life model to generate the battery power setpoints for the power inverter. The battery life model includes one or more variables that depend on the battery power setpoints.
-
公开(公告)号:US11258260B2
公开(公告)日:2022-02-22
申请号:US17021170
申请日:2020-09-15
Applicant: CON EDISON BATTERY STORAGE, LLC
Inventor: Radu Dorneanu , Michael J. Wenzel , Mohammad N. Elbsat , Kirk H. Drees , Andrew J. Przybylski
Abstract: An optimization controller for a battery includes a high level controller configured to receive a regulation signal from an incentive provider cat a data fusion module, determine statistics of the regulation signal, and use the statistics of the regulation signal to generate a frequency response midpoint. The optimization controller further includes a low level controller configured to use the frequency response midpoint to determine optimal battery power setpoints and use the optimal battery power setpoints to control an amount of electric power stored or discharged from the battery during a frequency response period.
-
公开(公告)号:US11137731B2
公开(公告)日:2021-10-05
申请号:US16580385
申请日:2019-09-24
Applicant: Con Edison Battery Storage, LLC
Inventor: Mohammad N. Elbsat , Michael J. Wenzel , Kirk H. Drees
Abstract: An energy storage system for a building includes a battery asset configured to store electricity and discharge the stored electricity for use in satisfying a building electric load. The system includes a planning tool configured to identify one or more selected functionalities of the energy storage system and generate a cost function defining a cost of operating the energy storage system over an optimization period. The cost function includes a term for each of the selected functionalities. The planning tool is configured to generate optimization constraints based on the selected functionalities, attributes of the battery asset, and the electric energy load to be satisfied. The planning tool is configured to optimize the cost function to determine optimal power setpoints for the battery asset at each of a plurality of time steps of the optimization period.
-
公开(公告)号:US20200088804A1
公开(公告)日:2020-03-19
申请号:US16595981
申请日:2019-10-08
Applicant: Con Edison Battery Storage, LLC
Inventor: Kirk H. Drees
IPC: G01R31/389 , G01R31/392 , H01M10/42 , G01R31/382 , H01M10/48
Abstract: An electrical energy storage system includes a battery container, one or more temperature sensors, and a controller. The battery container includes one or more batteries configured to store and discharge electrical energy. The temperature sensors are configured to measure one or more temperatures associated with the battery container. The controller is configured to estimate a rate of heat generation by the one or more batteries based on the measured temperatures, monitor an electric current provided to the one or more batteries, and estimate a resistance of the one or more batteries based on the estimated rate of heat generation and the electric current.
-
公开(公告)号:US10564610B2
公开(公告)日:2020-02-18
申请号:US15247788
申请日:2016-08-25
Applicant: Con Edison Battery Storage, LLC
Inventor: Kirk H. Drees
Abstract: A photovoltaic energy system includes a photovoltaic field configured to convert solar energy into electrical energy, cloud detectors configured to detect a cloud approaching the photovoltaic field, and a controller. The controller uses the cloud detectors to predict a disturbance in the electric power output of the photovoltaic energy system. The controller determines a time at which the disturbance is expected to occur and determines an amount by which the electric power output is expected to decrease. The controller can preemptively adjust the electric power output of the photovoltaic energy system in accordance with a predetermined ramp rate.
-
公开(公告)号:US10436851B2
公开(公告)日:2019-10-08
申请号:US15406596
申请日:2017-01-13
Applicant: Con Edison Battery Storage, LLC
Inventor: Kirk H. Drees
IPC: G01R31/389 , G01R31/367 , G01R31/382 , H01M10/48 , H01M10/42 , G01R31/392 , H02J3/32
Abstract: An electrical energy storage system includes a battery container, one or more temperature sensors, and a controller. The battery container includes one or more batteries configured to store and discharge electrical energy. The temperature sensors are configured to measure one or more temperatures associated with the battery container. The controller is configured to estimate a rate of heat generation by the one or more batteries based on the measured temperatures, monitor an electric current provided to the one or more batteries, and estimate a resistance of the one or more batteries based on the estimated rate of heat generation and the electric current.
-
公开(公告)号:US10418833B2
公开(公告)日:2019-09-17
申请号:US15247885
申请日:2016-08-25
Applicant: Con Edison Battery Storage, LLC
Inventor: Michael J. Wenzel , Kirk H. Drees , Mohammad N. ElBsat
IPC: H02J7/00 , G01R31/36 , H02J3/38 , G01R31/382 , H02J3/14 , H02J3/32 , H02J3/00 , H02J3/24 , H02J7/35 , H02J13/00
Abstract: A frequency response controller includes a high level controller configured to receive a regulation signal from an incentive provider, determine statistics of the regulation signal, and use the statistics of the regulation signal to generate a frequency response midpoint. The controller further includes a low level controller configured to use the frequency response midpoint to determine optimal battery power setpoints and use the optimal battery power setpoints to control an amount of electric power stored or discharged from a battery during a frequency response period.
-
8.
公开(公告)号:US20190219295A1
公开(公告)日:2019-07-18
申请号:US16228422
申请日:2018-12-20
Applicant: Con Edison Battery Storage, LLC
Inventor: Michael J. Wenzel , Kirk H. Drees , Mohammad N. ElBsat
IPC: F24F11/62 , G05B19/406 , F24F11/52 , G06Q50/06 , H02J3/28 , H02J15/00 , H02J7/00 , F24F11/30 , F24F11/47 , H02J3/38 , H02S40/32 , F24F11/83 , F24F11/46 , F24F11/84 , F24F11/63 , G05B13/02 , F24F11/77 , F24F11/64 , F24F5/00 , H02J3/00 , H02J3/14 , H02J3/32 , H02J7/35 , H02J13/00 , F24F11/58 , G05B15/02
Abstract: A frequency response optimization system includes a battery configured to store and discharge electric power, a power inverter configured to control an amount of the electric power stored or discharged from the battery at each of a plurality of time steps during a frequency response period, and a frequency response controller. The frequency response controller is configured to receive a regulation signal from an incentive provider, determine statistics of the regulation signal, use the statistics of the regulation signal to generate an optimal frequency response midpoint that achieves a desired change in a state-of-charge (SOC) of the battery while participating in a frequency response program, and use the midpoints to determine optimal battery power setpoints for the power inverter. The power inverter is configured to use the optimal battery power setpoints to control the amount of the electric power stored or discharged from the battery.
-
公开(公告)号:US12181848B2
公开(公告)日:2024-12-31
申请号:US18337230
申请日:2023-06-19
Applicant: Con Edison Battery Storage, LLC
Inventor: Mohammad N. Elbsat , Michael J. Wenzel , Kirk H. Drees
IPC: G05B19/042 , H02J3/00 , H02J3/32 , H02J5/00 , H02J7/34
Abstract: An energy storage system for a building includes a battery asset configured to store electricity and discharge the stored electricity for use in satisfying a building electric load. The system includes a planning tool configured to identify one or more selected functionalities of the energy storage system and generate a cost function defining a cost of operating the energy storage system over an optimization period. The cost function includes a term for each of the selected functionalities. The planning tool is configured to generate optimization constraints based on the selected functionalities, attributes of the battery asset, and the electric energy load to be satisfied. The planning tool is configured to optimize the cost function to determine optimal power setpoints for the battery asset at each of a plurality of time steps of the optimization period.
-
10.
公开(公告)号:US11009251B2
公开(公告)日:2021-05-18
申请号:US16821663
申请日:2020-03-17
Applicant: CON EDISON BATTERY STORAGE, LLC
Inventor: Michael J. Wenzel , Kirk H. Drees , Mohammad N. Elbsat
IPC: H01M10/44 , H01M10/46 , F24F11/62 , G05B15/02 , G06Q50/06 , H02J3/28 , H02J15/00 , H02J3/00 , H02J3/14 , H02J3/32 , H02J3/38 , H02J7/35 , H02J13/00 , F24F11/47 , H02S40/32 , H02J7/00 , F24F11/77 , F24F11/63 , F24F11/84 , F24F11/64 , F24F11/46 , F24F11/83 , F24F11/30 , F24F11/52 , F24F11/58 , F24F5/00 , G05B13/02 , G05B19/406 , F24F140/60 , F24F140/50 , F24F130/00 , F24F130/10 , F24F110/10
Abstract: A frequency response optimization system includes a battery configured to store and discharge electric power, a power inverter configured to control an amount of the electric power stored or discharged from the battery at each of a plurality of time steps during a frequency response period, and a frequency response controller. The frequency response controller is configured to receive a regulation signal from an incentive provider, determine statistics of the regulation signal, use the statistics of the regulation signal to generate an optimal frequency response midpoint that achieves a desired change in a state-of-charge (SOC) of the battery while participating in a frequency response program, and use the midpoints to determine optimal battery power setpoints for the power inverter. The power inverter is configured to use the optimal battery power setpoints to control the amount of the electric power stored or discharged from the battery.
-
-
-
-
-
-
-
-
-